Misplaced Pages

Kandarpada metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Mumbai Metro's Yellow Line 2A metro station


Kandarpada
Mumbai Metro station
Train arriving at Platform 1.
General information
LocationKandarpada, Dahisar West, Mumbai, Maharashtra 400068
Coordinates19°15′25″N 72°51′02″E / 19.25692°N 72.85051°E / 19.25692; 72.85051
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s)Line 2A
Platforms2 (2 side platform)
Tracks2
Construction
Structure typeElevated, Double track
ParkingNo
History
Opened2 April 2022; 2 years ago (2022-04-02)
Services
Preceding station Logo of the Delhi Metro Mumbai Metro Following station
Anand Nagartowards Dahisar East Line 2A Mandapeshwartowards Andheri West
Route map
Legend
Line 2
0.0000 Dahisar East Line 7 and Line 9
Mahatma Gandhi Road
0.7110 Anand Nagar
Western line Left arrow Dahanu Road and Churchgate Down arrow
Dahisar River
2.4227 Kandarpada
3.3831 Mandapeshwar
4.4684 Eksar
5.5375 Borivali West
6.4659 Pahadi Eksar
7.5718 Kandivali West
8.2003 Dahanukarwadi
Poisar River
Charkop Depot
9.5355 Valnai
10.8460 Malad West
12.2434 Lower Malad
13.1831 Bangur Nagar
14.4555 Goregaon West
Oshiwara River
15.4687 Oshiwara
Adarsh Nagar Line 6
16.4330 Lower Oshiwara
17.5786 Andheri West
D N Nagar Line 1
18.6376 ESIC Nagar
20.3026 Prem Nagar
20.8292 Indira Nagar (Vile Parle)
21.9025 Nanavati Hospital / Up arrow towards Dahanu Road
23.5094 Khira Nagar and Santacruz on Western line
24.4660 Saraswat Nagar
25.5590 National College (Bandra)
26.6997 Bandra and Bandra on Western line
Left arrow towards Churchgate
Western Express Highway
28.9139 Income Tax Office (BKC) Line 3
Vakola Nala
30.1880 ILFS, BKC
30.8928 MTNL, BKC
Mithi River
32.7202 SG Barve Marg
Central line Left arrow CSMT and Kalyan Right arrow
Lokmanya Tilak Terminus Flyover Road
Harbour line Left arrow CSMT and Panvel Down arrow
34.3492 Kurla (East)
Line 4
Eastern Express Highway
35.3563 Eastern Express Highway
35.9967 Chembur
VNP and RC Marg Junction
on Mumbai Monorail
36.9590 Diamond Garden
37.8190 Shivaji Chowk (Chembur)
Eastern Freeway
38.9396 BSNL, Govandi
Up arrow towards CSMT
40.5467 Mankhurd and Mankhurd on Harbour line
Right arrow towards Panvel
41.5074 Mandala
Mandala Depot
Location

Kandarpada is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This metro station is located on CS Link Road in Dahisar, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.

History

J Kumar Infraprojects was awarded the contract to construct the station in June 2016. The MMRDA announced that electrification of the line had been completed on 26 May 2020.

Kandarpada was opened to the public on 2 April 2022, along with the first phase of Line 2A.

Station layout

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Andheri West next station is Mandapeshwar IC Colony
Platform 1
Northbound
Towards ← Dahisar East next station is Anand Nagar
Side platform | Doors will open on the left Disabled access
L2

Power and signaling system

Like all other stations and railways of Mumbai metro, Kandarpada station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References

  1. "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
  2. "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
  3. "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  4. "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  5. "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
  6. "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.
Mumbai Metro stations
Line 2
Operational
Under
Construction
Depot(s)
  • Charkop (2A) & Mandale (2B)
  • * Stations in Italics are Under Construction.
Categories: