Misplaced Pages

Line 4 (Wuhan Metro)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Line of Wuhan Metro
Line 4
Wangjiawan Station
Overview
Other name(s)Caidian line (蔡甸线) (Western extension)
OwnerWuhan
LocaleWuhan, Hubei
Termini
Stations37
Service
TypeRapid transit
SystemWuhan Metro
Services1
Operator(s)Wuhan Metro Group Co., Ltd.
Rolling stockCRRC Zhuzhou Locomotive Chinese Type B
Daily ridership750,000 (2017 Daily)
History
OpenedDecember 28, 2013; 10 years ago (2013-12-28)
Technical
Line length49.693 km (30.88 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Route map

Legend
Qingshan Depot
Wuhan Third Ring Expressway
Beijing-Hong Kong HSR
Wuhan railway station
Yangchunhu
Gongye Fourth Road
Renhe Road
Yuanlin Road
Luojiagang
Wuhan Second Ring Expressway
Tieji Road
Yuejiazui Line 8  8 
Dongting
Qingyuzui
Chuhe Hanjie
Line 2
Hongshan Square  2 
Zhongnan Road  2 
Line 2
Meiyuanxiaoqu
Jingguang Railway
Wuchang railway station China Railway
Phase 1
Phase 2
Shouyi Road
Fuxing Road Line 5  5 
tunnel under Yangtze River
Lanjiang Road
Zhongjiacun Line 6  6 
freight line
Hanyang railway station China Railway
Jingguang Railway
Wulidun
Qilimiao
Shilipu
Wangjiawan Line 3  3 
Wuhan Second Ring Expressway
Yulong Road
Yong'antang
Mengjiapu
Wuhan Third Ring Expressway
Huangjinkou
Huangjinkou yard
This diagram:

The Line 4 of Wuhan Metro (Chinese: 武汉地铁4号线) is the third line in Wuhan Metro system, and it will be the second metro line crossing the Yangtze river in Wuhan. It is colored grass-green, which is the identifying color of this line, which would appear on its trains, station signs, and the official subway map.

The whole construction was divided into two parts, being phase 1 and 2, which opened in 2013 and 2014, respectively. Phase 1, opened on December 28, 2013, runs through Wuchang in a northeast-southwest direction, connecting Wuhan Railway Station, Wuchang Railway Station and major commercial districts. Phase 2 opened a year later and runs in an east-west direction, linking Hanyang and Wuchang, tunneling through the Yangtze river in the proximity of the first Yangtze river bridge and connecting with phase 1 at Wuchang railway station.

The opening of phase 1 of Line 4 will form the skeleton of Wuhan's metro system. Right after its opening, the system (including Line 1, 2, and 4) will be able to accommodate millions of passengers a day, where a large proportion of them will be the cross-Yangtze passengers. But all stations on line 4 have been designed only to accommodate a six-car train (type B) in length and have no possibility to extend for future upgrading.

Overview

Map of Line 4
Tunnels under construction

History

  • Phase 1 opened on December 28, 2013.
  • Phase 2 opened on December 28, 2014.
  • Caidian line (Western extension) opened on 25 September 2019.
Segment Commencement Length Station(s) Name
Wuchang Railway Station — Wuhan Railway Station 28 December 2013 15.429 km (9.59 mi) 15 Phase 1
Huangjinkou — Wuchang Railway Station 28 December 2014 17.974 km (11.17 mi) 13 Phase 2
Huangjinkou — Bailin 25 September 2019 16.068 km (9.98 mi) 9 Caidian line (Western extension)

Stations

Entrance of Chuhehanjie station.
Service
routes
Station name Connections Distance
km
Location
English Chinese
Bailin 柏林 0.000 0.000 Caidian
Xinmiaocun 新庙村 1.417 1.417
Linzhang Boulevard 临嶂大道 2.081 3.498
Caidian Square 蔡甸广场 1.241 4.739
Fenghuang Road 凤凰路 2.148 6.887
Xinnong 新农 1.453 8.340
Zhiyin 知音 1.820 10.160
Jixian 集贤 2.011 12.171
Xintian 新天 1.367 13.538
Huangjinkou 黄金口 2.750 16.288 Hanyang
Mengjiapu 孟家铺 2.762 19.050
Yong'antang 永安堂 1.479 20.529
Yulong Road 玉龙路 1.243 21.772
Wangjiawan 王家湾  3  0.901 22.673
Shilipu 十里铺 0.950 23.623
Qilimiao 七里庙 1.204 24.827
Wulidun 五里墩 1.124 25.951
Hanyang Railway Station 汉阳火车站 Hanyang railway station HYN 1.012 26.963
Zhongjiacun 钟家村  6  1.574 28.537
Lanjiang Road 拦江路 0.834 29.371
Fuxing Road 复兴路  5  3.278 32.649 Wuchang
Shouyi Road 首义路 0.718 33.367
Wuchang Railway Station 武昌火车站  7   WXN  China Railway Wuchang railway station WCN 0.897 34.264
Meiyuan­xiaoqu 梅苑小区 0.900 35.164
Zhongnan Road 中南路  2  1.095 36.259
Hongshan Square 洪山广场  2  0.966 37.225
Chuhe Hanjie 楚河汉街 1.077 38.302
Qingyuzui 青鱼嘴 1.226 39.528
Dongting 东亭 1.048 40.576
Yuejiazui 岳家嘴  8  0.928 41.504 Wuchang / Hongshan
Tieji Road 铁机路 1.032 42.536 Hongshan
Luojiagang 罗家港 1.171 43.707
Yuanlin Road 园林路 1.036 44.743
Renhe Road 仁和路 1.333 46.076
Gongye 4th Road 工业四路 1.634 47.710
Yangchunhu 杨春湖 1.173 48.883
Wuhan Railway Station 武汉火车站  5   19   WS   WG  Wuhan railway station China Railway WHN 0.810 49.693
  1. Out of system transfer at East Square of Wuhan Railway Station
  2. Out of system transfer at West Square of Wuhan Railway Station

Rolling stock

  • Line 4 train Line 4 train
  • Inside the train Inside the train
  • Interior LCD Interior LCD
Type Time of manufacturing Sets Assembly Notes
Type B 2012–2013 15 Tc+M+M+M+M+Tc Manufactured by Zhuzhou Electric Locomotive Co., Ltd.
Type B 2014 24 Tc+M+M+M+M+Tc
Type B 2018 31 Tc+M+M+M+M+Tc

The rolling stock for Line 4 is a 6-car train, with 100 km/h (62 mph) of max speed, 80 km/h (50 mph) of operation max speed, and 36.6 km/h (22.7 mph) average speed. The collection shoe is on the lower part of the vehicle. The third rail is a mix of steel and aluminum. A full train provides 176 seats, and can carry 1276 passengers by Chinese regulation of 9 people per square meter.

See also

References

  1. ^ "被调侃开往德国 武汉地铁柏林站注音改为"bailin"". 2019-10-04.
  2. "武汉地铁客流爆棚连续两天刷新纪录". Archived from the original on 2017-08-25. Retrieved 2017-04-03.
  3. ^ "地铁4号线昨日开通 武汉地铁网络时代开启". Retrieved 2013-12-28.
  4. 武汉步入立体交通时代 2015年建成六桥一隧三地铁 (in Chinese). 荆楚网. 2008-12-22. Retrieved 2010-01-23.
  5. 武汉地铁4号线通车首日迎送七万市民
  6. 地鐵4號綫二期12月28日試運營 結束漢陽無地鐵歷史 (in Chinese). 荊楚網. Retrieved 2014-12-11.
  7. "定了!地铁蔡甸线25日上午9时开通". 2019-09-23.
  8. "蔡甸线三大特色站亮相". 2019-09-20.
  9. ^ Yan Yuntao (严运涛) (2011-08-19). 武汉4亿元购买地铁4号线列车 (in Chinese). 荆楚网. Archived from the original on 2013-12-14. Retrieved 2011-08-20.
  10. "招标/资格预审公告 - 武汉市轨道交通四号线二期工程车辆系统采购项目".
  11. "招标/资格预审公告 - 武汉市轨道交通蔡甸线工程车辆系统采购项目".
  12. Wang Tianming (汪天明) (2011-08-19). 武汉4亿元采购90列车 装备地铁4号线 (in Chinese). Xinhua News. Archived from the original on 2017-09-08. Retrieved 2011-08-20.
Public transportation in Hubei Yangtze River Mid-Reaches Metropolitan Region (HB)
Wuhan Metro Wuhan Metro
Lines in operation
Under construction
  •  3  (phase 2)
  •  6  (phase 3)
  •  11  (phase 2, 3 & 4)
  •  12 
  •  Xingang 
  •  Yangluo  (western extension)
Monorail
Lines in operation
Trams in China Wuhan Tram
Lines in operation
Planned
Trams in China Huangshi Rail Transit
(tram)
Lines in operation
  •  1 
CR C-train
Lines in operation
Other CR railways
Corridors
Transportation hubs
List of airports in China Int'l airports
China Railway Railway stations
Ferry
Wuhan Metro stations
Line 4
Lines and stations that are proposed, under planning or under construction are shown in italics.
Categories: