Line 7 | |
---|---|
Overview | |
Other name(s) | Qianchuan line (前川线) (North extension) Zhifang line (纸坊线) (South extension) |
Status | Operating |
Owner | Government of Wuhan |
Locale | Wuhan, Hubei |
Termini | |
Stations | 36 |
Service | |
Type | Rapid transit |
System | Wuhan Metro |
Services | 1 |
Operator(s) | Wuhan Metro Group Co., Ltd. |
Rolling stock | CRRC Zhuzhou Locomotive Chinese Type A |
History | |
Opened | 1 October 2018; 6 years ago (2018-10-01) |
Technical | |
Line length | 83.6 km (51.9 mi) |
Number of tracks | 2 |
Character | Underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 7 of Wuhan Metro (Chinese: 武汉地铁7号线) is a metro line in Wuhan. The line runs from Huangpi Square station in Huangpi District to Qinglongshan Ditiexiaozhen station in Jiangxia District.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Garden Expo North — Yezhihu | 1 October 2018 | 30.413 km (18.90 mi) | 19 | Phase 1 |
Yezhihu — Qinglongshan Ditiexiaozhen | 28 December 2018 | 16.97 km (10.54 mi) | 7 | Zhifang line (Southern Extension) |
Garden Expo North — Hengdian | 30 December 2022 | 21.12 km (13.12 mi) | 7 | Qianchuan line (Northern Extension) |
Hengdian — Huangpi Square | 1 October 2024 | 15.11 km (9.39 mi) | 3 |
Stations
Route Map of Line 7Section | Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
Qianchuan line (Northern extension) |
Huangpi Square | 黄陂广场 | Huangpi | |||
Baitai Road | 百泰路 | |||||
Qingzicun (Rail Transit Industry Innovation Base) | 青仔村(轨道产业基地) | |||||
Yupengwan (reserved) | 余彭塆 | |||||
Hengdian | 横店 | |||||
Yufu Road | 裕福路 | |||||
Tianyang Boulevard | 天阳大道 | |||||
Tenglong Boulevard | 腾龙大道 | |||||
Julong Boulevard | 巨龙大道 | 2 | ||||
Tangyunhai Road | 汤云海路 | |||||
Machi | 马池 | Dongxihu | ||||
Phase 1 | Garden Expo North | 园博园北 | 6 | 0.000 | 0.000 | |
Garden Expo (Hankouli) | 园博园(汉口里) | 2.137 | 2.137 | Jianghan / Qiaokou | ||
Changmatou | 常码头 | 1.885 | 4.022 | Qiaokou | ||
Wuhan Business District | 武汉商务区 | 3 | 1.586 | 5.608 | Jianghan | |
Wangjiadun East | 王家墩东 | 2 | 1.482 | 7.090 | ||
Qushuilou | 取水楼 | 1.164 | 8.254 | |||
Xianggang Road | 香港路 | 3 6 | 1.458 | 9.712 | Jianghan / Jiang'an | |
Sanyang Road | 三阳路 | 1 | 1.846 | 11.558 | Jiang'an | |
Xujiapeng | 徐家棚 | 5 8 | 3.502 | 15.060 | Wuchang | |
Hubei University | 湖北大学 | 1.591 | 16.651 | |||
Xinhe Street | 新河街 | 2.067 | 18.718 | |||
Pangxiejia | 螃蟹岬 | 2 | 1.141 | 19.859 | ||
Xiaodongmen | 小东门 | 0.859 | 20.718 | |||
Wuchang Railway Station | 武昌火车站 | 4 WXN WCN | 1.374 | 22.092 | ||
Ruian Street | 瑞安街 | 1.860 | 23.952 | |||
Jian'an Street | 建安街 | 1.383 | 25.335 | Hongshan | ||
Hubei University of Technology | 湖工大 | 2.294 | 27.629 | |||
Banqiao | 板桥 | 1.067 | 28.696 | |||
Yezhihu | 野芷湖 | 8 | 1.717 | 30.413 | ||
Zhifang line (Southern extension) |
Xinlucun | 新路村 | 2.391 | 32.804 | ||
Dahualing | 大花岭 | 3.438 | 36.242 | Jiangxia | ||
Jiangxiaketing | 江夏客厅 | 2.507 | 38.749 | |||
Tanxinpei Park | 谭鑫培公园 | 2.000 | 40.749 | |||
Beihua Street | 北华街 | 1.610 | 42.359 | |||
Zhifang Avenue | 纸坊大街 | 1.361 | 43.720 | |||
Qinglongshan Ditiexiaozhen | 青龙山地铁小镇 | 3.243 | 46.963 | |||
References
- "First Wuhan-made A-type metro train rolls off the production line". 2016-12-08.
- "Wuhan opens two more metro lines". International Railway Journal. 2018-10-01. Retrieved 2020-09-23.
- "武汉地铁纸坊线今日开通 地铁总运营里程达到305公里". China National Radio. 2018-12-28. Retrieved 2020-09-21.
- "明日,武汉这两条地铁开通初期运营!". 2022-12-29.
- "武汉地铁站陆续更新线网图,两条新线开通进入倒计时". 2022-12-10. Archived from the original on 2022-12-11.
- "明天,武汉地铁7号线北延线(前川线)二期工程开通初期运营". 长江云. 2024-09-30.
- ^ "今天,新线开通!武汉地铁线网里程突破500公里". 2024-10-01.
Public transportation in Hubei Yangtze River Mid-Reaches Metropolitan Region (HB) | |||||||
---|---|---|---|---|---|---|---|
Wuhan Metro |
| ||||||
Monorail |
| ||||||
Wuhan Tram |
| ||||||
Huangshi Rail Transit (tram) |
| ||||||
CR C-train |
| ||||||
Other CR railways |
| ||||||
Transportation hubs |
| ||||||
Wuhan Metro stations | |
---|---|
Line 7 |
|
Lines and stations that are proposed, under planning or under construction are shown in italics. |