Misplaced Pages

Line 27 (Shenzhen Metro)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Future Shenzhen Metro line
Line 27
27
Overview
StatusUnder construction
LocaleShenzhen, Guangdong
Termini
Stations21 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services2
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Line length25.6km (Phase 1)
CharacterUnderground
Operating speed80km/h

Line 27 of the Shenzhen Metro is a line under construction, which will connect the districts of Nanshan, Longhua and Longgang. Construction began on 25 April 2024. The first phase of Line 27 will run from Songpingcun in Nanshan District near Xili High Speed Railway Station to Gangtou West in Longgang District, and from Jihua Hospital to Lizhi Orchard in Longgang District, with 21 stations and 25.6 kilometers of track. The line is proposed to use 6 car type B trains.

Line 27 full alignment (in Chinese)

Stations (Phase 1)

Station name Connections Location
English Chinese
Songpingcun 松坪村 Nanshan
Xili High Speed Railway Station 西丽高铁站  13   15   29   Shenhui 
China Railway High-speed ELQ
Wenguang 文光
Xili 西丽 5 7
Lishan 丽山
Lishui 丽水
SZU Lihu Campus 深大丽湖  7 
Nanshan Science Campus of SZU 南科大
Changlingpi 长岭陂 5
Shenzhen North Station West Square 北站西广场 4 5 6 (via Shenzhen North)
 XS   GSH  China Railway High-speed IOQ
Longhua
Minfeng Road 民丰路
Baishilong 白石龙 4
Minkang 民康
Minbao 民宝
Huacheng 华城
Yinquan 银泉
Youfu 油福  25 
Songhe 松和  22 
Gangtou West 岗头西 Longgang
Jihua Hospital 吉华医院  25  Longgang
Yangmei North 杨美北

References

  1. 多条地铁规划涉及宝安!深圳市城市轨道交通第五期建设规划公示. www.sznews.com. 2022-08-27.
  2. 新增13条地铁!深圳轨道交通第五期规划环评首次公示,速看. mp.weixin.qq.com. 2022-08-28.
  3. 地铁五期13条线路规划公布. www.sz.gov.cn. 2022-09-07.
Shenzhen Metro lines
Lines in operation
Under construction
Under planning
Categories: