The BMT Lexington Avenue Line (also called the Lexington Avenue Elevated) was the first standard elevated railway in Brooklyn, New York, operated in its later days by the Brooklyn Rapid Transit Company, the Brooklyn–Manhattan Transit Corporation, and then the City of New York.
The original line, as it existed at the end of 1885, traveled from Fulton Ferry in Downtown Brooklyn east to East New York, passing over York Street, turning right onto Hudson Avenue (which is now a pedestrian walkway within the Farrugut Houses), left onto Park Avenue, right onto Grand Avenue, left onto Lexington Avenue, right onto Broadway, and slight left onto Fulton Street.
The structure above Broadway and Fulton Street is now part of the BMT Jamaica Line. The original structure east of Alabama Avenue in East New York still exists, although it has been rebuilt to support subway cars, which are heavier than the former elevated cars. The remaining elevated structure is the oldest such structure in the subway system.
History
The Brooklyn Elevated Railroad opened the line to passengers at 16:00 on May 13, 1885, with a five-cent fare for trains every five minutes. The original line ran from York and Washington Streets (near the Brooklyn Bridge) along York Street, Hudson Avenue, Park Avenue, Grand Avenue, Lexington Avenue, and Broadway to Gates Avenue. The three stations on Park Avenue had island platforms, while all the other stations had two side platforms.
The first extension, east to Manhattan Beach Crossing in East New York, named for the crossing of the Manhattan Beach Division of the Long Island Rail Road, opened at 09:00 on June 14, 1885. Arrangements were made with the LIRR for joint tickets to Manhattan Beach, as well as with the Grand Street, Prospect Park and Flatbush Railroad (Franklin Avenue Line of streetcars) and Brooklyn, Flatbush and Coney Island Railway (Brighton Beach Line) to Brighton Beach. Other connections at East New York included the Long Island Rail Road towards the east, the Brooklyn and Rockaway Beach Railroad (Canarsie Line), and the New York, Woodhaven and Rockaway Railroad. Shops, car houses, and other facilities were located at East New York, where the New York City Subway's East New York Yard still stands.
On September 5, 1885, the line was extended one more station to Alabama Avenue near the Howard House, a union station for the steam and horse railroads into East New York. Another east terminal at Van Siclen Avenue was opened on December 3, 1885, with the structure above Fulton Street extending east two more blocks to Schenck Street. After a half day of infrequent service, trains began serving the new station on a regular schedule the next morning.
Several weeks before the line was completed to Van Siclen Avenue, the western terminal at Fulton Ferry was opened at noon on November 11, 1885. This portion of the line was built above York Street to just shy of the bridge, where it turned northwest parallel to the bridge, not turning back west under the bridge until Plymouth Street at the East River. That same day, a covered walkway above Washington Street from the inbound platform of the York and Washington Streets station to the Brooklyn Bridge was opened.
Brooklyn Elevated Railroad leased the newer Union Elevated Railroad, which had yet to run a train, on May 13, 1887. However, the two companies, despite sharing large portions of their lines, remained technically separate, commonly called the "Brooklyn and Union Elevated Railroads", until they merged in October 1890 and kept the Brooklyn Elevated Railroad name.
On April 10, 1888, Union Elevated opened the first piece of the Myrtle Avenue elevated, from Adams Street at City Hall east over Myrtle Avenue to Grand Avenue, where it junctioned with the Brooklyn elevated. The company operated through to the end of the Brooklyn elevated at Van Siclen Avenue. Another branch operated by Union Elevated, the Broadway elevated from Gates Avenue northwest to Driggs Avenue in Williamsburg, opened on June 25, 1888. This was extended to Broadway Ferry on July 14, 1888. The Myrtle Avenue elevated was extended north over Adams Street to Sands Street at the Brooklyn Bridge on September 1, 1888, and the Union elevated began running between Sands Street and Van Siclen Avenue. Union Elevated opened the Hudson Avenue elevated, a branch of the Brooklyn elevated from the intersection of Hudson and Park Avenues south to the Long Island Rail Road's Flatbush Avenue terminal, on November 5, 1888, and began operating between Fulton Ferry and Flatbush Avenue.
Another piece of the Myrtle Avenue elevated, from the crossing of the Brooklyn elevated at Grand Avenue east to Broadway, opened on April 27, 1889. Trains on this route did not cross the line on Grand Avenue, but turned onto Grand Avenue and used the Brooklyn elevated to Fulton Ferry. Simultaneously, the original Brooklyn elevated route via Lexington Avenue to Fulton Ferry was discontinued, with all Lexington Avenue trains running over Myrtle Avenue to the Brooklyn Bridge, and passengers for the ferry required to transfer at Myrtle Avenue station via several stairways.
Effective December 9, 1889, a new service pattern went into effect, in which the structure above Park Avenue and its three stations, two of them located one long block north of Myrtle Avenue stations, were closed. Myrtle Avenue trains, which had used this structure since April 27, instead continued along Myrtle Avenue to Hudson Avenue, turning north there via a new junction into the Hudson Avenue elevated, closed north of Myrtle Avenue since shortly after it opened due to safety concerns with the at-grade crossing at Myrtle Avenue. Thus passengers transferring between the two lines could disembark at Navy Street and simply enter the next train on the other route. The company continued to operate one daily train, closed to passengers, over Park Avenue, "to satisfy, it is thought, legal requirements", according to the Brooklyn Daily Eagle.
The structure above Park Avenue, closed to passengers since late 1889, was finally removed in late 1891. The New York State Board of Railroad Commissioners approved its abandonment on late December 1891, and removal soon began of the entire portion on Park Avenue, from the Hudson Avenue Elevated east to Grand Avenue, as well as the portion above Grand Avenue north of the Myrtle Avenue Elevated. This was the only part of the New York City elevated system to be permanently closed without ever having been electrified. By August 9, 1900, the rest of the line was electrified with third rail.
An extension of the Brooklyn elevated east to Cypress Hills, over Fulton Street and Crescent Street, opened on May 30, 1893, and the Brooklyn Union elevated extended both Lexington Avenue Line and Broadway Line trains to the new terminal. This extension incorporated portions of the old structure over Park Avenue.
The original Brooklyn elevated over Hudson Avenue and York Street to Fulton Ferry, only used by Myrtle Avenue elevated trains after 1889, was closed on April 11, 1904.
On April 27, 1950 it was announced that the line would be demolished at the suggestion of the Board of Transportation and the Brooklyn Borough President John Cashmore. Cashmore, following the line's demolition, wanted to widen the street to become a major traffic artery. The demolition of the line was expected to save $781,000 annually. Patronage on the line had decreased to 7,337 daily passengers, and the fare booths on the line were closed between 9 P.M. and 5. A.M., requiring conductors to collect fares onboard. The last Lexington Avenue train ran at 21:00 on October 13, 1950, with a small celebration, 65 years after the line opened. Transportation Commissioner G. Joseph Minetti joked that "if we had this many passengers riding regularly we wouldn't have to shut it down." Demolition began on November 1. Former riders of the Lexington Avenue Line were encouraged to use bus service along Gates and DeKalb Avenues or to use the IND Crosstown Line subway.
Service patterns
The original service pattern was a single line from Fulton Ferry to East New York. On April 27, 1889, all Lexington Avenue trains began using the Myrtle Avenue elevated to Sands Street at the Brooklyn Bridge, while the old portion above Park Avenue, Hudson Avenue, and other streets to Fulton Ferry became part of the outer Myrtle Avenue service. The Park Avenue structure was last used on December 8, 1889, but Myrtle Avenue trains continued to use the line on Hudson Avenue to Fulton Ferry. All Lexington Avenue trains served Sands Street after 1889, but Myrtle Avenue trains began alternating between Fulton Ferry and Sands Street on April 10, 1899, in order to avoid the transferring of Myrtle Avenue passengers to trains bound for the bridge. Lexington Avenue trains were extended from Sands Street over the Brooklyn Bridge to Park Row in June 1898. This pattern remained until the line to Fulton Ferry closed on April 11, 1904.
Main article: BMT 12From 1904 until the abandonment of service on October 13, 1950, the Lexington Avenue service pattern (labeled 12 after 1924) was relatively simple. Trains began at either Park Row in Lower Manhattan or Sands Street in Downtown Brooklyn, and ran along the Broadway elevated at least to East New York and sometimes to Jamaica.
Station listing
Original line from Fulton Ferry
Beginning on April 27, 1889, all Lexington Avenue trains used the Myrtle Avenue elevated west of Myrtle Avenue station, and this line was only used by Myrtle Avenue trains.
Name | Location | Opened | Closed | Notes |
---|---|---|---|---|
Fulton Ferry | Fulton Ferry | November 11, 1885 | April 11, 1904 | Separate terminal adjacent to the terminal of BMT Fulton Street Line, line between Fulton Ferry and Washington Street is along ROW on the north side of the Brooklyn Bridge |
York and Washington Streets | York Street and Washington Street | May 13, 1885 | April 11, 1904 | Connection to the Brooklyn Bridge and New York and Brooklyn Bridge Railway |
Bridge Street | York Street and Bridge Street | May 13, 1885 | April 11, 1904 | |
Navy Street | Park Avenue and Navy Street | May 13, 1885 | December 8, 1889 | |
Cumberland Street | Park Avenue and Cumberland Street | May 13, 1885 | December 8, 1889 | |
Washington Avenue | Park Avenue and Washington Avenue | May 13, 1885 | December 8, 1889 |
Later line from the Brooklyn Bridge
Lexington Avenue trains were moved to this route on April 27, 1889, joining the old route just west of Myrtle Avenue station.
Demolished section
This section of the line closed in three stages. Service past Bridge–Jay Streets ended in 1944. Service on the section shared with the BMT Myrtle Avenue Line ended in 1969 when that line closed, 19 years after the BMT Lexington Avenue Line itself was demolished between Washington Avenue on the Myrtle Avenue Line and Gates Avenue on the Jamaica Line.
Name | Opened | Closed | Notes |
---|---|---|---|
Manhattan | |||
Park Row | June 1898 | March 5, 1944 | |
Brooklyn | |||
Sands Street | September 1, 1888 | March 5, 1944 | |
Adams Street | April 10, 1888 | March 5, 1944 | |
Bridge–Jay Street | April 10, 1888 | 1950 | Free transfers were offered to the IND Fulton Street Line at Jay Street – Borough Hall (present day A, C, and F and <F> trains) after 1944. |
Navy Street | April 10, 1888 | October 4, 1969 | |
Vanderbilt Avenue | April 10, 1888 | 1950 | |
Washington Avenue | April 10, 1888 | October 4, 1969 | |
Myrtle Avenue | After 1912 | October 13, 1950 | connection to Myrtle Avenue elevated trains and Myrtle Avenue Line streetcars |
DeKalb Avenue | May 13, 1885 | October 13, 1950 | connection to DeKalb Avenue Line streetcars |
Greene Avenue | May 13, 1885 | October 13, 1950 | connection to Greene and Gates Avenues Line streetcars |
Franklin Avenue | May 13, 1885 | October 13, 1950 | connection to Franklin Avenue Line and Greene and Gates Avenues Line streetcars |
Nostrand Avenue | May 13, 1885 | October 13, 1950 | connection to Nostrand Avenue Line and Lorimer Street Line streetcars |
Tompkins Avenue | May 13, 1885 | October 13, 1950 | connection to Tompkins Avenue Line, Marcy Avenue Line, and Ocean Avenue Line streetcars |
Sumner Avenue | May 13, 1885 | October 13, 1950 | connection to Sumner Avenue Line streetcars |
Reid Avenue | May 13, 1885 | October 13, 1950 | connection to Utica and Reid Avenues Line streetcars |
BMT Jamaica Line
Just before Gates Avenue, Lexington Avenue trains joined the BMT Jamaica Line. The section of the BMT Jamaica Line used by Lexington Avenue trains is now used by the J and Z trains. The former connection to the BMT Lexington Avenue Line can be seen just west of Gates Avenue.
Name | Opened | Closed | Notes |
---|---|---|---|
Gates Avenue | May 13, 1885 | present | connection to Broadway elevated trains and Broadway Line, Greene and Gates Avenues Line, and Ralph Avenue Line streetcars |
Halsey Street | August 19, 1885 | present | connection to Broadway Line and Putnam Avenue Line streetcars |
Chauncey Street | July 18, 1885 | present | connection to Broadway Line and Wilson Avenue Line streetcars |
Manhattan Beach Crossing | June 14, 1885 | present | connection to the BMT Canarsie Line and IND Fulton Street Line (present day A and C, L trains). |
Alabama Avenue | September 5, 1885 | present | |
Van Siclen Avenue | December 3, 1885 | present | |
Cleveland Street | May 30, 1893 | present | |
Norwood Avenue | May 30, 1893 | present | |
Crescent Street | May 30, 1893 | present | |
Cypress Hills | May 30, 1893 | present |
References
- ^ Rand McNally, 1897 map of Brooklyn
- "Five Cent Fare". Brooklyn Daily Eagle. May 5, 1885. p. 4. Retrieved February 18, 2018.
- "Opening Day". Brooklyn Daily Eagle. May 13, 1885. p. 6. Retrieved February 18, 2018.
- ^ "Done at Last". Brooklyn Daily Eagle. May 13, 1885. p. 1. Retrieved February 18, 2018.
- ^ "East New York". Brooklyn Daily Eagle. June 13, 1885. p. 6. Retrieved February 18, 2018.
- ^ "Still Extending Its Lines". Brooklyn Daily Eagle. September 5, 1885. p. 6. Retrieved February 18, 2018.
- ^ "Finished At Last The Elevated Complete from the River to Schenck Avenue". The Brooklyn Daily Eagle. December 3, 1885. p. 4. Retrieved October 2, 2016 – via Newspapers.com.
- "Brooklyn Elevated Roads". The New York Times. December 4, 1885. ISSN 0362-4331. Retrieved October 2, 2016.
- "Five Hundred Passengers". The Brooklyn Daily Eagle. December 4, 1995. p. 6. Retrieved October 2, 2016 – via Newspapers.com.
- ^ "Will Open on Monday". Brooklyn Daily Eagle. November 1, 1888. p. 5. Retrieved February 18, 2018.
- "Must Walk Around". Brooklyn Daily Eagle. November 18, 1885. p. 4. Retrieved February 18, 2018.
- ^ "At the Ferry". Brooklyn Daily Eagle. November 11, 1885. p. 4. Retrieved February 18, 2018.
- "Elevated Railroad Consolidation". Brooklyn Daily Eagle. May 12, 1887. p. 6. Retrieved February 18, 2018.
- ^ "Surrender of Capital Stock". Brooklyn Daily Eagle. November 18, 1890. p. 1. Retrieved February 18, 2018.
- "Railroad Men Dancing". Brooklyn Daily Eagle. December 7, 1888. p. 1. Retrieved February 18, 2018.
- "Relief from Taxation". Brooklyn Daily Eagle. April 15, 1889. p. 1. Retrieved February 18, 2018.
- ^ "Running Smoothly". Brooklyn Daily Eagle. December 9, 1889. p. 6. Retrieved February 18, 2018.
- "Will Consolidate Monday". Brooklyn Daily Eagle. October 25, 1890. p. 8. Retrieved February 18, 2018.
- ^ "A Start Made". Brooklyn Daily Eagle. April 10, 1888. p. 6. Retrieved February 18, 2018.
- "The Broadway Line Opened". Brooklyn Daily Eagle. June 25, 1888. p. 6. Retrieved February 18, 2018.
- "When the Union Road will be Finished". Brooklyn Daily Eagle. July 13, 1888. p. 1. Retrieved February 18, 2018.
- ^ "To the Bridge: Union Elevated Trains Will Run There Saturday". Brooklyn Daily Eagle. August 30, 1888. p. 4. Retrieved February 18, 2018.
- "Will Open on Saturday". Brooklyn Daily Eagle. April 25, 1889. p. 1. Retrieved February 18, 2018.
- ^
- "Elevated Railroad Criticism". Brooklyn Daily Eagle. May 1, 1889. p. 5. Retrieved February 18, 2018.
- "Trouble on the Elevated Railroad". Brooklyn Daily Eagle. May 1, 1889. p. 5. Retrieved February 18, 2018.
- "Running More Trains". Brooklyn Daily Eagle. January 18, 1890. p. 1. Retrieved February 18, 2018.
- "The Park Avenue Elevated Road". Brooklyn Daily Eagle. December 15, 1891. p. 6. Retrieved February 18, 2018.
- "Tear it Down". Brooklyn Daily Eagle. December 26, 1891. p. 2. Retrieved February 18, 2018.
- "Loop in Operation". Brooklyn Daily Eagle. August 9, 1900. p. 3. Retrieved February 18, 2018.
- ^ "Trains Running This Morning". Brooklyn Daily Eagle. May 30, 1893. p. 10. Retrieved February 18, 2018.
- "Elevated Railroad Extensions". Brooklyn Daily Eagle. May 28, 1893. p. 16. Retrieved February 18, 2018.
- ^ Feinman, Mark S. (February 17, 2001). "Early Rapid Transit in Brooklyn, 1878-1913". www.nycsubway.org. Retrieved February 18, 2018.
- ^ "Old Brooklyn 'El' Is Due To Be Razed; Lexington Ave. Line, Borough's First Rapid Transit Route, Scheduled for Junk Pile". The New York Times. April 28, 1950. ISSN 0362-4331. Retrieved April 4, 2018.
- "Brooklyn 'El' Link Dies With Aplomb; Celebrants Pack Last Train to Run on Lexington Spur, Soon to Be Torn Down In Service For 65 Years Riders Were So Scarce That Its 8 Stations Were Closed at Night for Last 10 Years". The New York Times. October 14, 1950. ISSN 0362-4331. Retrieved April 4, 2018.
- "Brooklyn 'El' To Go Down; Lexington Ave. Line, 65 Years Old, to End Next Friday". The New York Times. October 6, 1950. ISSN 0362-4331. Retrieved April 4, 2018.
- "L Express Trains". Brooklyn Daily Eagle. April 7, 1899. p. 1. Retrieved February 18, 2018.
- "Express Train Service". Brooklyn Daily Eagle. April 8, 1899. p. 16. Retrieved February 18, 2018.
- "Brooklyn Bridge Train Service Ends Today -- Trolley Cars Stay On". The Brooklyn Daily Eagle. March 5, 1944. p. 11. Retrieved October 27, 2021 – via Newspapers.com.
- ^ "1,200 on Last Trip On Myrtle Ave. El; Cars Are Stripped". The New York Times. October 4, 1969. ISSN 0362-4331. Retrieved June 5, 2016.
- ^ "Brooklyn El Link Dies with Aplomb". The New York Times. October 14, 1950.
- "Halsey Street Station Opened". Brooklyn Daily Eagle. August 19, 1885. p. 4. Retrieved February 18, 2018.
- "A New Station Opened". Brooklyn Daily Eagle. July 18, 1885. p. 4. Retrieved February 18, 2018.
Further reading
- A Great Day for Brooklyn, The New York Times May 14, 1885 page 8
- A Short Cut to Coney Island, The New York Times June 15, 1885 page 5
- City and Suburban News, The New York Times November 12, 1885 page 8
- City and Suburban News, The New York Times December 15, 1885 page 8
- Elevated Tracks to Come Down, The New York Times December 25, 1891 page 1
- B.M.T. 'El' Lines to Shift Service; City to Close 2 Sections This Week, The New York Times May 27, 1940 page 19
External links
New York City Subway lines | |||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A Division |
| ||||||||||||||||||||||||
B Division |
| ||||||||||||||||||||||||
Interdivision connections |
| ||||||||||||||||||||||||
Other | |||||||||||||||||||||||||
Note that this is a list of New York City Subway lines, which are the physical infrastructure over which services operate. Lines with colors next to them are trunk lines; trunk lines determine the color of New York City Subway service bullets, except for shuttles, which are dark gray. |
New York City Subway | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Current services |
| ||||||||||||
Defunct services |
| ||||||||||||
Stations (List) |
| ||||||||||||
Divisions | |||||||||||||
Other lists | |||||||||||||
History |
| ||||||||||||
Infrastructure | |||||||||||||
Arts and culture | |||||||||||||
Miscellaneous | |||||||||||||
Other rapid transit in NYC |
|