Line 2 (Yellow Line) | |
---|---|
BEML Rolling stock of Mumbai Metro Line 2 | |
Overview | |
Status |
|
Owner | MMRDA |
Locale | Mumbai, Maharashtra, India |
Termini |
|
Stations | 17 |
Website | Line 2A Line 2B |
Service | |
Type | Rapid Transit |
System | Mumbai Metro |
Operator(s) | Maha Mumbai Metro Operation Corporation Limited (MMMOCL) |
Depot(s) | Charkop (2A) Mandale (2B) |
Rolling stock | BEML |
Daily ridership | 212,000 (July 2023) |
History | |
Commenced | November 2016 (2016-11) |
Opened | 2 April 2022; 2 years ago (2022-04-02) |
Technical | |
Line length | 18.589 km (11.551 mi) |
Number of tracks | 2 |
Character | Grade-separated, Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 25 Kv AC Overhead catenary |
Line 2 (Yellow Line) is a rapid transit metro line of the Mumbai Metro in the city of Mumbai, Maharashtra, India. The line connects Dahisar in the northwest with Mandale in Mankhurd via Andheri, BKC and Chembur in the east. Phase One of Line 2A was partially opened on 2 April 2022 from Dahisar East to Dahanukarwadi.
Construction on the first section of the line, called Metro 2A (between Dahisar and D.N. Road), began in November 2016, and was completed in April 2022. This section shall be 18.589 km (11.551 mi) long, and comprise 17 of the 39 stations that form part of this route. The new 9.5 km (5.9 mi) section of the Yellow Line from Dahanukarwadi to DN Nagar was inaugurated on January 19, 2023, by Prime Minister Narendra Modi.
Planning
Public private partnership with RInfra
A 38.24 km (23.76 mi) long Colaba–Bandra–Charkop line was proposed as Line 2 in the original Mumbai Metro masterplan unveiled by the MMRDA in 2004. A 13.37 km (8.31 mi) long Bandra-Kurla–Mankhurd line and a 7.5 km (4.7 mi) line from Charkop to Dahisar were proposed as Line 3 and Line 4, respectively, in the same plan. In the updated masterplan, the proposed Charkop–Bandra–Mankhurd and Charkop–Dahisar lines were merged into a single Dahisar–Bandra–Mankhurd line, which would have been 32 km (20 mi) and had 27 stations. This was planned to be the second corridor of the Mumbai Metro. Like Line 1, this corridor was also proposed to be constructed on a public private partnership (PPP) model.
Then President Pratibha Patil launched the project in August 2009. The MMRDA appointed Reliance Infrastructure (RInfra), in consortium with SNC Lavalin Inc. Canada and Reliance Communication, through an international competitive bidding process to carry out this phase of the project, and the concession agreement was signed with the RInfra-led consortium in January 2010. The project was proposed to be implemented on build–operate–transfer (BOT) basis for a concession period of 35 years with an extension clause of another 10 years. The MMRDA estimated the project would cost ₹8,250 crore (US$990 million), while Reliance Infrastructure estimated it would cost ₹ 11,000 crore. Construction was planned to begin in August 2010 and conclude by mid-2013. However, construction work had yet to begin by December 2012, leading to calls for Line 2 to be cancelled outright.
The line's construction was handicapped by the lack of available land for carsheds at Charkop and Mankhurd; Coastal Regulation Zone (CRZ) laws forbade construction on the land that had been selected by the MMRDA. The Union Ministry of Environment and Forests (MoEF) refused to give clearance for the depots. MMRDA officials plan to solve the problem by shifting the location of the proposed rake depot to Malwani near Malad. The 19 hectares (0.19 km) plot does not come under the purview of the CRZ laws and therefore will not require environmental clearances. The MMRDA has said that they have not ruled out an underground line, claiming that they had considered a combination of an elevated and underground alignment but had deemed it impossible due to the large land requirement for ramps and slip roads.
On 6 September 2012, the MMRDA sent a letter to Reliance Infrastructure asking them to start work on the metro immediately or face legal action. In response to the letter, RInfra blamed the government and MMRDA for the delayed construction work. They said that the government had failed to fulfill its contractual obligation to provide the necessary land, right of way permits and clearances. On 8 February 2013, then RInfra CEO Sumit Banerjee claimed that the project had not advanced because the MMRDA had failed to fulfill its share of the responsibilities. The state government had since been considering alternative sites for the depot, which might have led to complete change in the alignment of the line and could have required re-bidding for the project. On 9 August 2013, DNA reported that an MMRDA official had informed them that a 27-acre (11 ha) plot that was to be used as the casting yard for Line 2, was planned to be marked for use as a casting yard for Line 3. The paper called the move "a clear indication" that Line 2 "will not take off in the near future." Chief Minister Prithviraj Chavan told the media on 30 August 2013 that "it is now clear that Mumbai's Metro II project will now not happen."
On 13 November 2014, Reliance Infrastructure announced that it had terminated the agreement between the MMTPL and the Maharashtra government. RInfra stated, "Due to non-fulfilment of various critical obligations by Maharashtra government and Mumbai Metropolitan Region Development Authority (MMRDA), the project could not take off. Even after four years, despite the best efforts of the Maharashtra government, various project impediments could not be resolved." The MMRDA issued a statement confirming that the agreement was terminated with mutual consent. No party will bare any cost as a result of the termination and the state government will return a bank guarantee of ₹ 160 crore. The MMRDA also clarified that the Line 2 project had not been cancelled and will be constructed by the Mumbai Metro Railway Corp. Ltd (MMRCL) under an engineering, procurement and construction (EPC) model.
EPC model
In September 2013, the MMRDA appointed RITES to study the feasibility of constructing the proposed 32 km (20 mi) metro line underground. RITES also studied the feasibility of extending the corridor and merging the 7.5 km (4.7 mi) Charkop-Dahisar metro, proposed as a separate line, with this project. RITES submitted its final report to the MMRDA in the last week of May 2014, concluding that constructing the metro underground and extending it up to Dahisar was feasible. The merged Dahisar-Bandra-Mankhurd line would be 40.2 km (25.0 mi) long and have 37 underground stations. The estimated cost of construction of this line was ₹28,900 crore, 134% higher than the originally estimated costs of ₹7,660 crore for the Charkop-Bandra-Mankhurd line and ₹4,680 crore for the Charkop-Dahisar corridor. RITES proposed the construction of a major car depot at Oshiwara and a minor car depot at Mandale, Mankhurd on sites that were a mix of publicly and privately held land. The extension of the line to Mankhurd was proposed to resolve land acquisition issues as land was available for the construction of a depot at Mankhurd.
In June 2015, the MMRDA proposed building an 18.6 km line from Dahisar East to Andheri East, and a 12 km line from Bandra Kurla Complex to Mankhurd as part of a plan to build 6 new metro lines at a total estimated cost of ₹64,000 crore (US$7.7 billion). The MMRDA approved the detailed project report for the line in August 2015. The report estimated the cost of the project as ₹12,000 crore (US$1.4 billion). On 15 June 2015, the MMRDA announced that it would combine the two stretches and implement Line 2 of the Mumbai Metro in three parts - Dahisar East-DN Nagar (Metro 2A), DN Nagar-BKC (Metro 2B), and BKC-Mankhurd (Metro 2C). On 1 July 2015, it was announced that the MMRDA was allotted a 22-acre (8.9 ha) plot in Mankhurd adjacent to the Sion Panvel highway for the Metro carshed. The land was under dispute between the MMRDA and the State Home Ministry for the construction of a Jail.
The plan was later modified to build the line in two sections - Dahisar-DN Nagar (Metro 2A) and DN Nagar-Mankhurd (Metro 2B). Metro 2A was approved by the Maharashtra Government on 6 October 2015. In November 2015, the Department of Economic Affairs (DEA) cleared the MMRDA's request to secure a loan from the Asian Development Bank (ADB). The Maharashtra Cabinet approved the Metro 2B corridor on 27 September 2016. Half of the project cost will be funded by the Centre and the State Government, while the remaining will be financed through loans from the Asian Development Bank and New Development Bank. The Metro 2B corridor was proposed to be 23.5 km (14.6 mi) long and have 22 stations. The project was estimated to cost ₹10,986 crore, including land acquisition cost of ₹1,274 crore.
In February 2020, MMRDA metropolitan commissioner R.A. Rajeev stated that Line 2 would be identified as the Yellow Line. A study by World Resources Institute (WRI) India, published in May 2021, estimated that Metro 2A and Line 7 had the potential to create 1.1 million jobs in the city.
Elevated Metro 2B
The elevated Metro 2B line received permission from Central Railway (CR) to be built at a height of 22 metres over the Central Line to accommodate CR's plan to construct an elevated CST-Panvel high-speed rail line and an elevated CST-Kalyan line. The MMRDA objected to the height band due to concerns over difficulty involved in operating a metro line at that height as well as evacuating passengers to ground level in case of an emergency. The Central Railway later granted the MMRDA permission to build Metro 2B at a height of 13 metres, with the CST-Panvel elevated line proposed to take a height of 22 metres.
The plan to build Metro 2B as an elevated corridor faced opposition. Residents of SV Road gathered at the Sacred Heart Boys’ School in Khar to protest the Metro 2B project on 12 August 2017. Petitions against the project were also filed in the Bombay High Court by the Juhu Vile Parle Development Cooperative Housing Association, the Gulmohar area society welfare group, and the Balabhai Nanavati Hospital. Some Mumbai residents protested the project on 5 October 2017 at Santacruz and Mahim. Several celebrities including Javed Akthar participated in the protest. Metro 2B also faced legal issues concerning the section between Indira Nagar and Nanavati Hospital that passes through a funnel area of the Juhu Aerodrome.
In June 2018, the MMRDA filed an affidavit in the Bombay High Court stating that it had "taken into consideration all the aspects of the project, including the pros and cons of underground and elevated Metro, and have taken a conscious decision to go for elevated Metro". The agency stated that there was insufficient land available to build the metro partly underground as large quantities of land were required to build the ramps going underground and coming back overground. The agency also noted that an underground metro would take 2 years to build and would cost over 5.5 times more per kilometer than an elevated line. The MMRDA stated that the design of the metro was a "highly technical issue" and that the petitioners did not have the required scientific experience to evaluate it. In August 2019, the Court directed the petitioners to explain why they thought the MMRDA had selected an elevated line instead of an underground line, after the petitioner's advocate stated that he "had not come prepared" and did not know if there was a scientific reason behind the MMRDA's decision. The Bombay High Court ruled in favour of the MMRDA and dismissed all petitions against the Metro 2B project.
Cancelled stations
Two metro stations (MMRDA station and Kurla Terminus) that were originally proposed for Metro 2B were cancelled. The MMRDA Station was cancelled because it overlapped with the Kalanagar flyover ramp. The Kurla Terminus station was cancelled in September 2020 because it was in the path of the restricted funnel zone for Mumbai Airport. Further, the proposed SG Barve Marg station was only 474 metres away from the proposed Kurla Terminus. Another issue was that the Kurla Terminus station would have been located in between the Santa Cruz–Chembur Link Road (SCLR) rail overbridge and another permanent structure.
Depot and Line 7 link
See also: Line 7 (Mumbai Metro)Line 7 of the Mumbai Metro connects Dahisar East with Andheri East, and the depot for the line was proposed to be located at Dahisar. However, land acquisition for the Dahisar depot was delayed by litigation filed in 2016. In 2020, the MMRDA proposed using the depot at Charkop to serve both Line 2A and Line 7 by building a ring metro line to connect the two corridors. The MMRDA utilized an empty plot of land located after Ovaripada station on Line 7 to build pillars for the link connecting the two lines. In November 2021, the MMRDA cancelled the plan to build the depot at Dahisar and instead proposed building the depot for Lines 7, 7A and 9 at Rai Murdhe in Bhayandar.
Line 2A and Line 7 were both commissioned on 2 April 2022, with services operating between Dahanukarwadi and Aarey via Dahisar East. Both lines were extended on 19 January 2023, providing circular service between Andheri West and Gundavali via Dahisar East. The Charkop depot currently serves as the depot for Line 2A and Line 7. The Mandale depot will be used to serve Lines 2A and 2B once completed.
Construction
Line 2 will be built in two sections - Dahisar-DN Nagar (Metro 2A) and DN Nagar-Mankhurd (Metro 2B). The MMRDA signed an agreement with the DMRC, appointing the latter as the implementing agency for the project on 12 December 2015. The DMRC was paid ₹334 crore (US$40 million) for its services. The DMRC will have sole responsibility for civil and technical works and operations and maintenance on the Metro 2A corridor. For the Metro 2B corridor, the MMRDA will carry out civil works, while the DMRC is tasked with technical work and operations and maintenance. In July 2018, the state government granted special planning authority status to the MMRDA in a bid to speed up implementation of metro projects.
History | |||||
---|---|---|---|---|---|
Section | Extension date | Termini | Length | Stations | |
Metro 2A | 2 April 2022 | Dahisar East | Dahanukarwadi | 9.8 kilometers (6.1 mi) | 9 |
19 January 2023 | Dahanukarwadi | Andheri West | 8.8 kilometers (5.5 mi) | 8 | |
Metro 2B | 2024 | ESIC Nagar | Mandale | 23.643 kilometers (14.691 mi) | 20 |
42.232 kilometers (26.242 mi) | 37 |
Metro 2A
Metro 2A is 18.589 km (11.551 mi) long and connects Dahisar East to DN Nagar with 17 stations. Prime Minister Narendra Modi laid the foundation station for Metro 2A on 11 October 2015. The DMRC floated two tenders for the designing and construction of the corridor. The first package included the design and construction of a viaduct and 9 stations from Dahisar East to Dahanukarwadi, and the second package included the remaining viaduct and 8 stations from Valnai to Andheri West. J Kumar Infra Projects Limited was awarded both packages in June 2016, and carried out civil work, including viaducts and stations. The cost of the contract was ₹1,300 crore (US$160 million), with J Kumar Infra bidding below the reserve price.
Soil testing work along the corridor commenced in July 2016. Construction on the corridor began in November 2016. The corridor was scheduled to be commissioned in October 2019, but delays in procuring rolling stock and issues with civil works pushed the deadline to December 2020. The opening of the line was further delayed by the COVID-19 pandemic. As of 13 September 2017, 77% of the soil investigation work for pier foundation, 76% of barricading work, 37% piles, and 19% pile caps were completed, and 110 piers were cast, 75 pier caps erected, 26 U girders erected and work pile foundation work commenced for all 17 stations. In April 2019, the MMRDA issued tenders for the rooftop solar PV power projects at stations on Metro 2A. Track laying work on the line began in June 2019.
The stations on the line have a platform length of 185 metres to serve 8 car rakes. Stations were built on a single pier, unlike the three piers used to support stations on Line 1. The single pier design was chosen due to lack of space available for construction on New Link Road. Unlike most metros in India, the stations were not completely constructed on site. Construction utilized "pi-girders" which were pre-cast at a casting yard in Bandra. The girders were then erected onto the station for platforms. Most of the spans on the line have a length of 25–28 metres. A 51 metre long steel girder was installed on New Link Road in Kandivali to accommodate a 700 metre radius curve along the line.
MMRDA metropolitan commissioner R.A. Rajeev stated in September 2020 that almost 80% of construction work had been completed. The MMRDA began conducting pre-trials on the rolling stock at the Charkop depot in February 2021. The MMRDA announced that electrification of the line had been completed on 26 May, and the first trial runs were conducted from 31 May. The MMRDA began a dynamic test and trial run on the 20 km stretch between Dhanukarwadi and Aarey (including a portion of Line 7) on 19 June. The final I-girder on Line 2A was launched at Adarsh Nagar Junction in Andheri on 6 October 2021. The stretch between Dhanukarwadi and Aarey received provisional approval from the Research Designs and Standards Organisation (RDSO) in January 2022. The Commissioner of Metro Rail Safety (CMRS) began inspecting the line in February 2022.
A section of Metro 2A from Dhanukarwadi to Dahisar East (along with the section of Line 7 from Dahisar East to Aarey) was opened on 2 April 2022. Chief Minister Uddhav Thackeray flagged off the first train at 4pm in the presence of Deputy Chief Minister Ajit Pawar, Urban Development Minister Eknath Shinde, NCP chief Sharad Pawar and the Leader of Opposition in the Legislative Council, Pravin Darekar. The line opened for public service from 8pm, with services operating between Dahanukarwadi and Aarey (on Line 7) via Dahisar East.
The remaining section of Metro 2A from Dhanukarwadi to DN Nagar received approval from the RDSO in October 2022. The CMRS began inspecting the line in December 2022. The final section of the line (along with the final section of Line 7 from Goregaon East to Gundavali) was inaugurated on 19 January 2023 by Prime Minister Narendra Modi.
Metro 2B
Metro 2B is 23.643 km (14.691 mi) long and connects DN Nagar to Mankhurd with 20 stations. The foundation stone for Metro 2B was laid by Prime Minister Narendra Modi on 24 December 2016. The MMRDA utilized a drone to carry out survey work for Metro 2B. The drones were fitted with a 360-degree camera that provides up to 3 millimeter accuracy. The aerial survey takes less time than a regular survey, achieves greater accuracy and helps protect against false claims for compensation. The MMRDA invited bids for civil work on Metro 2B on 4 January 2017. Metro 2B was divided into four packages - ESIC Nagar to Khira Nagar, Saraswat Nagar to ILFS, MTNL Metro to Chembur, and Diamond Garden to Mandale. Metro 2B was tendered alongside Metro 4. L&T, Afcons Infrastructure, Tata, NCC and JMC, Reliance Infrastructure-RdE, JKumar Group, ITD Cementation, CHEC-TPL bid for packages on both Metro 2B and Metro 4. Simplex Infrastructure and a consortium of GHEC-RCC-JV-China placed bids only for some packages of Metro 2B. A total of 10 firms and/or consortia submitted bids for the two lines. The MMRDA shortlisted 8 bidders for the contract to build the Mandale depot in November 2017.
Simplex Infrastructure was awarded a ₹1,080 crore (US$130 million) to build the first package of Metro 2B by the MMRDA on 13 November 2017. This included the design and construction of a 12 km long viaduct and 11 elevated stations including ESIC Nagar, Prem Nagar, Indira Nagar, Old Airport, Khira Nagar, Saraswat Nagar, National College, Bandra (W), MMRDA Office, Income Tax Office and BKC. A joint venture between RCC Infra Ventures and MBZ-Ukraine was awarded a ₹521 crore (US$62 million) contract for the second package on 3 March 2018. This included the design and construction of a 5.9 km long elevated viaduct, the Mandale car depot, and 6 metro stations including MTNL Metro, SG Barve Marg, Kurla Terminus, Kurla East, and Chembur. Construction began in April 2018. In March 2019, the MMRDA altered the alignment of the proposed route at BKC Road to avoid it passing in front of Shiv Sena president Uddhav Thackeray's residence.
On 4 February 2020, the MMRDA terminated the contract awarded to Simplex Infrastructure and the RCC-MBZ joint venture over delay in completing the work. Simplex had completed 5% of the total work in 30 months, while it was scheduled to have completed 65%. RCC-MBZ had only completed 4.46% of total work. The MMRDA awarded a ₹1,307.88 crore (US$160 million) to J Kumar Infraprojects to complete work on the first package in June 2021, and a ₹760 crore (US$91 million) contract to Nagarjuna Construction Company to complete work on the second package of Metro 2B in March 2022. Construction resumed in March 2023. The MMRDA stated that 70% of work on the Mandale depot had been completed by the end of May 2023.
Current status
Metro 2B
Sr. No. | Name of Work | Description | Status as of | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
21 May 2019 | 22 November 2019 | 4 August 2020 | 15 September 2020 | 5 October 2020 | 4 January 2021 | 2 August 2021 | 27 January 2022 | 5 September 2022 | 25 September 2023 | |||
1 | Soil Investigation Works | Soil investigation work for pier foundation completed | 55% | 59.08% | 68.60% | 70.60% | 72.86% | 74.29% | 82.86% | 90.57% | 100.00% | |
2 | Utility Works | Work completed | 23% | 28.86% | 40.22% | 45.07% | 45.25% | 46.46% | 57.21% | 65.21% | 94.31% | |
3 | Piling Works | Piling work for foundations completed | 7% | 8.84% | 23.15% | 25.10% | 26.62% | 28.20% | 33.95% | 38.08% | 49.46% | 80.88% |
4 | Pile Cap Works | Pile Cap work completed | 3% | 4.08% | 12.1% | 12.4% | 12.93% | 16.15% | 20.67% | 30.96% | 37.28% | 79.18% |
5 | Pier Works | Piers Cast | 1.2% | 1.45% | 5.95% | 6.73% | 6.94% | 14.25% | 23.46% | 33.31% | 63.48% | |
6 | Pier Cap Works | Casting | Casting beds are under preparation. | 3.12% | 3.92% | 5.52% | 6.60% | 12.91% | 24.36% | 68.09% | ||
Erection | 1.88% | 2.33% | 2.39% | 5.14% | 10.85% | 21.27% | 59.47% | |||||
7 | U Girder Works | Casting | 0.7% | 0.8% | 6.22% | 7.84% | 7.91% | 10.79% | 11.96% | 34.48% | 58.08% | |
Erection | Casting yard works are in progress | 1.40% | 1.64% | 1.98% | 3.93% | 7.7% | 20.69% | 40.00% | ||||
8 | Station Work | Work is in progress at out of 22 stations | Yet to start | Soil Investigation and Utility Identification work is in progress. Foundation work yet to start | Foundation (Pile and Pile Cap) work is in progress at 5 no's of stations. Substructure work yet to start. | Foundation (Pile and Pile Cap) work is in progress at 5 no's of stations. | ||||||
9 | Mandale Depot works | Work completed | 7.00% | 11.15% | 21.22% | 40.06% | 80.72% |
Stations
There will be a total of 37 stations on Line 2. Metro 2A, from Dahisar to Andheri West, has 17 stations. Metro 2B, from DN Nagar to Mankhurd, will have 20 stations. The MMRDA partnered with bike-sharing app MBYK to provide a bicycle-sharing service at stations on the line.
Yellow Line 2 | |||||||||
---|---|---|---|---|---|---|---|---|---|
# | Station Name | Opening | Connections | Alignment | |||||
English | Marathi | ||||||||
Line 2A | |||||||||
1 | Dahisar East | दहिसर पूर्व | 2 April 2022 | Line 7 and Line 9 (Under Construction) |
Elevated | ||||
2 | Anand Nagar | आनंद नगर | 2 April 2022 | None | Elevated | ||||
3 | Kandarpada | कांदरपाडा | 2 April 2022 | None | Elevated | ||||
4 | Mandapeshwar | मंडपेश्वर | 2 April 2022 | None | Elevated | ||||
5 | Eksar | एकसर | 2 April 2022 | None | Elevated | ||||
6 | Borivali West | बोरीवली पश्चिम | 2 April 2022 | None | Elevated | ||||
7 | Shimpoli | शिंपोली | 2 April 2022 | None | Elevated | ||||
8 | Kandivli West | कांदिवली पश्चिम | 2 April 2022 | None | Elevated | ||||
9 | Dahanukarwadi | डहाणूकरवाडी | 2 April 2022 | None | Elevated | ||||
10 | Valnai–Meeth Chowky | वळनई-मीठ चौकी | 19 January 2023 | None | Elevated | ||||
11 | Malad West | मालाड पश्चिम | 19 January 2023 | None | Elevated | ||||
12 | Lower Malad | लोअर मालाड | 19 January 2023 | None | Elevated | ||||
13 | Bangur Nagar | बांगूर नगर | 19 January 2023 | None | Elevated | ||||
14 | Goregaon West | गोरेगाव पश्चिम | 19 January 2023 | None | Elevated | ||||
15 | Oshiwara | ओशिवरा | 19 January 2023 | None | Elevated | ||||
16 | Lower Oshiwara | लोअर ओशिवरा | 19 January 2023 | Line 6 (Under Construction) | Elevated | ||||
17 | Andheri West | अंधेरी पश्चिम | 19 January 2023 | Line 1 | Elevated | ||||
Line 2B | |||||||||
18 | ESIC Nagar | का.रा.वि.म. नगर | Under Construction | None | Elevated | ||||
19 | Prem Nagar | प्रेम नगर | Under Construction | None | Elevated | ||||
20 | Indira Nagar (Vile Parle) | इंदिरा नगर (विलेपार्ले) | Under Construction | None | Elevated | ||||
21 | Nanavati Hospital | नानावटी रुग्णालय | Under Construction | None | Elevated | ||||
22 | Khira Nagar | खीरा नगर | Under Construction | Santacruz on Western line | Elevated | ||||
23 | Saraswat Nagar | सारस्वत नगर | Under Construction | None | Elevated | ||||
24 | National College (Bandra) | राष्ट्रीय महाविद्यालय (वांद्रे) | Under Construction | None | Elevated | ||||
25 | Bandra | वांद्रे | Under Construction | Bandra on Western line | Elevated | ||||
26 | Income Tax Office (BKC) | आयकर कार्यालय (बीकेसी) | Under Construction | Line 3 (Under Construction) | Elevated | ||||
27 | ILFS, BKC | आयएलएफएस, बीकेसी | Under Construction | None | Elevated | ||||
28 | MTNL, BKC | एमटीएनएल, बीकेसी | Under Construction | None | Elevated | ||||
29 | SG Barve Marg | एसजी बर्वे मार्ग | Under Construction | None | Elevated | ||||
30 | Kurla (East) | कुर्ला (पूर्व) | Under Construction | None | Elevated | ||||
31 | Eastern Express Highway | पूर्व द्रुतगती महामार्ग | Under Construction | Line 4 (Under Construction) | Elevated | ||||
32 | Chembur | चेंबूर | Under Construction | Chembur on Monorail | Elevated | ||||
33 | Diamond Garden | डायमंड गार्डन | Under Construction | None | Elevated | ||||
34 | Shivaji Chowk (Chembur) | शिवाजी चौक (चेंबूर) | Under Construction | None | Elevated | ||||
35 | BSNL, Govandi | बीएसएनएल, गोवंडी | Under Construction | None | Elevated | ||||
36 | Mankhurd | मानखुर्द | Under Construction | None | Elevated | ||||
37 | Mandale | मंडाले | Under Construction | None | Elevated |
Cost
Metro 2A was built at a cost of ₹6,410 crore (US$770 million). The line was originally scheduled to open in October 2019, but was delayed, and completed in January 2023. The MMRDA stated that the delay escalated the project cost by about 7%. The State Government bore 48% of the total project cost. The MMRDA secured a loan worth 52% of the total project cost from the Asian Development Bank (ADB). The MMRDA allotted ₹340 crore (US$41 million) to the DMRC to implement and commission rolling stock, signalling and telecommunication work for the Metro 2A and Line 7 corridors on 26 November 2016.
Metro 2B is estimated to cost ₹10,986 crore, including land acquisition cost of ₹1,274 crore. Half of the project cost will be funded by the Centre and the State Government, while the remaining will be financed through loans from the Asian Development Bank and the World Bank.
On 2 March 2019, the Union Ministry of Finance stated that it signed a $926 million loan agreement with the ADB to fund construction of Lines 2 and 7. This was the single largest infrastructure loan ever extended by the ADB. The funds will be used to procure 63 six-car trainsets and for signalling and safety systems on both corridors.
Infrastructure
Rolling stock
BEML was awarded a ₹3,015 crore (US$360 million) contract to supply 378 metro cars (63 trainsets) for Line 2 and Line 7 in November 2018. Seven international manufacturers of rolling stock, such as Alstom, Bombardier (later acquired by Alstom for the transportation division in 2021), CAF, CRRC, Titagarh, BEML, and Hyundai Rotem, participated in the bid. An additional 126 metro cars (21 trainsets) were ordered from BEML to cater to metro extensions. All trainsets were manufactured at BEML's Rail Coach Factory in Bangalore, Karnataka. The rakes are capable of driverless operation making them the first driverless metro trains to be made in India. BEML began manufacturing the coaches on 29 July 2019, built the first metro coach in 75 days and unveiled it in September 2019. The first trainset arrived in Mumbai on 28 January 2021.
Each trainset is made up of 6 coaches with a total passenger capacity of 1,660 and dense crush load capacity of 2,092. The trainset is 3.2 metres wide, made of stainless steel and each coach has 4 doors on each side. The rake employs a regenerative braking system.
Depot
The Charkop depot currently serves as the depot for Line 2A and Line 7. The Charkop depot is located on a 16.40 hectare site, and has 20 stabling lines. The Charkop depot had 305 employees of which 30% were women (as of October 2022).
The depot for Line 2 is proposed to be located on a 28 hectare site at Mandale, and is the largest metro depot in Mumbai. It has a double decker structure with 76 stabling lines. It is currently under construction and will serve Line 2A and 2B once completed.
Signalling
Line 2 utilises the Alstom Urbalis 400 communications-based train control (CBTC) signalling system. Alstom was awarded a EUR90 million contract to supply the signalling and telecommunications systems for Mumbai Metro Line 2 and Line 7, as well as Pune Metro Line 1 and Line 7.
Power
Line 2 is electrified at 25 kV 50 Hz AC, with power provided via an overhead catenary. The MMRDA signed an agreement with Adani Electricity Mumbai Limited to supply electricity to Metro 2A and Metro 7 on 2 December 2022. Around 120 million units is required to power both lines.
Fare collection
A consortium of Indian company Datamatics and Italian company AEP Ticketing solutions S.R.L was awarded a ₹160 crore (US$19 million) contract to implement the automated fare collection system for Line 2 and Line 7 in February 2019.
References
- Mishra, Lalatendu (21 July 2016). "MMRC gears up to start work on Metro-3". The Hindu.
- "Two Mumbai Metro lines report record single-day ridership of 2.14 lakh amid heavy rain". cnbctv18.com. 20 July 2023. Retrieved 30 September 2023.
- "Mumbai Metro Red and Yellow Line and Navi Mumbai Metro will be Inagurate on 19th Jan|TGT SPECIALS". YouTube.
- "Mmrda – Projects – Mumbai Metro Rail Project". Mmrdamumbai.org. Archived from the original on 19 March 2012. Retrieved 12 March 2014.
- "Road infrastructure must be planned with priority for pedestrians, non-motorised vehicle traffic - Moneylife". Moneylife.in. Archived from the original on 23 September 2013. Retrieved 28 September 2013.
- "Third phase of metro rail inaugurated". 26 August 2014.
- "MMRDA in talks for foreign funding". The Indian Express. Archived from the original on 19 October 2016. Retrieved 14 October 2016.
- ^ "Reliance Infra wins Rs 11,000-cr Mumbai Metro-II project - Economic Times". The Times of India. Archived from the original on 14 June 2014. Retrieved 3 April 2014.
- ^ "Another R-Infra project heads for termination" Archived 19 December 2012 at the Wayback Machine. Business Standard. 18 December 2012. Retrieved 21 December 2012.
- "Reliance Infra's Mumbai metro phase II faces cancellation" Archived 27 January 2013 at the Wayback Machine. Business Standard. 17 December 2012. Retrieved 21 December 2012.
- Jadhav, Ranjeet (9 January 2012). "MMTPL to CM: Metro II will take more time, money". Mumbai: Mid-Day. Archived from the original on 31 July 2012. Retrieved 13 March 2012.
- Siddhaye, Ninad (5 December 2009). "CRZ rules may stop Metro II in its tracks". Mumbai: DNA. Archived from the original on 25 December 2009. Retrieved 13 March 2012.
- "MMRDA finds land for Metro II rake depot in Malwani" Archived 25 September 2012 at the Wayback Machine. Mumbai Mirror. 22 September 2012. Retrieved 26 September 2012.
- "Metro-II may still run underground in Mumbai". Daily News and Analysis. 15 March 2012. Archived from the original on 24 March 2012. Retrieved 28 March 2012.
- "Metro II delay: Mumbai Metropolitan Region Development Authority warns of action". The Times of India. 15 September 2012. Retrieved 26 September 2012.
- "MMRDA warns RInfra over delay in second Metro line". Hindustan Times. 15 September 2012. Retrieved 26 September 2012.
- "Metro’s second line project may get derailed". The Times of India. 17 September 2012. Retrieved 26 September 2012.
- "Mumbai Metropolitan Region Development Authority, Reliance Infrastructure on clash course over second Metro rail". The Times of India. 4 October 2012.
- "‘No work unless state follows contract’". The Indian Express. 4 October 2012.
- "Developer sticks to his guns, won’t start work on Metro-II". Hindustan Times. 4 October 2012. Retrieved 7 July 2013.
- "Rs 65cr spent on Metro II, work still to take off". The Times of India. 9 February 2013. Archived from the original on 28 September 2013. Retrieved 12 February 2013.
- "Metro 2 stuck in RInfra-MMRDA blame game". DNA India. 9 February 2013. Archived from the original on 1 March 2013. Retrieved 12 February 2013.
- "Mumbai Metro Corp calls for consultants for third line". Business Standard. Press Trust of India. 19 June 2013. Archived from the original on 28 September 2013. Retrieved 7 July 2013.
- "Mumbai's second Metro line on the verge of derailment - Mumbai - DNA". Daily News and Analysis. Archived from the original on 27 September 2013. Retrieved 28 September 2013.
- Rohit Chandavarkar (31 August 2013). "Mumbai's Metro II project cancelled; Metro I and other Infra projects in deep trouble - Economic Times". The Economic Times. Archived from the original on 10 April 2021. Retrieved 28 September 2013.
- "Tenders for Metro-II to be reinvited soon". The Times of India. Archived from the original on 17 January 2014. Retrieved 25 January 2014.
- Sanjai, P.R. (13 November 2014). "Reliance Infra pulls out of Mumbai Metro Line 2". Livemint. Archived from the original on 29 October 2016. Retrieved 14 October 2016.
- "Further delay in Colaba-Seepz metro as govt tweaks bid norms". Business Standard India. Press Trust of India. 4 February 2014. Archived from the original on 1 July 2016. Retrieved 14 October 2016.
- "Underground Metro technically feasible: Study". The Indian Express. 6 March 2014. Archived from the original on 31 May 2016. Retrieved 3 April 2014.
- "Metro-II gets nod for underground line". 11 May 2014. Archived from the original on 18 October 2016. Retrieved 14 October 2016.
- "MMRDA in talks for foreign funding". 20 May 2014. Archived from the original on 19 October 2016. Retrieved 14 October 2016.
- "Dahisar-Bandra-Mankhurd corridor set to be costliest Metro project". 5 June 2014. Archived from the original on 31 December 2016. Retrieved 14 October 2016.
- ^ "Construction of two metro lines to begin mid-monsoon". Hindustan Times. 23 July 2016. Archived from the original on 20 September 2016. Retrieved 14 October 2016.
- "Over 130 km of Metro lines to criss-cross city by 2020". 16 June 2015. Archived from the original on 29 July 2016. Retrieved 14 October 2016.
- "MMRDA sanctions Rs 35,400 cr for 118 km Mumbai metro network Andheri East and Dahisar East". Business Standard. Retrieved 9 July 2023.
- "Metro 2 to be built in three phases, 2 other routes also on cards". 16 June 2015. Archived from the original on 16 June 2015.
- "Centre paves way for Rs 8,000-cr loan for 2 metro lines". Hindustan Times. 26 November 2015. Archived from the original on 18 October 2016. Retrieved 14 October 2016.
- Naik, Yogesh (1 July 2015). "MMRDA gets 22-acre plot in Mankhurd for Metro II yard". Mumbai Mirror. Mumbai. Archived from the original on 1 July 2015. Retrieved 1 July 2015.
- "Maharashtra govt approves 2 new Metro lines for Mumbai, cost revised to Rs 12,618 crore". The Indian Express. 7 October 2015. Archived from the original on 26 December 2016. Retrieved 12 February 2017.
- ^ "Centre paves way for Rs 8,000-cr loan for 2 metro lines". Hindustan Times. 26 November 2015. Archived from the original on 18 October 2016. Retrieved 12 February 2017.
- ^ "Maharashtra Cabinet Gives Go-Ahead For Two Metro Lines". NDTV.com. Archived from the original on 18 October 2016. Retrieved 14 October 2016.
- ^ "Mumbai to get two more Metro Rails". Business Standard India. 27 September 2016. Archived from the original on 18 October 2016. Retrieved 14 October 2016.
- "Metro-2A will be Yellow line, 7 to be Red". Hindustan Times. 29 February 2020. Retrieved 9 July 2023.
- "Metro lines 2A, 7 have potential to create 1.1 million jobs: Study". Hindustan Times. 24 March 2021. Retrieved 9 July 2023.
- ^ "MMRDA invites bids for 2 metro projects". dna. 5 January 2017. Archived from the original on 8 January 2017. Retrieved 10 February 2017.
- "Mumbai Metro 2B: S V Road residents protest elevated Metro, demand underground line". The Indian Express. 12 August 2017. Retrieved 9 July 2023.
- ^ "Decided to go for elevated Metro after considering all pros & cons: MMRDA to Bombay HC". Financialexpress. 23 June 2018. Retrieved 9 July 2023.
- "Human chain against Metro 2B on Oct. 5". The Hindu. 17 September 2018. ISSN 0971-751X. Retrieved 9 July 2023.
- "Protest against elevated Metro 2B: 10,000 residents to form human chain in Santacruz on October 5". The Indian Express. 18 September 2018. Retrieved 9 July 2023.
- Sinha, Ankita (5 October 2018). "Javed Akhtar Joins Protest in Mumbai, Demands Underground Metro". TheQuint. Retrieved 9 July 2023.
- "Mumbai Metro: Construction work on Metro Line 2B resumes; pillars to be up by 2024, says MMRDA". TimesNow. 6 March 2023. Retrieved 9 July 2023.
- "PIL in high court objects to Mumbai Metro 2B overground line near Juhu airport". Hindustan Times. 21 September 2021. Retrieved 9 July 2023.
- "MMRDA rules out underground Metro-2B corridor". The Asian Age. 24 June 2018. Retrieved 9 July 2023.
- "'Do you know why Metro 2B went from underground to elevated?'". Hindustan Times. 27 August 2019. Retrieved 9 July 2023.
- "Legal hurdles cleared, MMRDA gets green signal for Mumbai Metro lines 2B & 4". The Indian Express. 13 April 2023. Retrieved 9 July 2023.
- "Petitions against metro lines disposed of by HC". Hindustan Times. 13 April 2023. Retrieved 9 July 2023.
- "Bombay High Court clears way for construction of overground Metro 2B corridor". The Indian Express. 23 December 2022. Retrieved 9 July 2023.
- "No Kurla terminus on Mumbai Metro-2B line: MMRDA". Hindustan Times. 16 September 2020. Retrieved 9 July 2023.
- "Mumbai: Metro scraps plan for Kurla Terminus, MMRDA stations". The Times of India. 17 September 2020. ISSN 0971-8257. Retrieved 9 July 2023.
- "Charkop Car Depot To Now House Metro 7 and 2-A". Mumbai Live. 10 February 2020. Retrieved 9 July 2023.
- Rao, Shashank. "Obstacles in getting car shed at Dahisar gives birth to a semi-circular metro line". Mumbai Mirror. Retrieved 9 July 2023.
- "Work on Mumbai Metro lines 2A, 7 delayed, likely to start operation by Jan 2022". The Indian Express. 4 September 2020. Retrieved 9 July 2023.
- "Mumbai: MMRDA changes location of 2 Metro depots". The Indian Express. 18 November 2021. Retrieved 10 July 2023.
- "PM Narendra Modi to inaugurate Mumbai Metro Lines 2A, 7 today: All you need to know". The Indian Express. 14 January 2023. Retrieved 9 July 2023.
- ^ "Metro Line 2A to use Charkop depot till work on Line 2B & Mandale depot is completed". The Indian Express. 28 December 2022. Retrieved 9 July 2023.
- "MMRDA signs deal with Delhi Rail Corporation for metro line 2, 7". The Asian Age. 12 December 2015. Retrieved 9 July 2023.
- "Dahisar to DN Nagar metro line: Maharashtra to pay Rs 334 crore for DMRC's services". The Indian Express. 23 December 2015. Retrieved 9 July 2023.
- "Mumbai Metro to get by with help from Delhi". Hindustan Times. 10 May 2016. Archived from the original on 18 October 2016. Retrieved 14 October 2016.
- "MMRDA gets special tag to speed up 5 Mumbai Metro lines". Hindustan Times. 7 July 2018. Retrieved 9 July 2023.
- ^ "Mumbai Metropolitan Region Development Authority - Metro Line - 2". mmrda.maharashtra.gov.in. Archived from the original on 5 October 2017. Retrieved 24 December 2017.
- "Metro Line 2B - Project Features". mmrda.maharashtra.gov.in. Retrieved 9 July 2023.
- "Mumbai: Metro 2B to be partially opened in early 2024". Free Press Journal. Retrieved 9 July 2023.
- "Mumbai: Metro Lines 2A & 7 likely to be fully opened on August 15". The Times of India. 4 April 2022. ISSN 0971-8257. Retrieved 9 July 2023.
- "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
- Linah Baliga (8 July 2018). "Corrupt? Work shoddily? You're hired: Metro boss". Mumbai Mirror. Retrieved 9 July 2023.
- "Soil testing starts for metro projects". Asian Age/. 2 July 2016. Archived from the original on 12 February 2017. Retrieved 12 February 2017.
- ^ "Nearly 50% of pillars ready, Metro 2A to start in 2020 - Times of India". The Times of India. 8 May 2018. Archived from the original on 11 May 2018. Retrieved 20 May 2018.
- ^ "MMRDA says Metro 2A & 7 cost escalation to be Rs 900 crore". The Times of India. 22 January 2023. ISSN 0971-8257. Retrieved 9 July 2023.
- "MMRDA Issues 7.63 MW Rooftop Solar Tender For Mumbai Metro Project". saurenergy.com. Archived from the original on 4 May 2019. Retrieved 4 May 2019.
- "Work on track: MMRDA starts laying rail lines for Metro 2A, 7". Hindustan Times. 18 June 2019. Retrieved 9 July 2023.
- "Metro 2A corridor: MMRDA to use precast 'pi-girders' to expedite construction work". The Indian Express. 19 February 2018. Retrieved 9 July 2023.
- "Mumbai Metro line 2A: Steel girder 51-mts long launched over pillars". Mid-day. 31 October 2020. Retrieved 9 July 2023.
- "Mumbai Metro 2A, 7 trials to start from Jan 14". The Indian Express. 11 September 2020. Retrieved 9 July 2023.
- "MMRDA begins pre-trials for Mumbai's Metro trains". Hindustan Times. 25 February 2021. Retrieved 9 July 2023.
- "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
- "Mumbai: Trial run for Metro Line 2A and 7 flagged off". The Indian Express. 1 June 2021. Retrieved 10 July 2023.
- "Mumbai: Dynamic trial run begins on Metro corridors 2A and 7". The Indian Express. 20 June 2021. Retrieved 9 July 2023.
- "Final I-girder of Mumbai Metro Line 2A launched". The Indian Express. 6 October 2021. Retrieved 9 July 2023.
- "Mumbai: Metro corridors 2A, 7 get RDSO provisional certificate". The Indian Express. 29 January 2022. Retrieved 9 July 2023.
- "Mumbai: CMRS starts inspection of Phase 1 of Metro corridors 2A and 7". The Indian Express. 20 February 2022. Retrieved 9 July 2023.
- "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
- "Mumbai's Metro Line 2A, 7 clear designs & standards testing". The Indian Express. 13 October 2022. Retrieved 9 July 2023.
- "Supervision of Mumbai Metro Lines 2A and 7 by Commission of Metro Rail Safety underway". The Indian Express. 30 November 2022. Retrieved 9 July 2023.
- "PM Narendra Modi inaugurates Mumbai Metro lines 2A and 7; what you need to know about the new routes". The Economic Times. 19 January 2023. ISSN 0013-0389. Retrieved 9 July 2023.
- Livemint (18 January 2023). "PM Modi to inaugurate Mumbai Metro Rail Lines 2A and 7 on 19 January. 10 points". mint. Retrieved 9 July 2023.
- "MMRDA invites civil work bids for two Metro projects". The Times of India. 5 January 2017. Archived from the original on 12 February 2017. Retrieved 10 February 2017.
- "MMRDA plans drone survey for other Metro lines". The Indian Express. 7 March 2017. Archived from the original on 7 March 2017. Retrieved 7 March 2017.
- "MMRDA invites tenders for design, construction of stations, viaducts for new Metro routes". The Indian Express. 5 January 2017. Archived from the original on 11 February 2017. Retrieved 10 February 2017.
- "Racing against 2021 deadline, Maharashtra opens bids for two more Metro lines". Hindustan Times. 5 January 2017. Archived from the original on 11 February 2017. Retrieved 10 February 2017.
- "Mumbai commute to get faster, firms queue up to build two more Metro lines". Hindustan Times. 13 May 2017. Archived from the original on 14 May 2017. Retrieved 13 May 2017.
- "MMRDA receives interest from domestic, foreign firms for metro". India Today. Archived from the original on 14 June 2017. Retrieved 13 May 2017.
- "R Infra, 10 others bid for Metro-2B, Metro-4 corridors". Asian Age. 13 May 2017. Archived from the original on 24 May 2017. Retrieved 13 May 2017.
- "Metro 2B: Eight firms shortlisted for car depot". The Indian Express. 29 November 2017. Retrieved 9 July 2023.
- Prasad, Rachita (13 November 2017). "Simplex Infra bags Rs 1,080 crore Mumbai metro job". The Economic Times. ISSN 0013-0389. Retrieved 9 July 2023.
- "Simplex Infra to design, build first part of Metro 2B". The Indian Express. 14 November 2017. Retrieved 9 July 2023.
- "MMRDA appoints contractors for Mumbai's Wadala-Thane-Kasarvadavali Metro-4 corridor". Hindustan Times. 4 March 2018. Retrieved 9 July 2023.
- "Mumbai: Metro 2B work in sensitive aerodrome area begins after court's clearance". Free Press Journal. Retrieved 9 July 2023.
- "Mumbai Metro line 2B in BKC to shift for Thackerays' safety". Mid-day. 12 March 2019. Retrieved 9 July 2023.
- "Mumbai: 2 companies sacked for Metro project delay; it's second time for Simplex". The Times of India. 5 February 2020. ISSN 0971-8257. Retrieved 9 July 2023.
- "MMRDA terminates contracts for Metro Line 2B over delays". The Hindu. 4 February 2020. ISSN 0971-751X. Retrieved 9 July 2023.
- ^ "Mumbai Metropolitan Region Development Authority appoints new contractor to complete unfinished Metro 2B work". The Times of India. 23 March 2022. ISSN 0971-8257. Retrieved 9 July 2023.
- Shah, Narendra (31 May 2021). "J Kumar wins contract worth INR 1308 crores for balance work of Mumbai Metro Line 2B". Metro Rail News. Retrieved 9 July 2023.
- Nair, Shalini (1 June 2021). "MMRDA awards Mumbai Metro order to Indian firm J Kumar Infraprojects". Railway Technology. Retrieved 9 July 2023.
- "Mumbai: MMRDA appoints new contractor for BKC-Chembur Metro 2B work". Free Press Journal. Retrieved 9 July 2023.
- "Mumbai: MMRDA resumes Metro 2B work, 'pillars to be up by 2024'". The Times of India. 5 March 2023. ISSN 0971-8257. Retrieved 9 July 2023.
- "Mumbai Metro: Construction work on Metro Line 2B resumes; pillars to be up by 2024, says MMRDA". TimesNow. 6 March 2023. Retrieved 9 July 2023.
- "Mumbai: 70 percent work of Mandale carshed of Metro 2B line completed". Mumbai Live. 31 May 2023. Retrieved 9 July 2023.
- "Mumbai Metropolitan Region Development Authority - Metro Line - 2". mmrda.maharashtra.gov.in. Archived from the original on 26 September 2017. Retrieved 21 May 2019.
- "Line 2A-Project Features-Stations". MMRDA. Archived from the original on 5 October 2017. Retrieved 7 June 2017.
- "Line 2B-Project Features-Stations". MMRDA. Archived from the original on 26 September 2017. Retrieved 7 June 2017.
- "Mumbai: You can now hire public bikes from Metro 2A, 7 stations". The Times of India. 16 June 2022. ISSN 0971-8257. Retrieved 9 July 2023.
- "Consultant for MTHL finalized". The Times of India. 26 November 2016. Archived from the original on 27 November 2016. Retrieved 26 November 2016.
- "Mumbai Trans-Harbour Link: MMRDA approves appointment of general consultants". The Indian Express. 26 November 2016. Archived from the original on 26 November 2016. Retrieved 26 November 2016.
- "General consultant appointed for MTHL project". dna. 25 November 2016. Archived from the original on 26 November 2016. Retrieved 26 November 2016.
- "Asian Development Bank To Lend $926 Million For Mumbai Metro Rail Project". NDTV.com. Archived from the original on 2 March 2019. Retrieved 14 March 2019.
- Shah, Narendra (23 November 2018). "BEML bags Rs.3,015 Crore Contract for Mumbai Metro Corridor". Metro Rail News. Retrieved 9 July 2023.
- "Rs.3,015 crore order bagged by BEML for Mumbai Metro Corridor - Make in India" initiatives of MOHUA". 22 November 2018.
- ^ "Mumbai: Manufacturing of coaches commences for Metro Lines 2A, 2B and 7". Mid-day. 1 August 2019. Retrieved 9 July 2023.
- "BEML delivers first India-made driverless metro cars to Mumbai Metro". domain-b.com. Retrieved 9 July 2023.
- "BEML starts work on Mumbai metro cars". Deccan Herald. 30 July 2019. Retrieved 10 July 2023.
- "Mumbai Metro gets first 'Make in India' driverless metro cars with bi-cycle parking facility; details here". Financialexpress. 8 September 2019. Retrieved 9 July 2023.
- "Mumbai: 1st rake for Metro-2A arrives; CM to unveil it on Friday". Hindustan Times. 28 January 2021. Retrieved 9 July 2023.
- "BEML bags Rs3,015-cr order for Mumbai Metro Corridor". domain-b.com. Retrieved 9 July 2023.
- "At Mumbai Metro's Charkop depot, women employees bridge the gender gap". The Indian Express. 16 October 2022. Retrieved 9 July 2023.
- "Alstom to provide state-of-the-art signalling system for Mumbai Metro and Pune Metro". Financialexpress. 1 April 2019. Retrieved 9 July 2023.
- "Alstom bags Rs 700 crore contracts from Mumbai, Pune metros". Construction Week. Retrieved 9 July 2023.
- "Adani to supply power for MMRDA's two new metro lines". Hindustan Times. 2 December 2022. Retrieved 9 July 2023.
- "Adani Electricity to power Mumbai Metro Lines 2A & 7 connecting Andheri to Dahisar". Free Press Journal. Retrieved 9 July 2023.
- Release, Press. "Datamatics wins AFC System contract for Mumbai Metro Line 2A, 2B & 7". www.datamatics.com.
- Mahale, Ajeet (7 February 2019). "MMRDA finalises firm for AFC on 3 Metro lines". The Hindu. Retrieved 5 December 2022.
- "Datamatics Wins Automated Fare Collection Contract for Mumbai Metro Line 2A, 2B and 7". Business Standard India. Press Trust of India. 8 February 2019. Retrieved 5 December 2022.
Mumbai Metro stations | |||||
---|---|---|---|---|---|
Line 2 |
| ||||
Depot(s) |
| ||||
|