Oshiwara is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Andheri West, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.
History
Trial runs on section of 2A from Dahanukarwadi to Dahisar East has started from 31 May 2021. Dahisar East commercial operations began on 3 April 2022 with First phase of line 2A.
Station layout
G | Street Level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Andheri West next station is Lower Oshiwara | |
Platform 1 Northbound |
Towards ← Dahisar East next station is Goregaon West | |
Side platform | Doors will open on the left | ||
L2 |
Power and signaling system
Like all other stations and railways of Mumbai metro, Oshiwara station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
References
- "New Parking Facility To Be Introduced Near 5 Metro Stations In Mumbai". mumbailive.com. Retrieved 15 January 2024.
- "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
- "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.
- "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
Mumbai Metro stations | |||||
---|---|---|---|---|---|
Line 2 |
| ||||
Depot(s) |
| ||||
|