Line 27 | |
---|---|
27 | |
Overview | |
Status | Under construction |
Locale | Shenzhen, Guangdong |
Termini |
|
Stations | 21 (Phase 1) |
Service | |
Type | Rapid transit |
System | Shenzhen Metro |
Services | 2 |
Operator(s) | SZMC (Shenzhen Metro Group) |
Technical | |
Line length | 25.6km (Phase 1) |
Character | Underground |
Operating speed | 80km/h |
Line 27 of the Shenzhen Metro is a line under construction, which will connect the districts of Nanshan, Longhua and Longgang. Construction began on 25 April 2024. The first phase of Line 27 will run from Songpingcun in Nanshan District near Xili High Speed Railway Station to Gangtou West in Longgang District, and from Jihua Hospital to Lizhi Orchard in Longgang District, with 21 stations and 25.6 kilometers of track. The line is proposed to use 6 car type B trains.
Stations (Phase 1)
Station name | Connections | Location | ||||
---|---|---|---|---|---|---|
English | Chinese | |||||
Songpingcun | 松坪村 | Nanshan | ||||
Xili High Speed Railway Station | 西丽高铁站 | 13 15 29 Shenhui ELQ | ||||
Wenguang | 文光 | |||||
Xili | 西丽 | 5 7 | ||||
Lishan | 丽山 | |||||
Lishui | 丽水 | |||||
SZU Lihu Campus | 深大丽湖 | 7 | ||||
Nanshan Science Campus of SZU | 南科大 | |||||
Changlingpi | 长岭陂 | 5 | ||||
Shenzhen North Station West Square | 北站西广场 | 4 5 6 (via Shenzhen North) XS GSH IOQ |
Longhua | |||
Minfeng Road | 民丰路 | |||||
Baishilong | 白石龙 | 4 | ||||
Minkang | 民康 | |||||
Minbao | 民宝 | |||||
Huacheng | 华城 | |||||
Yinquan | 银泉 | |||||
Youfu | 油福 | 25 | ||||
Songhe | 松和 | 22 | ||||
Gangtou West | 岗头西 | Longgang | ||||
Jihua Hospital | 吉华医院 | 25 | Longgang | |||
Yangmei North | 杨美北 | |||||
References
- 多条地铁规划涉及宝安!深圳市城市轨道交通第五期建设规划公示. www.sznews.com. 2022-08-27.
- 新增13条地铁!深圳轨道交通第五期规划环评首次公示,速看. mp.weixin.qq.com. 2022-08-28.
- 地铁五期13条线路规划公布. www.sz.gov.cn. 2022-09-07.
Shenzhen Metro lines | |
---|---|
Lines in operation | |
Under construction | |
Under planning |