Misplaced Pages

Valnai metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Mumbai Metro's Yellow Line 2A metro station


Valnai - Meeth Chowky
Mumbai Metro station
General information
LocationMalad, Mithchowki, Malad West, Mumbai, Maharashtra 400064
Coordinates19°11′49″N 72°50′03″E / 19.1969341°N 72.8342853°E / 19.1969341; 72.8342853
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s)Line 2A
PlatformsSide platform
Platform-1 → Dahisar East
Platform-2 → Andheri West
Tracks2
Construction
Structure typeElevated, Double track
ParkingNo
History
Opened19 January 2023; 23 months ago (2023-01-19)
Services
Preceding station Logo of the Delhi Metro Mumbai Metro Following station
Dahanukarwaditowards Dahisar East Line 2A Malad Westtowards Andheri West
Route map
Legend
Line 2
0.0000 Dahisar East Line 7 and Line 9
Mahatma Gandhi Road
0.7110 Anand Nagar
Western line Left arrow Dahanu Road and Churchgate Down arrow
Dahisar River
2.4227 Kandarpada
3.3831 Mandapeshwar
4.4684 Eksar
5.5375 Borivali West
6.4659 Pahadi Eksar
7.5718 Kandivali West
8.2003 Dahanukarwadi
Poisar River
Charkop Depot
9.5355 Valnai
10.8460 Malad West
12.2434 Lower Malad
13.1831 Bangur Nagar
14.4555 Goregaon West
Oshiwara River
15.4687 Oshiwara
Adarsh Nagar Line 6
16.4330 Lower Oshiwara
17.5786 Andheri West
D N Nagar Line 1
18.6376 ESIC Nagar
20.3026 Prem Nagar
20.8292 Indira Nagar (Vile Parle)
21.9025 Nanavati Hospital / Up arrow towards Dahanu Road
23.5094 Khira Nagar and Santacruz on Western line
24.4660 Saraswat Nagar
25.5590 National College (Bandra)
26.6997 Bandra and Bandra on Western line
Left arrow towards Churchgate
Western Express Highway
28.9139 Income Tax Office (BKC) Line 3
Vakola Nala
30.1880 ILFS, BKC
30.8928 MTNL, BKC
Mithi River
32.7202 SG Barve Marg
Central line Left arrow CSMT and Kalyan Right arrow
Lokmanya Tilak Terminus Flyover Road
Harbour line Left arrow CSMT and Panvel Down arrow
34.3492 Kurla (East)
Line 4
Eastern Express Highway
35.3563 Eastern Express Highway
35.9967 Chembur
VNP and RC Marg Junction
on Mumbai Monorail
36.9590 Diamond Garden
37.8190 Shivaji Chowk (Chembur)
Eastern Freeway
38.9396 BSNL, Govandi
Up arrow towards CSMT
40.5467 Mankhurd and Mankhurd on Harbour line
Right arrow towards Panvel
41.5074 Mandala
Mandala Depot
Location

Valnai – Meeth Chowky (formerly known as Valnai) is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. The station is located in Malad, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.

History

Valnai metro station was announced to be built in the second package of line 2A. J. Kumar Infraprojects was awarded the construction work contract for both packages of line 2A in June 2016. The cost of package was estimated at ₹700 crore each. J. Kumar Infraprojects bid below the reserve price. As per the agreement, the company started the construction of Valnai metro station along with the elevated viaducts and other stations of the second package.

The station was originally named Valnai. The MMRDA renamed the station Valnai – Meeth Chowky on 10 April 2023 due to public demand.

Station layout

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Andheri West next station is Malad West
Platform 1
Northbound
Towards ← Dahisar East next station is Dahanukarwadi
Side platform | Doors will open on the left Disabled access
L2

Power and signaling system

Like all other stations and railways of Mumbai metro, Valnai station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References

  1. "Travel guide for Mumbai Metro lines 2A and 7; PM Modi likely to launch the stretches on Jan 19". 11 January 2023. Retrieved 13 January 2023.
  2. "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.
  3. "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". www.dnaindia.com. 9 August 2016. Retrieved 14 January 2023.
  4. "Mumbai: Three Metro stations renamed on public demand". Free Press Journal. Retrieved 9 July 2023.
Mumbai Metro stations
Line 2
Operational
Under
Construction
Depot(s)
  • Charkop (2A) & Mandale (2B)
  • * Stations in Italics are Under Construction.
Categories: