This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of July 2024, there are 415 operable power reactors in the world, with a combined electrical capacity of 373.7 GW. Additionally, there are 61 reactors under construction and 92 reactors planned, with a combined capacity of 68 GW and 90 GW, respectively, while 343 more reactors are proposed. For non-power reactors, see List of nuclear research reactors. For fuel plants see List of nuclear reprocessing plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).

In the following tables, the capacity (expressed in megawatt, MW) refers to the net capacity, or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.

Argentina

Main article: Nuclear power in Argentina
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Atucha 1 PHWR Siemens-KWU Operation suspended
(under maintenance)
362 1 Jun 1968 24 Jun 1974
2 PHWR Siemens-KWU Operational 745 14 Jul 1981 27 Jun 2014
3 PWR Hualong One Planned 1200
Embalse 1 PHWR CANDU-6 Operational 683 1 Apr 1974 20 Jan 1984 (2049)
CAREM 1 PWR CAREM25 Under construction 25 8 Feb 2014

Armenia

Main article: Nuclear power in Armenia
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Metsamor 1 PWR VVER-440/V-270 Shut down 376 1 Jul 1969 6 Oct 1977 25 Feb 1989
2 PWR VVER-440/V-270 Operational 375 1 Jul 1975 3 May 1980 (2026)

Austria

Main article: Nuclear power in Austria
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Zwentendorf 1 BWR BWR-69 (KWU) Finished; never entered service 878 Apr 1972 5 Nov 1978

Bangladesh

Main article: Nuclear power in Bangladesh
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Rooppur 1 PWR VVER-1200/V-523 Under construction 1080 30 Nov 2017 (2025)
2 PWR VVER-1200/V-523 Under construction 1080 14 Jul 2018 (2026)

Belarus

Main article: Nuclear power in Belarus
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ostrovets 1 PWR VVER-1200/V-491 Operational 1109 6 Nov 2013 10 Jun 2021
2 PWR VVER-1200/V-491 Operational 1109 24 Apr 2014 1 Nov 2023
Minsk 1 PWR VVER-1000 Unfinished 963 1983 1987
2 PWR VVER-1000 Unfinished 963 1983 1987

Belgium

Main article: Nuclear power in Belgium
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
SCK•CEN 1 PWR Westinghouse (WH) BR-3 Decommissioned 10 1 Nov 1957 10 Oct 1962 30 Jun 1987
Doel 1 PWR WH 2 loops Operational 445 1 Jul 1969 15 Feb 1975 (15 feb. 2025)
2 PWR WH 2 loops Operational 445 1 Sep 1971 1 Dec 1975 (1 dec. 2025)
3 PWR Framatome 3 loops Shut down 1006 1 Jan 1975 1 Oct 1982 23 Sep 2022
4 PWR Belgian firms plus WH 3 loops Operational 1039 1 Dec 1978 1 Jul 1985 (1 jul. 2025)

planned prolongation of operations until 2035

Tihange 1 PWR Framatome 3 loops Operational 962 1 Jun 1970 1 Oct 1975 (1 oct. 2025)
2 PWR Framatome 3 loops Shut down 1008 1 Apr 1976 1 Jun 1983 31 Jan 2023
3 PWR Belgian firms plus WH 3 loops Operational 1046 1 Nov 1978 1 Sep 1985 (1 sept. 2025)

planned prolongation of operations until 2035

Brazil

Main article: Nuclear power in Brazil
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Angra 1 PWR WH 2 loops Operational 609 1 May 1971 1 Jan 1985
2 PWR Pre-Konvoi Operational 1275 1 Jan 1976 1 Feb 2001
3 PWR Pre-Konvoi Under construction 1245 1 Jun 2010 (2028)

Bulgaria

Main article: Nuclear power in Bulgaria
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Kozloduy 1 PWR VVER-440/V-230 Shut down 408 1 Apr 1970 28 Oct 1974 31 Dec 2002
2 PWR VVER-440/V-230 Shut down 408 1 Apr 1970 10 Nov 1975 31 Dec 2002
3 PWR VVER-440/V-230 Shut down 408 1 Oct 1973 20 Jan 1981 31 Dec 2006
4 PWR VVER-440/V-230 Shut down 408 1 Oct 1973 20 Jun 1982 31 Dec 2006
5 PWR VVER-1000/V-320 Operational 1003 9 Jul 1980 23 Dec 1988
6 PWR VVER-1000/V-320 Operational 1003 1 Apr 1982 30 Dec 1993
7 PWR AP1000 Planned 1150 (2033)
8 PWR AP1000 Planned 1150
Belene 1 PWR VVER-1000/V-320
VVER-1000/V-446B
Unfinished 953
1011
1987
2008
2 PWR VVER-1000/V-320
VVER-1000/V-446B
Unfinished 953
1011
1987
2008

Canada

Main article: Nuclear power in Canada
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Pickering 1 PHWR CANDU 500A Shut down 515 Jun 1966 29 Jul 1971 1 Oct 2024
2 PHWR CANDU 500A Shut down 515 Sep 1966 30 Dec 1971 31 Dec 1997
3 PHWR CANDU 500A Shut down 515 Dec 1967 1 Jun 1972 29 Dec 1997
4 PHWR CANDU 500A Operational 515 May 1968 17 Jun 1973 (2024)
5 PHWR CANDU 500B Operational 516 Nov 1974 10 May 1983 (2026)
6 PHWR CANDU 500B Operational 516 Oct 1975 1 Feb 1984 (2026)
7 PHWR CANDU 500B Operational 516 Mar 1976 1 Jan 1985 (2026)
8 PHWR CANDU 500B Operational 516 Sep 1976 28 Feb 1986 (2026)
Darlington 1 PHWR CANDU 850 Operational 878 Apr 1982 14 Nov 1992 (2052)
2 PHWR CANDU 850 Operational 878 Sep 1981 9 Oct 1990 (2050)
3 PHWR CANDU 850 Operational 878 Sep 1984 14 Feb 1993 (2053)
4 PHWR CANDU 850 Operational 878 Jul 1985 14 Jun 1993 (2053)
5 BWR BWRX-300 Planned 300 (2023) (2028)
6 BWR BWRX-300 Planned 300 (2023) (2028)
7 BWR BWRX-300 Planned 300 (2023) (2029)
8 BWR BWRX-300 Planned 300 (2023) (2029)
Bruce 1 PHWR CANDU 791 Operational 823 Jun 1971 1 Sep 1977 (2043)
2 PHWR CANDU 791 Operational 823 Dec 1970 1 Sep 1977 (2043)
3 PHWR CANDU 750A Operational 817 Jul 1972 1 Feb 1978 (2064)
4 PHWR CANDU 750A Operational 817 Sep 1972 18 Jan 1979 (2064)
5 PHWR CANDU 750B Operational 817 Jun 1978 1 Mar 1985 (2064)
6 PHWR CANDU 750B Operational 880 Jan 1978 15 Sep 1984 (2064)
7 PHWR CANDU 750B Operational 817 May 1979 10 Apr 1986 (2064)
8 PHWR CANDU 750B Operational 817 Aug 1979 22 May 1987 (2064)
NPD 1 PHWR CANDU Shut down 19 Jan 1958 4 Jun 1962 1 Aug 1987
Douglas Point 1 PHWR CANDU 200 Shut down 200 Feb 1960 26 Sep 1968 4 May 1984
Gentilly 1 BWR CANDU BLWR 250 Shut down 250 Sep 1966 1 May 1972 1 June 1977
2 PHWR CANDU-6 Shut down 635 Apr 1974 1 Oct 1983 28 Dec 2012
Point Lepreau 1 PHWR CANDU-6 Operational 635 May 1975 1 Feb 1983 (2041)

China

Main article: Nuclear power in China
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Bailong 1 PWR CAP-1000 Planned 1100
2 PWR CAP-1000 Planned 1100
Changjiang I-1 PWR CNP-600 Operational 601 25 Apr 2010 25 Dec 2015
I-2 PWR CNP-600 Operational 601 21 Nov 2010 20 Jun 2016
I-3 PWR Hualong One Under construction 1200 31 Mar 2021
I-4 PWR Hualong One Under construction 1200 31 Mar 2021
II-1 PWR ACP-100 Under construction 100 13 Jul 2021
II-2 PWR ACP-100 Planned 100
Daya Bay 1 PWR M-310 Operational 944 7 Aug 1987 1 Feb 1994
2 PWR M-310 Operational 944 7 Apr 1988 6 May 1994
Fangchenggang 1 PWR CPR-1000 Operational 1000 30 Jul 2010 25 Oct 2015
2 PWR CPR-1000 Operational 1000 23 Dec 2010 15 Jul 2016
3 PWR Hualong One Operational 1000 24 Dec 2015 25 Mar 2023
4 PWR Hualong One Operational 1000 24 Dec 2016 25 May 2024
5 PWR Hualong One Planned 1117
6 PWR Hualong One Planned 1117
Fangjiashan 1 PWR CPR-1000 Operational 1012 26 Dec 2008 15 Dec 2014
2 PWR CPR-1000 Operational 1012 17 Jul 2009 12 Feb 2015
Fuqing 1 PWR CPR-1000 Operational 1000 21 Nov 2008 19 Nov 2014
2 PWR CPR-1000 Operational 1000 17 Jun 2009 15 Oct 2015
3 PWR CPR-1000 Operational 1000 31 Dec 2010 7 Sep 2016
4 PWR CPR-1000 Operational 1000 17 Nov 2012 31 Jul 2017
5 PWR Hualong One Operational 1000 15 Apr 2015 30 Jan 2021
6 PWR Hualong One Operational 1000 22 Dec 2015 25 Mar 2022
Haiyang 1 PWR AP1000 Operational 1170 24 Sep 2009 23 Oct 2018
2 PWR AP1000 Operational 1170 20 Jun 2010 9 Jan 2019
3 PWR CAP-1000 Under construction 1100 7 Jul 2022
4 PWR CAP-1000 Under construction 1100 22 Apr 2023
Haixing 1 PWR CAP-1000 Planned 1100
2 PWR CAP-1000 Planned 1100
Hongyanhe 1 PWR CPR-1000 Operational 1061 18 Aug 2007 6 Jun 2013
2 PWR CPR-1000 Operational 1061 28 Mar 2008 13 May 2014
3 PWR CPR-1000 Operational 1061 7 Mar 2009 23 Mar 2015
4 PWR CPR-1000 Operational 1061 15 Aug 2009 1 Apr 2016
5 PWR ACPR-1000 Operational 1061 29 Mar 2015 2 Aug 2021
6 PWR ACPR-1000 Operational 1061 24 Jul 2015 23 Jun 2022
Jinqimen 1 PWR Hualong One Planned 1126
2 PWR Hualong One Planned 1126
Lianjiang 1 PWR CAP-1000 Under construction 1100 27 Sep 2023
2 PWR CAP-1000 Under construction 1100 26 April 2024
Ling Ao 1 PWR M-310 Operational 950 15 May 1997 28 May 2002
2 PWR M-310 Operational 950 28 Nov 1997 8 Jan 2003
3 PWR CPR-1000 Operational 1007 15 Dec 2005 15 Sep 2010
4 PWR CPR-1000 Operational 1007 15 Jun 2006 7 Aug 2011
Lufeng 1 PWR CAP-1000 Planned 1100
2 PWR CAP-1000 Planned 1100
3 PWR CAP-1000 Planned 1100
4 PWR CAP-1000 Planned 1100
5 PWR Hualong One Under construction 1000 8 Sep 2022
6 PWR Hualong One Under construction 1000 26 Aug 2023
Ningde 1 PWR CPR-1000 Operational 1018 18 Feb 2008 15 Apr 2013
2 PWR CPR-1000 Operational 1018 12 Nov 2008 4 May 2014
3 PWR CPR-1000 Operational 1018 8 Jan 2010 10 Jun 2015
4 PWR CPR-1000 Operational 1018 29 Sep 2010 29 Mar 2016
5 PWR Hualong One Under construction 1080 28 Jul 2024
6 PWR Hualong One Planned 1080
Pengze 1 PWR CAP-1000 Planned 1100
2 PWR CAP-1000 Planned 1100
Qinshan I-1 PWR CNP-300 Operational 308 20 Mar 1985 1 Apr 1994
II-1 PWR CNP-600 Operational 610 2 Jun 1996 15 Apr 2002
II-2 PWR CNP-600 Operational 610 1 Apr 1997 3 May 2004
II-3 PWR CNP-600 Operational 619 28 Apr 2006 5 Oct 2010
II-4 PWR CNP-600 Operational 619 28 Jan 2007 30 Dec 2011
III-1 PHWR CANDU-6 Operational 677 8 Jun 1998 31 Dec 2002
III-2 PHWR CANDU-6 Operational 677 25 Sep 1998 24 Jul 2003
San'ao 1 PWR Hualong One Under construction 1117 31 Dec 2020
2 PWR Hualong One Under construction 1000 30 Dec 2021
Sanmen 1 PWR AP1000 Operational 1157 19 Apr 2009 21 Sep 2018
2 PWR AP1000 Operational 1157 15 Dec 2009 5 Nov 2018
3 PWR CAP-1000 Under construction 1163 28 Jun 2022
4 PWR CAP-1000 Under construction 1100 22 Mar 2023
Shidaowan I-1 HTGR HTR-PM Operational 200 9 Dec 2012 6 Dec 2023
II-1 PWR CAP-1400 Under commissioning 1500 19 Jun 2019
II-2 PWR CAP-1400 Under construction 1500 4 Apr 2020
Taipingling 1 PWR Hualong One Under construction 1116 26 Dec 2019
2 PWR Hualong One Under construction 1116 15 Oct 2020
3 PWR Hualong One Planned 1116
4 PWR Hualong One Planned 1116
Taishan 1 PWR EPR Operational 1660 18 Nov 2009 14 Dec 2018
2 PWR EPR Operational 1660 15 Apr 2010 7 Sep 2019
3 PWR EPR Planned 1660
4 PWR EPR Planned 1660
Taohuajiang 1 PWR CAP-1000 Planned 1100
2 PWR CAP-1000 Planned 1100
3 PWR CAP-1000 Planned 1100
4 PWR CAP-1000 Planned 1100
Tianwan 1 PWR VVER-1000/V-428 Operational 990 20 Oct 1999 17 May 2007
2 PWR VVER-1000/V-428 Operational 990 20 Sep 2000 16 Aug 2007
3 PWR VVER-1000/V-428M Operational 1045 27 Dec 2012 14 Feb 2018
4 PWR VVER-1000/V-428M Operational 1045 27 Sep 2013 22 Dec 2018
5 PWR ACPR-1000 Operational 1000 27 Dec 2015 8 Sep 2020
6 PWR ACPR-1000 Operational 1000 7 Sep 2016 3 Jun 2021
7 PWR VVER-1200/V-491 Under construction 1150 19 May 2021 (2027–2028)
8 PWR VVER-1200/V-491 Under construction 1150 25 Feb 2022 (2027–2028)
Xianning 1 PWR CAP-1000 Planned 1100
2 PWR CAP-1000 Planned 1100
Xiapu I-1 SFR CFR-600 Under construction 642 29 Dec 2017 (2024)
I-2 SFR CFR-600 Under construction 642 27 Dec 2020
II-1 PWR CAP-1000 Planned 1100
II-2 PWR CAP-1000 Planned 1100
II-3 PWR CAP-1000 Planned 1100
II-4 PWR CAP-1000 Planned 1100
Xudabao 1 PWR CAP-1000 Under construction 1250 15 Nov 2023
2 PWR CAP-1000 Under construction 1100 17 Jul 2024
3 PWR VVER-1200/V-491 Under construction 1150 28 Jul 2021 (2027)
4 PWR VVER-1200/V-491 Under construction 1150 19 May 2022 (2028)
Xuwei 1 PWR Hualong One Planned 1116
2 PWR Hualong One Planned 1116
3 HTGR HTR-PM600S Planned 600
Yangjiang 1 PWR CPR-1000 Operational 1000 16 Dec 2008 25 Mar 2014
2 PWR CPR-1000 Operational 1000 4 Jun 2009 8 Jun 2015
3 PWR CPR-1000+ Operational 1000 15 Nov 2010 1 Jan 2016
4 PWR CPR-1000+ Operational 1000 17 Nov 2012 15 Mar 2017
5 PWR ACPR-1000 Operational 1000 18 Sep 2013 12 Jul 2018
6 PWR ACPR-1000 Operational 1000 23 Dec 2013 24 Jul 2019
Zhangzhou 1 PWR Hualong One Under commissioning 1126 16 Oct 2019
2 PWR Hualong One Under construction 1126 4 Sep 2020
3 PWR Hualong One Under construction 1126 22 Feb 2024
4 PWR Hualong One Under construction 1000 27 Sep 2024
Zhaoyuan 1 PWR Hualong One Planned 1116
2 PWR Hualong One Planned 1116

Cuba

Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Juragua 1 PWR VVER-440/V-318 Unfinished 440 1983 5 Sep 1992
2 PWR VVER-440/V-318 Unfinished 440 1985 5 Sep 1992

Czech Republic

Main article: Nuclear power in the Czech Republic
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Dukovany 1 PWR VVER-440/V-213 Operational 468 1 Jan 1979 3 May 1985
2 PWR VVER-440/V-213 Operational 471 1 Jan 1979 21 Mar 1986
3 PWR VVER-440/V-213 Operational 468 1 Mar 1979 20 Dec 1986
4 PWR VVER-440/V-213 Operational 471 1 Mar 1979 19 Jul 1987
5 PWR TBD Planned 1200
6 PWR TBD Planned 1200
Temelín 1 PWR VVER-1000/V-320 Operational 1003 1 Feb 1987 10 Jun 2002
2 PWR VVER-1000/V-320 Operational 1003 1 Feb 1987 18 Apr 2003
3 PWR TBD Planned 1200
4 PWR TBD Planned 1200

Egypt

Main article: Nuclear program of Egypt
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
El Dabaa 1 PWR VVER-1200/V-529 Under construction 1200 20 Jul 2022 (2028)
2 PWR VVER-1200/V-529 Under construction 1200 19 Nov 2022
3 PWR VVER-1200/V-529 Under construction 1200 3 May 2023
4 PWR VVER-1200/V-529 Under construction 1200 23 Jan 2024

Finland

Main article: Nuclear power in Finland
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Hanhikivi 1 PWR VVER-1200/V-491 Cancelled 1200 (2023) (2029) 2 May 2022
Loviisa 1 PWR VVER-440/V-213 Operational 507 1 May 1971 9 May 1977
2 PWR VVER-440/V-213 Operational 507 1 Aug 1972 5 Jan 1981
Olkiluoto 1 BWR ASEA-III, BWR-2500 Operational 890 1 Feb 1974 10 Oct 1979
2 BWR ASEA-III, BWR-2500 Operational 890 1 Nov 1975 10 Jul 1982
3 PWR EPR Operational 1600 12 Aug 2005 16 Apr 2023

France

Main article: Nuclear power in France
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Belleville 1 PWR P4 REP 1300 Operational 1310 1 May 1980 1 Jun 1988
2 PWR P4 REP 1300 Operational 1310 1 Aug 1980 1 Jan 1989
Blayais 1 PWR CP1 Operational 910 1 Jan 1977 1 Dec 1981
2 PWR CP1 Operational 910 1 Jan 1977 1 Feb 1983
3 PWR CP1 Operational 910 1 Apr 1978 14 Nov 1983
4 PWR CP1 Operational 910 1 Apr 1978 1 Oct 1983
Brennilis 1 HWGCR Shut down/in decommissioning 70 1 Jul 1962 1 Jun 1968 31 Jul 1985
Bugey 1 GCR UNGG Shut down 540 1 Dec 1965 1 Jul 1972 27 May 1994
2 PWR CP0 Operational 910 1 Nov 1972 1 Mar 1979
3 PWR CP0 Operational 910 1 Sep 1973 1 Mar 1979
4 PWR CP0 Operational 880 1 Jun 1974 1 Jul 1979
5 PWR CP0 Operational 880 1 Jul 1974 3 Jan 1980
6 PWR EPR2 Planned 1670
7 PWR EPR2 Planned 1670
Cattenom 1 PWR P4 REP 1300 Operational 1300 29 Oct 1979 1 Apr 1987
2 PWR P4 REP 1300 Operational 1300 28 Jul 1980 1 Feb 1988
3 PWR P4 REP 1300 Operational 1300 15 Jun 1982 1 Feb 1991
4 PWR P4 REP 1300 Operational 1300 28 Sep 1983 1 Jan 1992
Chinon A-1 GCR UNGG Shut down 70 1 Feb 1957 1 Feb 1964 16 Apr 1973
A-2 GCR UNGG Shut down 180 1 Aug 1959 24 Feb 1965 14 Jun 1985
A-3 GCR UNGG Shut down 360 1 Mar 1961 4 Aug 1966 15 Jun 1990
B-1 PWR CP2 Operational 905 1 Mar 1977 1 Feb 1984
B-2 PWR CP2 Operational 905 1 Mar 1977 1 Aug 1984
B-3 PWR CP2 Operational 905 1 Oct 1980 4 Mar 1987
B-4 PWR CP2 Operational 905 1 Feb 1981 1 Apr 1988
Chooz A-1 PWR CHOOZ-A Decommissioned 305 1 Jan 1962 15 Apr 1967 30 Oct 1991
B-1 PWR N4 REP 1450 Operational 1500 1 Jan 1984 15 May 2000
B-2 PWR N4 REP 1450 Operational 1500 1 Jan 1984 15 May 2000
Civaux 1 PWR N4 REP 1450 Operational 1495 15 Oct 1988 29 Jan 2002
2 PWR N4 REP 1450 Operational 1495 1 Apr 1991 23 Apr 2002
Cruas 1 PWR CP2 Operational 915 1 Aug 1978 2 Apr 1984
2 PWR CP2 Operational 915 15 Nov 1978 1 Apr 1985
3 PWR CP2 Operational 915 15 Apr 1979 10 Sep 1984
4 PWR CP2 Operational 915 1 Oct 1979 11 Feb 1985
Dampierre 1 PWR CP1 Operational 890 1 Feb 1975 10 Sep 1980
2 PWR CP1 Operational 890 1 Apr 1975 16 Feb 1981
3 PWR CP1 Operational 890 1 Sep 1975 27 May 1981
4 PWR CP1 Operational 890 1 Dec 1975 20 Nov 1981
Fessenheim 1 PWR CP0 Shut down 880 1 Sep 1971 1 Jan 1978 22 Feb 2020
2 PWR CP0 Shut down 880 1 Feb 1972 1 Apr 1978 29 Jun 2020
Flamanville 1 PWR P4 REP 1300 Operational 1330 1 Dec 1979 1 Dec 1986
2 PWR P4 REP 1300 Operational 1330 1 May 1980 9 Mar 1987
3 PWR EPR Under commissioning 1600 3 Dec 2007 (2024)
Golfech 1 PWR P4 REP 1300 Operational 1310 17 Nov 1982 1 Feb 1991
2 PWR P4 REP 1300 Operational 1310 1 Oct 1984 4 Mar 1994
Gravelines 1 PWR CP1 Operational 910 1 Feb 1975 25 Nov 1980
2 PWR CP1 Operational 910 1 Mar 1975 1 Dec 1980
3 PWR CP1 Operational 910 1 Dec 1975 1 Jun 1981
4 PWR CP1 Operational 910 1 Apr 1976 1 Oct 1981
5 PWR CP1 Operational 910 1 Oct 1979 15 Jan 1985
6 PWR CP1 Operational 910 1 Oct 1979 25 Oct 1985
7 PWR EPR2 Planned 1670
8 PWR EPR2 Planned 1670
Nogent 1 PWR P4 REP 1300 Operational 1310 26 May 1981 24 Feb 1988
2 PWR P4 REP 1300 Operational 1310 1 Jan 1982 1 May 1989
Paluel 1 PWR P4 REP 1300 Operational 1330 15 Aug 1977 1 Dec 1985
2 PWR P4 REP 1300 Operational 1330 1 Jan 1978 1 Dec 1985
3 PWR P4 REP 1300 Operational 1330 1 Feb 1979 1 Feb 1986
4 PWR P4 REP 1300 Operational 1330 1 Feb 1980 1 Jun 1986
Penly 1 PWR P4 REP 1300 Operational 1330 1 Sep 1982 1 Dec 1990
2 PWR P4 REP 1300 Operational 1330 1 Aug 1984 1 Nov 1992
3 PWR EPR2 Planned 1670 (2024)
4 PWR EPR2 Planned 1670 (2024)
Phénix 1 FBR PH-250 Shut down 130 1 Nov 1968 14 Jul 1974 1 Feb 2010
Saint-Alban 1 PWR P4 REP 1300 Operational 1335 29 Jan 1979 1 May 1986
2 PWR P4 REP 1300 Operational 1335 31 Jul 1979 1 Mar 1987
Saint-Laurent A-1 GCR UNGG Shut down 390 1 Oct 1963 1 Jun 1969 18 Apr 1990
A-2 GCR UNGG Shut down 465 1 Jan 1966 1 Nov 1971 27 May 1992
B-1 PWR CP2 Operational 915 1 May 1976 1 Aug 1983
B-2 PWR CP2 Operational 915 1 Jul 1976 1 Aug 1983
Superphénix 1 FBR Na-1200 Shut down/in decommissioning 1200 13 Dec 1976 1 Dec 1986 31 Dec 1998
Tricastin 1 PWR CP1 Operational 915 1 Nov 1974 1 Dec 1980
2 PWR CP1 Operational 915 1 Dec 1974 1 Dec 1980
3 PWR CP1 Operational 915 1 Apr 1975 11 May 1981
4 PWR CP1 Operational 915 1 May 1975 1 Nov 1981

Germany

Main article: Nuclear power in Germany
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
AVR 1 HTGR PBR Prototype Shut down 13 1 Aug 1961 19 May 1969 31 Dec 1988
Biblis 1 PWR Siemens-KWU Shut down/in decommissioning 1167 1 Jan 1970 26 Feb 1975 6 Aug 2011
2 PWR KWU Shut down/in decommissioning 1240 1 Feb 1972 31 Jan 1977 6 Aug 2011
Brokdorf 1 PWR KWU Shut down 1410 1 Jan 1976 22 Dec 1986 31 Dec 2021
Brunsbüttel 1 BWR BWR-69 Shut down 771 15 Apr 1970 9 Feb 1977 6 Aug 2011
Emsland 1 PWR Konvoi [de] (KWU) Shut down 1329 10 Aug 1982 20 Jun 1988 15 Apr 2023
Grafenrheinfeld 1 PWR KWU Shut down 1275 1 Jan 1975 17 Jun 1982 27 Jun 2015
Greifswald 1 PWR VVER-440/V-230 Shut down/in decommissioning 408 1 Mar 1970 12 Jul 1974 14 Feb 1990
2 PWR VVER-440/V-230 Shut down/in decommissioning 408 1 Mar 1970 16 Apr 1975 14 Feb 1990
3 PWR VVER-440/V-230 Shut down/in decommissioning 408 1 Apr 1972 1 May 1978 28 Feb 1990
4 PWR VVER-440/V-230 Shut down/in decommissioning 408 1 Apr 1972 1 Nov 1979 22 Jul 1990
5 PWR VVER-440/V-213 Shut down/in decommissioning 408 1 Dec 1976 1 Nov 1989 24 Nov 1989
6 PWR VVER-440/V-213 Finished; never entered service 408
Grohnde 1 PWR KWU Shut down 1360 1 Jun 1976 1 Feb 1985 31 Dec 2021
Grosswelzheim 1 BWR BWR Dismantled 25 1 Jan 1965 2 Aug 1970 20 Apr 1971
Gundremmingen A BWR GE, BWR-1 Shut down/in decommissioning 237 12 Dec 1962 12 Apr 1967 13 Jan 1977
B BWR BWR-72 (KWU) Shut down 1284 20 Jul 1976 19 Jul 1984 31 Dec 2017
C BWR BWR-72 (KWU) Shut down 1288 20 Jul 1976 18 Jan 1985 31 Dec 2021
Isar 1 BWR BWR-69 Shut down/in decommissioning 878 1 May 1972 21 Mar 1979 6 Aug 2011
2 PWR Konvoi [de] (KWU) Shut down 1410 15 Sep 1982 9 Apr 1988 15 Apr 2023
Kahl 1 BWR BWR Dismantled 15 1 Jul 1958 1 Feb 1962 25 Nov 1985
SNR-300 1 FBR Finished; never entered service 1972 1985
KNK II 1 FBR Shut down 17 1 Sep 1974 3 Mar 1979 23 Aug 1991
Krümmel 1 BWR BWR-69 (KWU) Shut down 1346 5 Apr 1974 28 Mar 1984 6 Aug 2011
Lingen 1 BWR BWR Shut down 183 1 Oct 1964 1 Oct 1968 5 Jan 1977
Mülheim-Kärlich 1 PWR B & W Shut down/in decommissioning 1219 15 Jan 1975 8 Aug 1987 9 Sep 1988
MZFR 1 PHWR PHWR Shut down 52 1 Dec 1961 19 Dec 1966 3 May 1984
Neckarwestheim 1 PWR KWU Shut down 785 1 Feb 1972 1 Dec 1976 6 Aug 2011
2 PWR Konvoi [de] (KWU) Shut down 1310 9 Nov 1982 15 Apr 1989 15 Apr 2023
Niederaichbach 1 HWGCR Pressure tube reactor Shut down/decommissioned 100 1 Jun 1966 1 Jan 1973 31 Jul 1974
Obrigheim 1 PWR Siemens Shut down/in decommissioning 340 15 Mar 1965 31 Mar 1969 11 May 2005
Philippsburg 1 BWR BWR-69 Shut down 890 1 Oct 1970 26 Mar 1980 6 Aug 2011
2 PWR KWU Shut down 1402 7 Jul 1977 18 Apr 1985 31 Dec 2019
Rheinsberg 1 PWR VVER-70 Shut down/in decommissioning 62 1 Jan 1960 11 Oct 1966 1 Jun 1990
Stade 1 PWR Siemens Shut down/in decommissioning 640 1 Dec 1967 19 May 1972 4 Nov 2003
Stendal 1 PWR VVER-1000/V-320 Unfinished 1983 1990
2 PWR VVER-1000/V-320 Unfinished 1983 1990
THTR-300 1 HTGR PBR Decommissioned 296 3 May 1971 1 Jun 1987 29 Sep 1988
Unterweser 1 PWR KWU Shut down/in decommissioning 1345 1 Jul 1972 6 Sep 1979 6 Aug 2011
Würgassen 1 BWR BWR-69 (AEG) Shut down/in decommissioning 640 26 Jan 1968 11 Nov 1975 26 Aug 1994

Hungary

Main article: Nuclear power in Hungary
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Paks 1 PWR VVER-440/V-213 Operational 470 1 Aug 1974 10 Aug 1983
2 PWR VVER-440/V-213 Operational 473 1 Aug 1974 14 Nov 1984
3 PWR VVER-440/V-213 Operational 473 1 Oct 1979 1 Dec 1986
4 PWR VVER-440/V-213 Operational 471 1 Oct 1979 1 Nov 1987
5 PWR VVER-1200 Planned 1114 (2025)
6 PWR VVER-1200 Planned 1114 (2025)

India

Main article: Nuclear power in India
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Chutka 1 PHWR IPHWR-700 Planned 630 (2032)
2 PHWR IPHWR-700 Planned 630 (2033)
Gorakhpur 1 PHWR IPHWR-700 Under construction 630 2022 (2028)
2 PHWR IPHWR-700 Under construction 630 2022 (2029)
3 PHWR IPHWR-700 Planned 630 (2032)
4 PHWR IPHWR-700 Planned 630 (2033)
Kaiga 1 PHWR IPHWR-220 Operational 202 1 Sep 1989 16 Nov 2000
2 PHWR IPHWR-220 Operational 202 1 Dec 1989 16 Mar 2000
3 PHWR IPHWR-220 Operational 202 30 Mar 2002 6 May 2007
4 PHWR IPHWR-220 Operational 202 10 May 2002 20 Jan 2011
5 PHWR IPHWR-700 Under construction 630 2022 (2029)
6 PHWR IPHWR-700 Under construction 630 2022 (2030)
Kakrapar 1 PHWR IPHWR-220 Operational 202 1 Dec 1984 6 May 1993
2 PHWR IPHWR-220 Operational 202 1 Apr 1985 1 Sep 1995
3 PHWR IPHWR-700 Operational 630 22 Nov 2010 30 Jun 2023
4 PHWR IPHWR-700 Operational 630 22 Nov 2010 31 Mar 2024
Kalpakkam 1 SFR PFBR Under commissioning 490 23 Oct 2004 (2025)
Kudankulam 1 PWR VVER-1000/V-412 Operational 932 31 Mar 2002 31 Dec 2014
2 PWR VVER-1000/V-412 Operational 932 4 Jul 2002 31 Mar 2017
3 PWR VVER-1000/V-412 Under construction 917 30 Jun 2017 (2025)
4 PWR VVER-1000/V-412 Under construction 917 23 Oct 2017 (2026)
5 PWR VVER-1000/V-412 Under construction 917 29 Jun 2021 (2029)
6 PWR VVER-1000/V-412 Under construction 917 20 Dec 2021 (2030)
Madras 1 PHWR IPHWR-220 Operation suspended
(under maintenance)
202 1 Jan 1971 27 Jan 1984
2 PHWR IPHWR-220 Operational 202 1 Oct 1972 21 Mar 1986
Mahi Banswara 1 PHWR IPHWR-700 Planned 630 (2031)
2 PHWR IPHWR-700 Planned 630 (2032)
3 PHWR IPHWR-700 Planned 630 (2033)
4 PHWR IPHWR-700 Planned 630 (2034)
Narora 1 PHWR IPHWR-220 Operational 202 1 Dec 1976 1 Jan 1991
2 PHWR IPHWR-220 Operational 202 1 Nov 1977 1 Jul 1992
Rajasthan 1 PHWR CANDU Shut down 90 1 Aug 1965 16 Dec 1973 9 Oct 2004
2 PHWR CANDU Operational 187 1 Apr 1968 1 Apr 1981
3 PHWR IPHWR-220 Operational 202 1 Feb 1990 1 Jun 2000
4 PHWR IPHWR-220 Operational 202 1 Oct 1990 23 Dec 2000
5 PHWR IPHWR-220 Operational 202 18 Sep 2002 4 Feb 2010
6 PHWR IPHWR-220 Operational 202 20 Jan 2003 31 Mar 2010
7 PHWR IPHWR-700 Under commissioning 630 18 Jul 2011 (2025)
8 PHWR IPHWR-700 Under construction 630 30 Sep 2011 (2026)
Tarapur 1 BWR BWR-1 (Mark 2) Operation suspended
(under maintenance)
150 1 Oct 1964 28 Oct 1969
2 BWR BWR-1 (Mark 2) Operation suspended
(under maintenance)
150 1 Oct 1964 28 Oct 1969
3 PHWR IPHWR-540 Operational 490 12 May 2000 18 Aug 2006
4 PHWR IPHWR-540 Operational 490 8 Mar 2000 12 Sep 2005

Iran

Main article: Nuclear program of Iran
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Bushehr 1 PWR VVER-1000/V-446 Operational 915 1 May 1975 23 Sep 2013
2 PWR VVER-1000/V-528 Under construction 915 27 Sep 2019
3 PWR VVER-1000 Planned 915
Darkhovin 1 PWR Unfinished; restart planned 360

Italy

Main article: Nuclear power in Italy
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Caorso 1 BWR BWR-4 Mark2 Shut down/in decommissioning 860 1 Jan 1970 1 Dec 1981 1 Jul 1990
Enrico Fermi 1 PWR WH 4-loop Shut down/in decommissioning 260 1 Jul 1961 1 Jan 1965 1 Jul 1990
Garigliano 1 BWR BWR-1 Shut down/in decommissioning 150 1 Nov 1959 1 Jun 1964 1 Mar 1982
Latina 1 GCR Magnox Shut down/in decommissioning 153 1 Nov 1958 1 Jan 1964 1 Dec 1987
Alto Lazio 1 BWR Unfinished 982 1 Jul 1982 1 Jan 1988
2 BWR Unfinished 982 1 Jul 1982 1 Jul 1988
Trino 2 [IT] 1 PWR Unfinished 950 23 Dec 1987
2 PWR Unfinished 950 23 Dec 1987

Japan

Main article: Nuclear power in Japan
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Fugen 1 HWLWR ATR Shut down 148 10 May 1972 20 Mar 1979 29 Mar 2003
Fukushima Daiichi 1 BWR BWR-3 Inoperable 439 25 Jul 1967 26 Mar 1971 19 May 2011
2 BWR BWR-4 Inoperable 760 9 Jun 1969 18 Jul 1974 19 May 2011
3 BWR BWR-4 Inoperable 760 28 Dec 1970 27 Mar 1976 19 May 2011
4 BWR BWR-4 Inoperable 760 12 Feb 1973 12 Oct 1978 19 May 2011
5 BWR BWR-4 Shut down 760 22 May 1972 18 Apr 1978 17 Dec 2013
6 BWR BWR-5 Shut down 1067 26 Oct 1973 24 Oct 1979 17 Dec 2013
Fukushima Daini 1 BWR BWR-5 Shut down 1067 16 Mar 1976 20 Apr 1982 30 Sep 2019
2 BWR BWR-5 Shut down 1067 25 May 1979 3 Feb 1984 30 Sep 2019
3 BWR BWR-5 Shut down 1067 23 Mar 1981 21 Jun 1985 30 Sep 2019
4 BWR BWR-5 Shut down 1067 28 May 1981 25 Aug 1987 30 Sep 2019
Genkai 1 PWR Mitsubishi (2-loop) Shut down 529 15 Sep 1971 15 Oct 1975 27 Apr 2015
2 PWR Mitsubishi (2-loop) Shut down 529 1 Feb 1977 30 Mar 1981 9 Apr 2019
3 PWR Mitsubishi (4-loop) Operational 1127 1 Jun 1988 18 Mar 1994
4 PWR Mitsubishi (4-loop) Operational 1127 15 Jul 1992 25 Jul 1997
Hamaoka 1 BWR BWR-4 Shut down 515 10 Jun 1971 17 Mar 1976 30 Jan 2009
2 BWR BWR-4 Shut down 806 14 Jun 1974 29 Nov 1978 30 Jan 2009
3 BWR BWR-5 Operation suspended
(under review)
1056 18 Apr 1983 28 Aug 1987
4 BWR BWR-5 Operation suspended
(under review)
1092 13 Oct 1989 3 Sep 1993
5 BWR ABWR Operation suspended 1325 12 Jul 2000 18 Jan 2005
Higashidōri (Tōhoku) 1 BWR BWR-5 Operation suspended
(under review)
1067 7 Nov 2000 8 Dec 2005
Higashidōri (Tokyo) 1 BWR ABWR Unfinished; restart planned 1350 25 Jan 2011
Ikata 1 PWR Mitsubishi (2-loop) Shut down 538 1 Sep 1973 30 Sep 1977 25 Mar 2016
2 PWR Mitsubishi (2-loop) Shut down 538 1 Aug 1978 19 Mar 1982 27 Mar 2018
3 PWR Mitsubishi (3-loop) Operational 846 1 Oct 1990 15 Dec 1994
Kashiwazaki-Kariwa 1 BWR BWR-5 Operation suspended 1067 5 Jun 1980 18 Sep 1985
2 BWR BWR-5 Operation suspended 1067 18 Nov 1985 28 Sep 1990
3 BWR BWR-5 Operation suspended 1067 7 Mar 1989 11 Aug 1993
4 BWR BWR-5 Operation suspended 1067 5 Mar 1990 11 Aug 1994
5 BWR BWR-5 Operation suspended 1067 20 Jun 1985 10 Apr 1990
6 BWR ABWR Operation suspended
(restart approved)
1315 3 Nov 1992 7 Nov 1996
7 BWR ABWR Operation suspended
(restart approved)
1315 1 Jul 1993 2 Jul 1997
Mihama 1 PWR Mitsubishi (2-loop) Shut down 320 1 Feb 1967 28 Nov 1970 Mar 2015
2 PWR Mitsubishi (2-loop) Shut down 470 29 May 1968 25 Jul 1972 Mar 2015
3 PWR Mitsubishi (3-loop) Operational 780 7 Aug 1972 1 Dec 1976
Monju 1 FBR Shut down 246 10 May 1986 29 Aug 1995 5 Dec 2017
Ōi 1 PWR W (4-loop) Shut down 1120 26 Oct 1972 27 Mar 1979 Dec 2017
2 PWR Westinghouse (4-loop) Shut down 1120 8 Dec 1972 5 Dec 1979 Dec 2017
3 PWR Mitsubishi (4-loop) Operational 1127 3 Oct 1987 18 Dec 1991
4 PWR Mitsubishi (4-loop) Operational 1127 13 Jun 1988 2 Feb 1993
Ōma 1 BWR ABWR Under construction 1325 7 May 2010
Onagawa 1 BWR BWR-4 Shut down 498 8 Jul 1980 1 Jun 1984 21 Dec 2018
2 BWR BWR-5 Operational 796 12 Apr 1991 28 Jul 1995
3 BWR BWR-5 Operation suspended 796 23 Jan 1998 30 Jan 2002
Sendai 1 PWR Mitsubishi (3-loop) Operational 846 15 Dec 1979 4 Jul 1984
2 PWR Mitsubishi (3-loop) Operational 846 12 Oct 1981 28 Nov 1985
Shika 1 BWR BWR-5 Operation suspended 505 1 Jul 1989 30 Jul 1993
2 BWR ABWR Operation suspended
(under review)
1108 20 Aug 2001 15 Mar 2006
Shimane 1 BWR BWR-3 Shut down 439 2 Jul 1970 29 Mar 1974 Mar 2015
2 BWR BWR-5 Operational 789 2 Feb 1985 10 Feb 1989
3 BWR ABWR Under construction 1325 12 Oct 2007
Takahama 1 PWR Mitsubishi (3-loop) Operational 780 25 Apr 1970 14 Nov 1974
2 PWR Mitsubishi (3-loop) Operational 780 9 Mar 1971 14 Nov 1975
3 PWR Mitsubishi (3-loop) Operational 830 12 Dec 1980 17 Jan 1985
4 PWR Mitsubishi (3-loop) Operational 830 19 Mar 1981 5 Jun 1985
Tōkai 1 GCR Magnox Shut down 137 1 Mar 1961 25 Jul 1966 31 Mar 1998
2 BWR BWR-5 Operation suspended
(restart approved)
1060 3 Oct 1973 28 Nov 1978
Tomari 1 PWR Mitsubishi (2-loop) Operation suspended
(under review)
550 18 Apr 1985 22 Jun 1989
2 PWR Mitsubishi (2-loop) Operation suspended
(under review)
550 13 Jun 1985 12 Apr 1991
3 PWR Mitsubishi (3-loop) Operation suspended
(under review)
866 18 Nov 2004 22 Dec 2009
Tsuruga 1 BWR BWR-2 Shut down 340 24 Nov 1966 14 Mar 1970 Mar 2015
2 PWR Mitsubishi (4-loop) Operation suspended
(under review)
1108 6 Nov 1982 17 Feb 1987

Kazakhstan

Main article: Nuclear power in Kazakhstan
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Aktau 1 FBR BN-350 Shut down/in decommissioning 350 1 Oct 1964 16 Jul 1973 22 Apr 1999

Lithuania

Main article: Nuclear power in Lithuania
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ignalina 1 LWGR RBMK-1500 Shut down/in decommissioning 1185 1 May 1977 31 Dec 1983 31 Dec 2004
2 LWGR RBMK-1500 Shut down/in decommissioning 1185 1 Jan 1978 Aug 1987 31 Dec 2009
3 LWGR RBMK-1500 Unfinished 1185

Mexico

Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Laguna Verde 1 BWR BWR-5 Operational 804 1 Oct 1976 28 Jul 1990
2 BWR BWR-5 Operational 800 1 Jun 1977 10 Apr 1995

Netherlands

Main article: Nuclear power in the Netherlands
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Borssele 1 PWR KWU 2LP Operational 482 1 Jul 1969 26 Oct 1973 (2033)
Dodewaard 1 BWR BWR-2 Shut down 55 1 May 1965 26 Mar 1969 26 Mar 1997

North Korea

Main article: Nuclear power in North Korea
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Yongbyon 1 GCR Magnox (Pu-production) Shut down 5 1994
2 LWR Planned 30
Taechon 1 Unfinished 200 1994
Kumho 1 PWR Unfinished 1000 2003
2 PWR Unfinished 1000 2003

Pakistan

Main article: Nuclear power in Pakistan
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Chashma 1 PWR CNP-300 Operational 300 1 Aug 1993 15 Sep 2000
2 PWR CNP-300 Operational 300 28 Dec 2005 18 May 2011
3 PWR CNP-300 Operational 315 28 May 2011 6 Dec 2016
4 PWR CNP-300 Operational 313 18 Dec 2011 19 Sep 2017
5 PWR Hualong One Planned 1080
Karachi 1 PHWR CANDU Shut down 90 1 Aug 1966 7 Dec 1972 1 Aug 2021
2 PWR Hualong One Operational 1014 23 May 2013 19 Mar 2021
3 PWR Hualong One Operational 1014 31 May 2016 18 Apr 2022

Philippines

Main article: Nuclear power in the Philippines
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Bataan 1 PWR Westinghouse Unfinished; restart planned 621 1976 1986

Poland

Main article: Nuclear power in Poland
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Żarnowiec 1 PWR VVER-440 Unfinished 440 31 Mar 1982 4 Sep 1990
2 PWR VVER-440 Unfinished 440 31 Mar 1982 4 Sep 1990
Choczewo 1 PWR AP1000 Planned 1250 (2026) (2033)
2 PWR AP1000 Planned 1250 (2035–2036)
3 PWR AP1000 Planned 1250 (2037–2039)
Pątnów 1 PWR APR-1400 Planned 1340
2 PWR APR-1400 Planned 1340
Włocławek 1 BWR BWRX-300 Planned 300 (2030)
Ostrołęka 1 BWR BWRX-300 Planned 300 (2030)
Warsaw 1 BWR BWRX-300 Planned 300 (2030)
Tarnobrzeg/Stalowa Wola 1 BWR BWRX-300 Planned 300 (2030)
Dąbrowa Górnicza 1 BWR BWRX-300 Planned 300 (2030)
Stawy Monowskie 1 BWR BWRX-300 Planned 300 (2030)
Kraków 1 BWR BWRX-300 Planned 300 (2030)

Romania

Main article: Nuclear power in Romania
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Cernavodă 1 PHWR CANDU-6 Operational 650 31 Mar 1983 2 Dec 1996
2 PHWR CANDU-6 Operational 650 1 Jul 1983 1 Nov 2007
3 PHWR CANDU-6 Unfinished; restart planned 650
4 PHWR CANDU-6 Unfinished; restart planned 650
5 PHWR CANDU-6 Unfinished 650

Russia

Main article: Nuclear power in Russia See also: List of cancelled nuclear reactors in Russia
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Akademik Lomonosov 1 PWR KLT-40S Operational 32 15 Apr 2007 19 Dec 2019
2 PWR KLT-40S Operational 32 15 Apr 2007 19 Dec 2019
Balakovo 1 PWR VVER-1000/V-320 Operational 950 1 Dec 1980 23 May 1986
2 PWR VVER-1000/V-320 Operational 950 1 Aug 1981 18 Jan 1988
3 PWR VVER-1000/V-320 Operational 950 1 Nov 1982 8 Apr 1989
4 PWR VVER-1000/V-320 Operational 950 1 Apr 1984 22 Dec 1993
Beloyarsk 1 LWGR AMB-100 Shut down 102 1 Jun 1958 26 Apr 1964 1 Jan 1983
2 LWGR AMB-200 Shut down 146 1 Jan 1962 1 Dec 1969 1 Jan 1990
3 SFR BN-600 Operational 560 1 Jan 1969 1 Nov 1981
4 SFR BN-800 Operational 789 18 Jul 2006 10 Dec 2015
5 SFR BN-1200 Planned 1100
Bilibino 1 LWGR EGP-6 Shut down 11 1 Jan 1970 1 Apr 1974 14 Jan 2019
2 LWGR EGP-6 Operational 11 1 Jan 1970 1 Feb 1975
3 LWGR EGP-6 Operational 11 1 Jan 1970 1 Feb 1976
4 LWGR EGP-6 Operational 11 1 Jan 1970 1 Jan 1977
Kalinin 1 PWR VVER-1000/V-338 Operational 950 1 Feb 1977 12 Jun 1985
2 PWR VVER-1000/V-338 Operational 950 1 Feb 1982 3 Mar 1987
3 PWR VVER-1000/V-320 Operational 950 1 Oct 1985 8 Nov 2005
4 PWR VVER-1000/V-320 Operational 950 1 Aug 1986 25 Dec 2012
Kaliningrad 1 PWR VVER-1200/V-491 Under construction
(suspended)
1109 22 Feb 2012
2 PWR VVER-1200/V-491 Planned 1109
Kola 1 PWR VVER-440/V-230 Operational 441 1 May 1970 28 Dec 1973
2 PWR VVER-440/V-230 Operational 441 1 May 1970 21 Feb 1975
3 PWR VVER-440/V-213 Operational 441 1 Apr 1977 3 Dec 1982
4 PWR VVER-440/V-213 Operational 441 1 Aug 1976 6 Dec 1984
Kola II 1 PWR VVER-S-600 Planned 600 (2028) (2034)
2 PWR VVER-S-600 Planned 600 (2028) (2034)
Kostroma 1 PWR VVER-1200 Unfinished; restart planned 1300 1979
2 PWR VVER-1200 Unfinished; restart planned 1300 1979
3 PWR VVER-1200 Unfinished; restart planned 1300 1979
4 PWR VVER-1200 Unfinished; restart planned 1300 1979
Kursk 1 LWGR RBMK-1000 Shut down 925 1 Jun 1972 12 Oct 1977 19 Dec 2021
2 LWGR RBMK-1000 Shut down 925 1 Jan 1973 17 Aug 1979 31 Jan 2024
3 LWGR RBMK-1000 Operational 925 1 Apr 1978 30 Mar 1984
4 LWGR RBMK-1000 Operational 925 1 May 1981 5 Feb 1986
5 LWGR RBMK-1000 Unfinished 925 1985
6 LWGR RBMK-1000 Unfinished 925 1985
Kursk II 1 PWR VVER-TOI/V-510 Under construction 1115 29 Apr 2018 (2025)
2 PWR VVER-TOI/V-510 Under construction 1115 15 Apr 2019 (2026)
3 PWR VVER-TOI Planned 1115
4 PWR VVER-TOI Planned 1115
Leningrad 1 LWGR RBMK-1000 Shut down 925 1 Mar 1970 1 Nov 1974 21 Dec 2018
2 LWGR RBMK-1000 Shut down 925 1 Jun 1970 11 Feb 1976 10 Nov 2020
3 LWGR RBMK-1000 Operational 925 1 Dec 1973 29 Jun 1980
4 LWGR RBMK-1000 Operational 925 1 Feb 1975 29 Aug 1981
Leningrad II 1 PWR VVER-1200/V-491 Operational 1085 25 Oct 2008 29 Oct 2018
2 PWR VVER-1200/V-491 Operational 1085 15 Apr 2010 22 Mar 2021
3 PWR VVER-1200 Under construction 1085 14 Mar 2024 (2030)
4 PWR VVER-1200 Planned 1085 (2025) (2032)
MPEB No. 1 1 PWR RITM-200S Under construction 53 30 Aug 2022 (2027)
2 PWR RITM-200S Under construction 53 30 Aug 2022 (2027)
MPEB No. 2 1 PWR RITM-200S Planned 53 (2022) (2027)
2 PWR RITM-200S Planned 53 (2022) (2027)
MPEB No. 3 1 PWR RITM-200S Planned 53 (2022) (2028)
2 PWR RITM-200S Planned 53 (2022) (2028)
MPEB No. 4 1 PWR RITM-200S Planned 53 (2022) (2031)
2 PWR RITM-200S Planned 53 (2022) (2031)
Nizhny Novgorod 1 PWR VVER-1200 Planned 1300
2 PWR VVER-1200 Planned 1300
3 PWR VVER-1200 Planned 1300
4 PWR VVER-1200 Planned 1300
Novovoronezh 1 PWR VVER/V-210 Shut down 197 1 Jul 1957 31 Dec 1964 16 Feb 1988
2 PWR VVER/V-365 Shut down 336 1 Jun 1964 14 Apr 1970 29 Aug 1990
3 PWR VVER-440/V-179 Shut down 385 1 Jul 1967 29 Jun 1972 25 Dec 2016
4 PWR VVER 440/V-179 Operational 385 1 Jul 1967 24 Mar 1973
5 PWR VVER-1000/V-187 Operational 950 1 Mar 1974 20 Feb 1981
Novovoronezh II 1 PWR VVER-1200/V-392M Operational 1114 24 Jun 2008 27 Feb 2017
2 PWR VVER-1200/V-392M Operational 1114 12 Jul 2009 6 Nov 2019
3 PWR VVER-1200 Planned 1175
4 PWR VVER-1200 Planned 1175
Obninsk 1 LWGR AM-1 Shut down 5 1 Jan 1951 1 Dec 1954 29 Apr 2002
Rostov 1 PWR VVER-1000/V-320 Operational 950 1 Sep 1981 25 Dec 2001
2 PWR VVER-1000/V-320 Operational 950 1 May 1983 10 Dec 2010
3 PWR VVER-1000/V-320 Operational 950 15 Sep 2009 27 Dec 2014
4 PWR VVER-1000/V-320 Operational 1011 16 Jun 2010 28 Sep 2018
Sakha 1 PWR RITM-200N Planned 55 (2024) (2028)
Seversk 1 FBR BREST-300 Under construction 280 8 Jun 2021 (2026)
South Urals 1 FBR BN-1200 Unfinished; restart planned 1100 1982
2 FBR BN-1200 Unfinished; restart planned 1100 1982
3 FBR BN-1200 Unfinished; restart planned 1100 1982
Smolensk 1 LWGR RBMK-1000 Operational 925 1 Oct 1975 30 Sep 1983
2 LWGR RBMK-1000 Operational 925 1 Jun 1976 2 Jul 1985
3 LWGR RBMK-1000 Operational 925 1 May 1984 12 Oct 1990
Smolensk II 1 PWR VVER-TOI Planned 1300
2 PWR VVER-TOI Planned 1300
Tatar 1 PWR VVER-1200 Unfinished; restart planned 1300 1980
2 PWR VVER-1200 Unfinished; restart planned 1300 1980

Slovakia

Main article: Nuclear power in Slovakia
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Bohunice A-1 HWGCR KS 150 Decommissioned 93 1 Aug 1958 25 Dec 1972 22 Feb 1977
1 PWR VVER-440/V-230 Shut down 408 24 Apr 1972 1 Apr 1980 31 Dec 2006
2 PWR VVER-440/V-230 Shut down 408 24 Apr 1972 1 Jan 1981 31 Dec 2008
3 PWR VVER-440/V-213 Operational 472 1 Dec 1976 14 Feb 1985 (2045)
4 PWR VVER-440/V-213 Operational 471 1 Dec 1976 18 Dec 1985 (2045)
Mochovce 1 PWR VVER-440 V-213 Operational 436 13 Oct 1983 29 Oct 1998 (2058)
2 PWR VVER-440/V-213 Operational 436 13 Oct 1983 11 Apr 2000 (2060)
3 PWR VVER-440/V-213 Operational 440 27 Jan 1987 17 Oct 2023
4 PWR VVER-440/V-213 Under construction 440 27 Jan 1987

Slovenia

Main article: Nuclear power in Slovenia
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Krško 1 PWR WH 2 loops Operational 688 30 Mar 1975 1 Jan 1983 (2043)
2 PWR TBD Planned 1100 (2030)

South Africa

Main article: Nuclear power in South Africa
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Koeberg 1 PWR CP1 (France) Operational 930 1 Jul 1976 21 Jul 1984
2 PWR CP1 (France) Operational 930 1 Jul 1976 9 Nov 1985

South Korea

Main article: Nuclear power in South Korea
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
(planned)
Closed
Hanbit 1 PWR WH F Operational 960 4 Jun 1981 25 Aug 1986
2 PWR WH F Operational 958 10 Dec 1981 10 Jun 1987
3 PWR OPR-1000 Operational 997 23 Dec 1989 31 Mar 1995
4 PWR OPR-1000 Operational 997 26 May 1990 1 Jan 1996
5 PWR OPR-1000 Operational 997 29 Jun 1997 21 May 2002
6 PWR OPR-1000 Operational 995 20 Nov 1997 24 Dec 2002
Hanul 1 PWR CP1 (France) Operational 960 26 Jan 1983 10 Sep 1988
2 PWR CP1 (France) Operational 962 5 Jul 1983 30 Sep 1989
3 PWR OPR-1000 Operational 994 21 Jul 1993 11 Aug 1998
4 PWR OPR-1000 Operational 998 1 Nov 1993 31 Dec 1999
5 PWR OPR-1000 Operational 996 1 Oct 1999 29 Jul 2004
6 PWR OPR-1000 Operational 996 29 Sep 2000 22 Apr 2005
Shin-Hanul 1 PWR APR-1400 Operational 1340 10 Jul 2012 7 Dec 2022
2 PWR APR-1400 Operational 1340 19 Jul 2012 5 Apr 2024
3 PWR APR-1400 Under construction 1340 30 Oct 2024 (2032)
4 PWR APR-1400 Under construction 1340 30 Oct 2024 (2033)
Kori 1 PWR WH 60 Shut down 576 27 Apr 1972 29 Apr 1978 18 Jun 2017
2 PWR WH F Operational 640 4 Dec 1977 25 Jul 1983
3 PWR WH F Operational 1011 1 Oct 1979 30 Sep 1985
4 PWR WH F Operational 1012 1 Apr 1980 29 Apr 1986
Shin-Kori 1 PWR OPR-1000 Operational 996 16 Jun 2006 28 Feb 2011
2 PWR OPR-1000 Operational 996 5 Jun 2007 20 Jul 2012
Saeul 1 PWR APR-1400 Operational 1416 16 Oct 2008 15 Jan 2016
2 PWR APR-1400 Operational 1418 19 Aug 2009 29 Aug 2019
3 PWR APR-1400 Under construction 1400 1 Apr 2017
4 PWR APR-1400 Under construction 1400 20 Sep 2018
Wolsong 1 PHWR CANDU-6 Shut down 657 30 Oct 1977 22 Apr 1983 24 Dec 2019
2 PHWR CANDU-6 Operational 655 22 Jun 1992 1 Jul 1997
3 PHWR CANDU-6 Operational 684 17 Mar 1994 1 Jul 1998
4 PHWR CANDU-6 Operational 688 22 Jul 1994 1 Oct 1999
Shin-Wolsong 1 PWR OPR-1000 Operational 991 20 Nov 2007 31 Jul 2012
2 PWR OPR-1000 Operational 960 23 Sep 2008 26 Feb 2015

Spain

Main article: Nuclear power in Spain
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Almaraz 1 PWR WH 3 loops Operational 1011 3 Jul 1973 1 Sep 1983
2 PWR WH 3 loops Operational 1006 3 Jul 1973 1 Jul 1984
Ascó 1 PWR WH 3 loops Operational 995 16 May 1974 10 Dec 1984
2 PWR WH-3 loops Operational 997 7 Mar 1975 31 Mar 1986
Cofrentes 1 BWR BWR-6 Operational 1064 9 Sep 1975 11 Mar 1985
José Cabrera 1 PWR WH 1 loop Shut down/in decommissioning 141 24 Jun 1964 13 Aug 1969 30 Apr 2006
Lemoniz 1 PWR Unfinished 1972 1984
2 PWR Unfinished 1972 1984
Santa María de Garoña 1 BWR BWR-3 Shut down/in decommissioning 446 11 May 1971 15 Feb 1975 6 Jul 2013
Trillo 1 PWR KWU 3 loops Operational 1003 17 Aug 1979 6 Aug 1988
Valdecaballeros 1 BWR Unfinished 1975 1984
2 BWR Unfinished 1975 1984
Vandellòs 1 GCR UNGG Shut down/in decommissioning 480 1967 2 Aug 1972 31 Jul 1990
2 PWR WH 3 loops Operational 1045 29 Dec 1980 8 Mar 1988

Sweden

Main article: Nuclear power in Sweden
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ågesta 1 PHWR R3 Shut down/in decommissioning 10 1 Dec 1957 1 May 1964 2 Jun 1974
Barsebäck 1 BWR ASEA-II Shut down/in decommissioning 600 1 Feb 1971 1 Jul 1975 30 Nov 1999
2 BWR ASEA-II Shut down/in decommissioning 600 1 Jan 1973 1 Jul 1977 31 May 2005
Forsmark 1 BWR ASEA-III, BWR-2500 Operational 986 1 Jun 1973 10 Dec 1980
2 BWR ASEA-III, BWR-2500 Operational 1116 1 Jan 1975 7 Jul 1981
3 BWR ASEA-IV, BWR-3000 Operational 1167 1 Jan 1979 18 Aug 1985
Oskarshamn 1 BWR ASEA-I Shut down/in decommissioning 473 1 Aug 1966 6 Feb 1972 19 Jun 2017
2 BWR ASEA-II Shut down/in decommissioning 638 1 Sep 1969 1 Jan 1975 22 Dec 2016
3 BWR ASEA-IV, BWR-3000 Operational 1450 1 May 1980 15 Aug 1985
Marviken 1 BHWR R4 Unfinished 196 1 Apr 1965 27 May 1970
Ringhals 1 BWR ASEA-I Shut down/in decommissioning 881 1 Feb 1969 1 Jan 1976 31 Dec 2020
2 PWR WH 3-loops Shut down/in decommissioning 904 1 Oct 1970 1 May 1975 30 Dec 2019
3 PWR WH 3-loops Operational 1062 1 Sep 1972 9 Sep 1981
4 PWR WH 3-loops Operational 1104 1 Nov 1973 21 Nov 1983

Switzerland

Main article: Nuclear power in Switzerland
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Beznau 1 PWR WH 2-loops Operational 365 1 Sep 1965 1 Sep 1969 (2029)
2 PWR WH 2-loops Operational 365 1 Jan 1968 1 Dec 1971 (2031)
Gösgen 1 PWR KWU 3-loops Operational 1010 1 Dec 1973 1 Nov 1979
Leibstadt 1 BWR BWR-6 Operational 1220 1 Jan 1974 15 Dec 1984
Lucens 1 HWGCR HWGCR Decommissioned 6 1 Apr 1962 29 Dec 1966 21 Jan 1969
Mühleberg 1 BWR BWR-4 Shut down/in decommissioning 373 1 Mar 1967 6 Nov 1972 20 Dec 2019

Taiwan

Main article: Nuclear power in Taiwan
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Jinshan 1 BWR BWR-4 Shut down/in decommissioning 636 2 Jun 1972 10 Dec 1978 3 Oct 2018
2 BWR BWR-4 Shut down/in decommissioning 636 7 Dec 1973 15 Jul 1979 3 Oct 2018
Kuosheng 1 BWR BWR-6 Shut down 985 19 Nov 1975 28 Dec 1981 1 Jul 2021
2 BWR BWR-6 Shut down 985 15 Mar 1976 16 Mar 1983 15 Mar 2023
Lungmen 1 BWR ABWR Unfinished 1350 31 Mar 1999 27 April 2014
2 BWR ABWR Unfinished 1350 30 Aug 1999 27 April 2014
Maanshan 1 PWR WH 312 3-loop Shut down 951 21 Aug 1978 27 Jul 1984 28 Jul 2024
2 PWR WH 312 3-loop Operational 951 21 Feb 1979 18 May 1985

Turkey

Main article: Nuclear power in Turkey
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Akkuyu 1 PWR VVER-1200/V-509 Under construction 1114 3 Apr 2018 (2025)
2 PWR VVER-1200/V-509 Under construction 1114 8 Apr 2020 (2026)
3 PWR VVER-1200/V-509 Under construction 1114 10 Mar 2021 (2027)
4 PWR VVER-1200/V-509 Under construction 1114 21 Jul 2022 (2028)
Sinop 1 PWR Atmea-1 Cancelled 1100
2 PWR Atmea-1 Cancelled 1100
3 PWR Atmea-1 Cancelled 1100
4 PWR Atmea-1 Cancelled 1100

Ukraine

Main article: Nuclear power in Ukraine
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Chernobyl 1 LWGR RBMK-1000 Shut down/in decommissioning 740 1 Mar 1970 27 May 1978 30 Nov 1996
2 LWGR RBMK-1000 Shut down/in decommissioning 925 1 Feb 1973 28 May 1979 11 Oct 1991
3 LWGR RBMK-1000 Shut down/in decommissioning 925 1 Mar 1976 8 Jun 1982 15 Dec 2000
4 LWGR RBMK-1000 Destroyed 925 1 Apr 1979 26 Mar 1984 26 Apr 1986
5 LWGR RBMK-1000 Unfinished 925
6 LWGR RBMK-1000 Unfinished 925
Chyhyryn 1 PWR AP1000 Planned 1100
2 PWR AP1000 Planned 1100
3 PWR AP1000 Planned 1100
4 PWR AP1000 Planned 1100
Crimean 1 PWR VVER-1000 Unfinished 950 26 Jan 1984 1987
2 PWR VVER-1000 Unfinished 950 26 Jan 1984 1987
Kharkiv 1 PWR VVER-1000 Unfinished 900 1988 1990
2 PWR VVER-1000 Unfinished 900 1988 1990
Khmelnytskyi 1 PWR VVER-1000/V-320 Operational 950 1 Nov 1981 13 Aug 1988
2 PWR VVER-1000/V-320 Operational 950 1 Feb 1985 15 Dec 2005
3 PWR VVER-1000 Under construction 950 1 Sep 1985 (2026)
4 PWR VVER-1000 Under construction 950 1 Jun 1986 (2027)
5 PWR AP1000 Under construction 1100 April 11, 2024 (2029)
6 PWR AP1000 Under construction 1100 April 11, 2024 (2029)
Odesa 1 PWR VVER-1000 Unfinished 900 1989
2 PWR VVER-1000 Unfinished 900 1989
Rivne 1 PWR VVER-440/V-213 Operational 381 1 Aug 1973 22 Sep 1981
2 PWR VVER-440/V-213 Operational 376 1 Oct 1973 29 Jul 1982
3 PWR VVER-1000/V-320 Operational 950 1 Feb 1980 16 May 1987
4 PWR VVER-1000/V-320 Operational 950 1 Aug 1986 6 Apr 2006
5 PWR AP1000 Planned 1100
South Ukraine 1 PWR VVER-1000/V-302 Operational 950 1 Aug 1976 2 Dec 1983
2 PWR VVER-1000/V-338 Operational 950 1 Jul 1981 6 Apr 1985
3 PWR VVER-1000/V-320 Operational 950 1 Nov 1984 29 Dec 1989
4 PWR AP1000 Planned 1100
Zaporizhzhia 1 PWR VVER-1000/V-320 Operational 950 1 Apr 1980 25 Dec 1985
2 PWR VVER-1000/V-320 Operational 950 1 Jan 1981 15 Feb 1986
3 PWR VVER-1000/V-320 Operational 950 1 Apr 1982 5 Mar 1987
4 PWR VVER-1000/V-320 Operational 950 1 Apr 1983 14 Apr 1988
5 PWR VVER-1000/V-320 Operational 950 1 Nov 1985 27 Oct 1989
6 PWR VVER-1000/V-320 Operational 950 1 Jun 1986 17 Sep 1996
7 PWR AP1000 Planned 1100

United Arab Emirates

Main article: Nuclear power in the United Arab Emirates
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Barakah 1 PWR APR-1400 Operational 1345 19 Jul 2012 6 Apr 2021
2 PWR APR-1400 Operational 1345 16 Apr 2013 24 Mar 2022
3 PWR APR-1400 Operational 1345 24 Sep 2014 24 Feb 2023
4 PWR APR-1400 Operational 1345 30 Jul 2015 5 Sep 2024

United Kingdom

Main article: Nuclear power in the United Kingdom See also: Proposed nuclear power stations in the United Kingdom
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Berkeley 1 GCR Magnox Decommissioned 138 1 Jan 1957 12 Jun 1962 31 Mar 1989
2 GCR Magnox Decommissioned 138 1 Jan 1957 20 Oct 1962 26 Oct 1988
Bradwell 1 GCR Magnox Decommissioned 123 1 Jan 1957 1 Jul 1962 31 Mar 2002
2 GCR Magnox Decommissioned 123 1 Jan 1957 12 Nov 1962 30 Mar 2002
Calder Hall 1 GCR Magnox Shut down/in decommissioning 49 1 Aug 1953 1 Oct 1956 31 Mar 2003
2 GCR Magnox Shut down/in decommissioning 49 1 Aug 1953 1 Feb 1957 31 Mar 2003
3 GCR Magnox Shut down/in decommissioning 49 1 Aug 1955 1 May 1958 31 Mar 2003
4 GCR Magnox Shut down/in decommissioning 49 1 Aug 1955 1 Apr 1959 31 Mar 2003
Chapelcross 1 GCR Magnox Shut down/in decommissioning 48 1 Oct 1955 1 Mar 1959 29 Jun 2004
2 GCR Magnox Shut down/in decommissioning 48 1 Oct 1955 1 Aug 1959 29 Jun 2004
3 GCR Magnox Shut down/in decommissioning 48 1 Oct 1955 1 Dec 1959 29 Jun 2004
4 GCR Magnox Shut down/in decommissioning 48 1 Oct 1955 1 Mar 1960 29 Jun 2004
Dounreay 1 SFR DFR Shut down/in decommissioning 11 1 Mar 1955 1 Oct 1962 1 Mar 1977
2 SFR PFR Shut down/in decommissioning 234 1 Jan 1966 1 Jul 1976 31 Mar 1994
Dungeness A A-1 GCR Magnox Shut down/in decommissioning 225 1 Jul 1960 28 Oct 1965 31 Dec 2006
A-2 GCR Magnox Shut down/in decommissioning 225 1 Jul 1960 30 Dec 1965 31 Dec 2006
Dungeness B B-1 GCR AGR Shut down 520 1 Oct 1965 1 Apr 1985 7 Jun 2021
B-2 GCR AGR Shut down 520 1 Oct 1965 1 Apr 1989 7 Jun 2021
Hartlepool 1 GCR AGR Operational 595 1 Oct 1968 1 Apr 1989 (2027)
2 GCR AGR Operational 585 1 Oct 1968 1 Apr 1989 (2027)
Heysham A-1 GCR AGR Operational 585 1 Dec 1970 1 Apr 1989 (2027)
A-2 GCR AGR Operational 575 1 Dec 1970 1 Apr 1989 (2027)
B-1 GCR AGR Operational 610 1 Aug 1980 1 Apr 1989 (2030)
B-2 GCR AGR Operational 610 1 Aug 1980 1 Apr 1989 (2030)
Hinkley Point A 1 GCR Magnox Shut down/in decommissioning 235 1 Nov 1957 30 Mar 1965 23 May 2000
2 GCR Magnox Shut down/in decommissioning 235 1 Nov 1957 5 May 1965 23 May 2000
Hinkley Point B 1 GCR AGR Shut down/in decommissioning 435 1 Sep 1967 2 Oct 1978 1 Aug 2022
2 GCR AGR Shut down/in decommissioning 435 1 Sep 1967 27 Sep 1976 6 Jul 2022
Hinkley Point C 1 PWR EPR Under construction 1600 11 Dec 2018 (2029)
2 PWR EPR Under construction 1600 12 Dec 2019 (2030)
Hunterston A 1 GCR Magnox Shut down/in decommissioning 150 1 Oct 1957 5 Feb 1964 30 Mar 1990
2 GCR Magnox Shut down/in decommissioning 150 1 Oct 1957 1 Jul 1964 31 Dec 1989
Hunterston B 1 GCR AGR Shut down 460 1 Nov 1967 6 Feb 1976 26 Nov 2021
2 GCR AGR Shut down 460 1 Nov 1967 31 Mar 1977 7 Jan 2022
Oldbury 1 GCR Magnox Shut down/in decommissioning 217 1 May 1962 31 Dec 1967 29 Feb 2012
2 GCR Magnox Shut down/in decommissioning 217 1 May 1962 30 Sep 1968 30 Jun 2011
Sizewell A 1 GCR Magnox Shut down/in decommissioning 210 1 Apr 1961 25 Mar 1966 31 Dec 2006
2 GCR Magnox Shut down/in decommissioning 210 1 Apr 1961 15 Sep 1966 31 Dec 2006
Sizewell B 1 PWR WH SNUPPS Operational 1191 18 Jul 1988 22 Sep 1995 (2035)
Sizewell C 1 PWR EPR Planned 1600 (2024)
2 PWR EPR Planned 1600
Torness 1 GCR AGR Operational 595 1 Aug 1980 25 May 1988 (2030)
2 GCR AGR Operational 595 1 Aug 1980 3 Feb 1989 (2030)
Trawsfynydd 1 GCR Magnox Shut down/in decommissioning 195 1 Jul 1959 24 Mar 1965 6 Feb 1991
2 GCR Magnox Shut down/in decommissioning 195 1 Jul 1959 24 Mar 1965 4 Feb 1991
Winfrith 1 SGHWR SGHWR Shut down/in decommissioning 92 1 May 1963 1 Jan 1968 11 Sep 1990
Wylfa 1 GCR Magnox Shut down/in decommissioning 490 1 Sep 1963 1 Nov 1971 30 Dec 2015
2 GCR Magnox Shut down/in decommissioning 490 1 Sep 1963 3 Jan 1972 25 Apr 2012

United States

Main article: Nuclear power in the United States See also: List of cancelled nuclear reactors in the United States, Army Nuclear Power Program, and List of United States Naval reactors For plutonium production reactors, see Hanford Site and Savannah River Site.
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Arkansas Nuclear One 1 PWR B & W (DRY-Cont) Operational 836 1 Oct 1968 21 May 1974
2 PWR CE (DRY) Operational 988 6 Dec 1968 1 Sep 1978
Beaver Valley 1 PWR WH 3-loop (DRY) Operational 908 26 Jun 1970 2 Jul 1976
2 PWR WH 3-loop (DRY) Operational 905 3 May 1974 14 Aug 1987
Big Rock Point 1 BWR BWR-1 Dismantled 67 1 May 1960 29 Mar 1963 29 Aug 1997
Braidwood 1 PWR WH 4-loop (DRY) Operational 1194 1 Aug 1975 29 Jul 1988
2 PWR WH 4-loop (DRY) Operational 1160 1 Aug 1975 17 Oct 1988
Browns Ferry 1 BWR BWR-4 (WET) Operational 1200 1 May 1967 1 Aug 1974
2 BWR BWR-4 (WET) Operational 1200 1 May 1967 1 Mar 1975
3 BWR BWR-4 (WET) Operational 1210 1 Jul 1968 1 Mar 1977
Brunswick 1 BWR BWR-4 (WET) Operational 938 7 Feb 1970 18 Mar 1977
2 BWR BWR-4 (WET) Operational 932 7 Feb 1970 3 Nov 1975
Byron 1 PWR WH 4-loop (DRY) Operational 1164 1 Apr 1975 16 Sep 1985
2 PWR WH 4-loop (DRY) Operational 1136 1 Apr 1975 2 Aug 1987
Callaway 1 PWR WH 4-loop (DRY) Operational 1215 1 Sep 1975 19 Dec 1984
Calvert Cliffs 1 PWR CE 2-loop (DRY) Operational 877 1 Jun 1968 8 May 1977
2 PWR CE 2-loop (DRY) Operational 855 1 Jun 1968 1 Apr 1977
Carbon Free Power Project 1 PWR VOYGR Cancelled 77
2 PWR VOYGR Cancelled 77
3 PWR VOYGR Cancelled 77
4 PWR VOYGR Cancelled 77
5 PWR VOYGR Cancelled 77
6 PWR VOYGR Cancelled 77
Catawba 1 PWR WH 4-loop (ICECOND) Operational 1160 1 May 1974 29 Jun 1985
2 PWR WH 4-loop (ICECOND) Operational 1150 1 May 1974 19 Aug 1986
Clinch River 1 BWR BWRX-300 Planned 300
Clinton 1 BWR BWR-6 (WET) Operational 1062 1 Oct 1975 24 Nov 1987
Columbia 1 BWR BWR-5 (WET) Operational 1131 1 Aug 1972 13 Dec 1984
Comanche Peak 1 PWR WH 4-loop (DRY) Operational 1205 19 Dec 1974 13 Aug 1990
2 PWR WH 4-loop (DRY) Operational 1195 19 Dec 1974 3 Aug 1993
Connecticut Yankee 1 PWR WH (DRY) Dismantled 582 1 May 1964 1 Jan 1968 5 Dec 1996
Cooper 1 BWR BWR-4 (WET) Operational 769 1 Jun 1968 1 Jul 1974
Crystal River 3 1 PWR B & W (DRY) Shut down/in decommissioning 860 25 Sep 1968 13 Mar 1977 5 Feb 2013
Davis–Besse 1 PWR B & W (DRY) Operational 894 1 Sep 1970 31 Jul 1978
Diablo Canyon 1 PWR WH 4-Loop (DRY) Operational 1138 23 Apr 1968 7 May 1985
2 PWR WH 4-Loop (DRY) Operational 1118 9 Dec 1970 13 Mar 1986
Donald C. Cook 1 PWR WH 4-Loop (ICECOND) Operational 1020 25 Mar 1969 27 Aug 1975
2 PWR WH 4-Loop (ICECOND) Operational 1090 25 Mar 1969 1 Jul 1978
Dresden 1 BWR BWR-1 Shut down 197 1 May 1956 4 Jul 1960 31 Oct 1978
2 BWR BWR-3 (WET) Operational 894 10 Jan 1966 9 Jun 1970
3 BWR BWR-3 (WET) Operational 879 14 Oct 1966 16 Nov 1971
Duane Arnold 1 BWR BWR-4 (WET) Shut down 601 22 May 1970 1 Feb 1975 10 Aug 2020
Edwin I. Hatch 1 BWR BWR-4 (WET) Operational 924 30 Sep 1968 31 Dec 1975
2 BWR BWR-4 (WET) Operational 924 1 Feb 1972 5 Sep 1979
Elk River 1 BWR Dismantled 22 1 Jan 1959 1 Jul 1964 1 Feb 1968
Fermi 1 FBR Prototype Shut down 61 8 Aug 1956 7 Aug 1966 29 Nov 1972
2 BWR BWR-4 (WET) Operational 1115 26 Sep 1972 23 Jan 1988
Fort Calhoun 1 PWR CE 2-loop (WET) Shut down 482 7 Jun 1968 9 Aug 1973 24 Oct 2016
Fort St. Vrain 1 HTGR General Atomics Shut down 330 1 Sep 1968 1 Jul 1979 29 Aug 1989
Ginna 1 PWR WH 2-loop (DRY) Operational 560 25 Apr 1966 1 Jun 1970
Grand Gulf 1 BWR BWR-6 (WET) Operational 1401 4 May 1974 1 Jul 1985
H. B. Robinson 1 PWR WH 3-loop (DRY) Operational 735 13 Apr 1967 7 Mar 1971
Hallam 1 SGR Atomics International Dismantled 75 1 Jan 1959 1 Nov 1963 1 Sep 1969
Hartsville A1 BWR BWR-6 Unfinished 1285 23 May 1975 29 Aug 1984
A2 BWR BWR-6 Unfinished 1285 23 May 1975 29 Aug 1984
B1 BWR BWR-6 Unfinished 1285 23 May 1975 22 Mar 1983
B2 BWR BWR-6 Unfinished 1285 23 May 1975 22 Mar 1983
Hope Creek 1 BWR BWR-4 (WET) Operational 1172 1 Mar 1976 20 Dec 1986
Humboldt Bay 1 BWR BWR-1 Dismantled 63 1 Nov 1960 1 Aug 1963 2 Jul 1976
Indian Point 1 PWR Shut down 257 1 May 1956 1 Oct 1962 31 Oct 1974
2 PWR WH 4-loop (DRY) Shut down 998 14 Oct 1966 1 Aug 1974 30 Apr 2020
3 PWR WH 4-loop (DRY) Shut down 1030 1 Nov 1968 30 Aug 1976 30 Apr 2021
James A. FitzPatrick 1 BWR BWR-4 (WET) Operational 813 1 Sep 1968 28 Jul 1975
Joseph M. Farley 1 PWR WH 3-Loop (DRY) Operational 874 1 Oct 1970 1 Dec 1977
2 PWR WH 3-Loop (DRY) Operational 883 1 Oct 1970 30 Jul 1981
Kemmerer 1 SFR Natrium Under construction 345 10 Jun 2024
Kewaunee 1 PWR WH 2-loop (DRY) Shut down 566 6 Aug 1968 16 Jun 1974 7 May 2013
La Crosse 1 BWR BWR-1 Dismantled 48 1 Mar 1963 7 Nov 1969 30 Apr 1987
LaSalle County 1 BWR BWR-5 (WET) Operational 1137 10 Sep 1973 1 Jan 1984
2 BWR BWR-5 (WET) Operational 1140 10 Sep 1973 19 Oct 1984
Limerick 1 BWR BWR-5 (WET) Operational 1134 19 Jun 1974 1 Feb 1986
2 BWR BWR-5 (WET) Operational 1134 19 Jun 1974 8 Jan 1990
Maine Yankee 1 PWR WH (DRY) Dismantled 860 1 Oct 1968 28 Dec 1972 1 Aug 1997
Marble Hill 1 PWR WH (DRY) Unfinished 1130 1 Aug 1977 10 Jan 1984
McGuire 1 PWR WH 4-Loop (ICECOND) Operational 1158 1 Apr 1971 1 Dec 1981
2 PWR WH 4-Loop (ICECOND) Operational 1158 1 Apr 1971 1 Mar 1984
Millstone 1 BWR BWR-3 (WET) Shut down 641 1 May 1966 28 Dec 1970 21 Jul 1998
2 PWR CE 2-loop (DRY) Operational 869 1 Nov 1969 26 Dec 1975
3 PWR WH 4-Loop (DRY) Operational 1210 9 Aug 1974 23 Apr 1986
Monticello 1 BWR BWR-3 (WET) Operational 628 19 Jun 1967 30 Jun 1971
Nine Mile Point 1 BWR BWR-2 (WET) Operational 613 12 Apr 1965 1 Dec 1969
2 BWR BWR-5 (WET) Operational 1277 1 Aug 1975 11 Mar 1988
North Anna 1 PWR WH 3-Loop (DRY) Operational 948 19 Feb 1971 6 Jun 1978
2 PWR WH 3-Loop (DRY) Operational 944 19 Feb 1971 14 Dec 1980
Oconee 1 PWR B & W (DRY) Operational 847 6 Nov 1967 15 Jul 1973
2 PWR B & W (DRY) Operational 848 6 Nov 1967 9 Sep 1974
3 PWR B & W (DRY) Operational 859 6 Nov 1967 16 Dec 1974
Oyster Creek 1 BWR BWR-2 (WET) Shut down 619 15 Dec 1964 23 Dec 1969 17 Sep 2018
Palisades 1 PWR CE 2-loop (DRY) Shut down 805 14 Mar 1967 31 Dec 1971 20 May 2022
Palo Verde 1 PWR CE80 2-loop (DRY) Operational 1311 25 May 1976 28 Jan 1986
2 PWR CE80 2-loop (DRY) Operational 1314 1 Jun 1976 19 Sep 1986
3 PWR CE80 2-loop (DRY) Operational 1312 1 Jun 1976 8 Jan 1988
Parr 1 PHWR CVTR Dismantled 17 1 Jan 1960 18 Dec 1963 10 Jan 1967
Pathfinder 1 BWR BWR-1 Dismantled 59 1 Jan 1959 1 Aug 1966 1 Oct 1967
Peach Bottom 1 GCR Prototype Shut down 40 1 Feb 1962 1 Jun 1966 1 Nov 1974
2 BWR BWR-4 (WET) Operational 1300 31 Jan 1968 5 Jul 1974
3 BWR BWR-4 (WET) Operational 1331 31 Jan 1968 23 Dec 1974
Perry 1 BWR BWR-6 (WET) Operational 1240 1 Oct 1974 18 Nov 1987
Pilgrim 1 BWR BWR-3 (WET) Shut down 677 26 Aug 1968 9 Dec 1972 31 May 2019
Piqua 1 OCR Atomics International Decommissioned 12 1 Jan 1960 1 Nov 1963 1 Jan 1966
Point Beach 1 PWR WH 2-loop (DRY) Operational 591 19 Jul 1967 21 Dec 1970
2 PWR WH 2-loop (DRY) Operational 591 25 Jul 1968 1 Oct 1972
Prairie Island 1 PWR WH 2-loop (DRY) Operational 522 25 Jun 1968 16 Dec 1973
2 PWR WH 2-loop (DRY) Operational 519 25 Jun 1969 21 Dec 1974
Quad Cities 1 BWR BWR-4 (WET) Operational 908 15 Feb 1967 18 Feb 1973
2 BWR BWR-4 (WET) Operational 911 15 Feb 1967 10 Mar 1973
Rancho Seco 1 PWR WH (DRY) Decommissioned 873 1 Apr 1969 17 Apr 1975 23 Jun 1989
River Bend 1 BWR BWR-6 (WET) Operational 967 25 Mar 1977 16 Jun 1986
Salem 1 PWR WH 4-loop (DRY) Operational 1169 25 Sep 1968 30 Jun 1977
2 PWR WH 4-loop (DRY) Operational 1158 25 Sep 1968 31 Oct 1981
San Onofre 1 PWR WH (DRY) Dismantled 436 16 Jul 1964 1 Jan 1968 30 Nov 1992
2 PWR CE (DRY) Shut down/in decommissioning 1070 1 Mar 1974 8 Aug 1983 7 Jun 2013
3 PWR CE (DRY) Shut down/in decommissioning 1180 1 Mar 1974 1 Apr 1984 7 Jun 2013
Saxton 1 PWR Decommissioned 3 1 Jan 1960 Nov 1961 May 1972
Seabrook 1 PWR WH 4-Loop (DRY) Operational 1246 7 Jul 1976 15 Mar 1990
Seadrift 1 HTGR Xe-100 Planned 80
2 HTGR Xe-100 Planned 80
3 HTGR Xe-100 Planned 80
4 HTGR Xe-100 Planned 80
Sequoyah 1 PWR WH 4-Loop (ICECOND) Operational 1152 27 May 1970 1 Jul 1981
2 PWR WH 4-Loop (ICECOND) Operational 1139 27 May 1970 1 Jun 1982
Shearon Harris 1 PWR WH 3-Loop (DRY) Operational 964 28 Jan 1978 2 May 1987
Shippingport 1 PWR WH Dismantled 60 6 Sep 1954 26 May 1958 Dec 1989
Shoreham 1 BWR GE Shut down 820 1 Nov 1972 1 Aug 1986 1 May 1989
SRE 1 FBR Decommissioned 6.5 1954 12 Jul 1957 15 Feb 1964
South Texas 1 PWR WH 4-loop (DRY) Operational 1280 22 Dec 1975 25 Aug 1988
2 PWR WH 4-loop (DRY) Operational 1280 22 Dec 1975 19 Jun 1989
St. Lucie 1 PWR CE (DRY) Operational 981 1 Jul 1970 1 Mar 1976
2 PWR CE (DRY) Operational 987 2 Jun 1977 10 Jun 1983
Surry 1 PWR WH 3-loop (DRY) Operational 838 25 Jun 1968 22 Dec 1972
2 PWR WH 3-loop (DRY) Operational 838 25 Jun 1968 1 May 1973
Susquehanna 1 BWR BWR-5 (WET) Operational 1257 2 Nov 1973 12 Nov 1982
2 BWR BWR-5 (WET) Operational 1257 2 Nov 1973 27 Jun 1984
Three Mile Island 1 PWR B & W (DRY) Shut down 819 18 May 1968 2 Sep 1974 20 Sep 2019
2 PWR B & W (DRY) Core melt 880 1 Nov 1969 30 Dec 1978 28 Mar 1979
Trojan 1 PWR WH (DRY) Dismantled 1095 1 Feb 1970 20 May 1976 9 Nov 1992
Turkey Point 3 PWR WH 3-Loop (DRY) Operational 829 27 Apr 1967 14 Dec 1972
4 PWR WH 3-Loop (DRY) Operational 821 27 Apr 1967 7 Sep 1973
6 PWR AP1000 Planned 1117
7 PWR AP1000 Planned 1117
Vallecitos 1 BWR BWR-1 Shut down 25 1 Jan 1956 19 Oct 1957 9 Dec 1963
Vermont Yankee 1 BWR BWR-4 (WET) Shut down 605 11 Dec 1967 30 Nov 1972 29 Dec 2014
Virgil C. Summer 1 PWR WH 3-Loop (DRY) Operational 973 21 Mar 1973 1 Jan 1984
2 PWR AP1000 Unfinished 1117 9 Mar 2013
3 PWR AP1000 Unfinished 1117 2 Nov 2013
Vogtle 1 PWR WH 4-Loop (DRY) Operational 1150 1 Aug 1976 1 Jun 1987
2 PWR WH 4-Loop (DRY) Operational 1152 1 Aug 1976 20 May 1989
3 PWR AP1000 Operational 1117 12 Mar 2013 31 Jul 2023
4 PWR AP1000 Operational 1117 19 Nov 2013 29 April 2024
Waterford 1 PWR CE 2-loop (DRY) Operational 1168 14 Nov 1974 24 Sep 1985
Watts Bar 1 PWR WH 4-Loop (ICECOND) Operational 1157 20 Jul 1973 27 May 1996
2 PWR WH 4-Loop (ICECOND) Operational 1164 1 Sep 1973 4 Jun 2016
Wolf Creek 1 PWR WH 4-Loop (DRY) Operational 1200 31 May 1977 3 Sep 1985
Yankee Rowe 1 PWR WH (DRY) Dismantled 167 1 Nov 1957 1 Jul 1961 1 Oct 1991
Zion 1 PWR WH (DRY) Dismantled 1040 1 Dec 1968 31 Dec 1973 13 Feb 1998
2 PWR WH (DRY) Dismantled 1040 1 Dec 1968 17 Sep 1974 13 Feb 1998

Uzbekistan

Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Plant in the Jizzakh Region 1 PWR VVER-1200 Planned 1200
2 PWR VVER-1200 Planned 1200

See also

Notes

  1. The full reactor model name is R3/Adam.
  2. The full reactor model name is ASEA-ATOM Gen II.
  3. The full reactor model name is ASEA-ATOM Gen II.
  4. The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69.
  5. The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69.
  6. The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75.
  7. The full reactor model name is ASEA-ATOM Gen I.
  8. The full reactor model name is ASEA-ATOM Gen II.
  9. The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75.
  10. The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.
  11. The full reactor model name is ASEA-ATOM Gen I. Closed at midnight on New Year's Eve.
  12. The full reactor model name is Westinghouse 3-loops.
  13. The full reactor model name is Westinghouse 3-loops.
  14. The full reactor model name is Westinghouse 3-loops.

References

  1. "World Nuclear Power Reactors & Uranium Requirements". world-nuclear.org. World Nuclear Association. Retrieved 5 May 2020.
  2. "PRIS – Home". pris.iaea.org.
  3. "Reference Unit Power" at IAEA
  4. "Nuclear Power in Argentina | Argentinian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 4 August 2019.
  5. "China inks $8 bln nuclear power plant deal in Argentina". Reuters. 2 February 2022. Retrieved 2 February 2022.
  6. Yulia Kosarenko. "NASA fact sheet". Archived from the original on 8 July 2007. Retrieved 20 August 2015.
  7. "The Embalse Nuclear Power Plant returns to service for a new cycle of 30 years". BNamericas.com.
  8. "Metsamor 2 to operate until 2026 : Corporate – World Nuclear News".
  9. "Nuclear Power in Bangladesh – World Nuclear Association". world-nuclear.org. Retrieved 17 July 2018.
  10. "Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина". rosatom.ru.
  11. "Second Belarus unit enters commercial operation". world-nuclear-news.org.
  12. "Doel 3: Shutdown confirmed for Friday". RTBF Info. 23 September 2022. Retrieved 25 September 2022.
  13. "RTBF Info of 21 Dec 2018". RTBF Info. 21 December 2018. Retrieved 28 December 2018.
  14. "Second Belgian reactor enters retirement : Corporate - World Nuclear News".
  15. ^ "Plans for New Nuclear Reactors Worldwide - World Nuclear Association".
  16. ^ "Bulgaria to push ahead with two new units at Kozloduy". world-nuclear-news.org. World Nuclear News. 25 October 2023. Retrieved 3 November 2023.
  17. "Utility abandons Pickering reactor overhaul". The Globe and Mail. 13 August 2005.
  18. "Ontario extends Pickering operations". World Nuclear News. 30 September 2022. Retrieved 7 July 2023.
  19. ^ Patel, Sonal (2 December 2021). "Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection". POWER Magazine. Retrieved 5 December 2021.
  20. "Additional SMRs in the pipeline for Darlington". World Nuclear News. 7 July 2023. Retrieved 7 July 2023.
  21. "Unit 2 sets record run ahead of planned maintenance outage". brucepower.com. 6 May 2022. Retrieved 7 July 2023.
  22. "Life-Extension Program & MCR Project". brucepower.com. Retrieved 7 July 2023.
  23. "Bruce 6 re-enters commercial operation : Corporate - World Nuclear News".
  24. ^ "China / Construction Begins of Two Hualong One Reactors at Changjiang". The Independent Global Nuclear News Agency. Retrieved 28 November 2019.
  25. ^ "我国自主三代核电华龙一号在海南正式开工建设". CNNC. Retrieved 2 April 2021.
  26. "China's first Hualong One nuclear reactor starts Opened". Reuters. 30 January 2021. Retrieved 30 January 2021.
  27. "Second Fuqing Hualong One enters Opened: New Nuclear – World Nuclear News".
  28. "Second AP1000 enters Opened". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  29. "Fourth Chinese AP1000 enters Opened". World Nuclear News. World Nuclear Association. Retrieved 13 January 2019.
  30. "Begin
    buildings on third Haiyang unit"
    . World Nuclear News. World Nuclear Association. Retrieved 25 July 2022.
  31. "Construction begins of fourth Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 26 April 2023.
  32. "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 16 July 2018.
  33. "Fifth Hongyanhe unit enters Opened". World Nuclear News. World Nuclear Association. Retrieved 2 August 2021.
  34. "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 15 June 2018.
  35. "Construction of Lufeng 5 gets under way". World Nuclear News. World Nuclear Association. Retrieved 9 September 2022.
  36. "Construction of Lufeng 6 begins". World Nuclear News. World Nuclear Association. Retrieved 29 August 2023.
  37. "Construction of new Chinese power plant begins: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 5 January 2021.
  38. "First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International". Retrieved 4 January 2022.
  39. "First AP1000 reactor enters Opened". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  40. "Sanmen 2 AP1000 enters Opened – World Nuclear News". world-nuclear-news.org. Retrieved 7 November 2018.
  41. "PRIS – Reactor Details". pris.iaea.org. Retrieved 8 July 2022.
  42. "Begin
    buildings on fourth Sanmen unit"
    . world-nuclear-news.org. Retrieved 23 March 2023.
  43. "China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News".
  44. "Shidaowan Guohe One 1".
  45. "Shidaowan Guohe One 2".
  46. ^ "China approves first new nuclear reactors in 3-plus years". Nikkei Asian Review. Retrieved 2 August 2019.
  47. "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale". Capital.fr (in French). 14 December 2018. Retrieved 14 December 2018.
  48. "World's second EPR starts operations". Retrieved 10 September 2019.
  49. "Fourth Tianwan unit enters Opened". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  50. "Fifth Tianwan unit starts Opened". World Nuclear News. World Nuclear Association. Retrieved 9 September 2020.
  51. "Tianwan 6 enters commercial operation : New Nuclear - World Nuclear News".
  52. "Begin
    buildings on eighth Tianwan unit: New Nuclear – World Nuclear News"
    .
  53. "Fast nuclear reactor to start construction in Fujian in 2017". 16 August 2015. Archived from the original on 17 August 2015. Retrieved 16 August 2015.
  54. "China starts building second CFR-600 fast reactor: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 30 December 2020.
  55. "Work on Xudabao unit 1 gets under way". world-nuclear-news.org. Retrieved 17 November 2023.
  56. "Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)". ruscable.ru.
  57. "Construction of Xudapu 4 under way: New Nuclear – World Nuclear News".
  58. "Yangjiang 5 enters Opened". world-nuclear-news.org. Retrieved 16 July 2018.
  59. "Begin
    buildings on first Zhangzhou unit – World Nuclear News"
    . world-nuclear-news.org. Retrieved 18 October 2019.
  60. "Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News".
  61. "PRIS – Reactor Details".
  62. "Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News".
  63. "Nuclear power plants in Finland". STUK. 6 April 2021. Retrieved 13 May 2022.
  64. "Fennovoima cancels Hanhikivi 1 contract with Russia". World Nuclear Association. 3 May 2022.
  65. "Fennovoima terminates contract for Hanhikivi 1 NPP construction". TASS. 2 May 2022.
  66. "PRIS – Reactor Details".
  67. "Faulty seals replaced in Olkiluoto EPR : Regulation & Safety - World Nuclear News".
  68. "Further delay to Flamanville EPR start up". World Nuclear News.
  69. "EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News". world-nuclear-news.org. Retrieved 9 December 2023.
  70. ^ "Germany shuts three of its last six nuclear plants". Retrieved 1 January 2022.
  71. "German reactor permanently shut down". world-nuclear-news.org. Retrieved 10 May 2018.
  72. "Germany shuts down Philippsburg 2". energycentral.com. Retrieved 8 January 2020.
  73. ^ "Status report 74 – Indian 220 MWe PHWR (IPHWR-220)" (PDF).
  74. ^ "Status report 105 – Indian 700 MWe PHWR (IPHWR-700)" (PDF).
  75. "В Индии началось сооружение блока № 6 АЭС "Куданкулам"". ase-ec.ru (in Russian). Retrieved 21 December 2021.
  76. "PRIS – Reactor Details".
  77. "Genkai unit 4 supplying power again". world-nuclear-news.org. Retrieved 22 June 2018.
  78. ^ "Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute". genanshin.jp. Retrieved 3 October 2021.
  79. "東通原子力発電所1号機の着工について". Tokyo Electric Power Company Holdings, Inc. Retrieved 27 June 2023.
  80. ^ "Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)". fepc.or.jp. Retrieved 8 May 2018.
  81. "40年超の美浜原発3号機が再稼働 原発事故後 全国初". NHK. Retrieved 23 June 2021.
  82. "Ohi No.4 reactor restarted- News – NHK WORLD – English". NHK WORLD. Archived from the original on 10 May 2018. Retrieved 10 May 2018.
  83. "Japan's Tohoku Elec restarts Onagawa reactor after 13-year hiatus – Reuters". Reuters. Retrieved 29 October 2024.
  84. "運転開始40年超高浜原発1号機 約12年ぶりに再稼働". Retrieved 28 July 2023.
  85. "Takahama 2 reactor restarted". Retrieved 15 September 2023.
  86. "Japan approves extension for reactor similar to Fukushima units that melted down – Reuters". Reuters. Retrieved 29 December 2019.
  87. ^ "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North. U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 January 2016. Archived from the original on 9 April 2016. Retrieved 4 April 2016.
  88. "PRIS - Reactor Details".
  89. "Philippines relaunches nuclear energy programme : Nuclear Policies". World Nuclear News. 3 March 2022. Retrieved 29 April 2022.
  90. ^ "Poland's Westinghouse choice 'deepens strategic relationship' with USA". 31 October 2022.
  91. "Poland's government confirms Westinghouse for nuclear plant". 4 November 2022.
  92. "South Korea's KHNP signs letter of intent on Polish nuclear". 31 October 2022.
  93. ^ "Taki reaktor chcą zbudować Orlen i Synthos". 18 April 2023.
  94. "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". rosatom.ru. Retrieved 1 January 2020.
  95. ^ "Nuclear Power in Russia | Russian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 14 May 2018.
  96. "Кольскую АЭС-2 начнут строить в 2028 году". Retrieved 9 December 2023.
  97. "Kursk's second unit retires after 45 years operation". Retrieved 31 January 2024.
  98. "Запуск первого энергоблока Курской АЭС-2 планируется в декабре 2024". Ixbt.com.
  99. "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". rosenergoatom.ru. Retrieved 16 April 2019.
  100. "Russia retires Leningrad unit 1". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  101. "Four New NPP Units Will be Built in Russia".
  102. "Ленинградской атомной станции добавят мощности". 15 March 2024.
  103. "Russia commits to further floating NPPs : New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 28 July 2021.
  104. ""Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа". Interfax.ru (in Russian). Retrieved 3 September 2021.
  105. "Russia plans new generation of FNPPS – Nuclear Engineering International". 6 January 2021.
  106. ^ "Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш". aem-group.ru. Archived from the original on 30 August 2022. Retrieved 30 August 2022.
  107. "В Якутии собираются строить АЭС мощностью не менее 55 МВт".
  108. ""Росатом" начал строительство реактора Брест-300 в Северске". 8 June 2021.
  109. "Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International". 26 June 2020.
  110. "VVER units planned for Leningrad and Smolensk".
  111. Shut down after a 1977 refuelling incident; decommission in progress since 1979
  112. "Tlačová agentúra Slovenskej republiky – TASR.sk". tasr.sk. Archived from the original on 20 January 2009.
  113. "Power commissioning of Mochovce 3 completed".
  114. "Krško gets an overhaul : Corporate – World Nuclear News".
  115. "Drugi blok NE Krško prve megavate mogao bi dati nakon 2030" [The second block of NPP Krško could provide the first megawatts after 2030.]. Točka na I (in Croatian). 30 November 2022. Retrieved 14 April 2023.
  116. "South Korean APR-1400 starts Opened : New Nuclear - World Nuclear News".
  117. "Unit 2 at South Korean nuclear reactor enters commercial operation". 9 April 2024.
  118. ^ "South Korea breaks ground for two new reactors". Retrieved 30 October 2024.
  119. "Second APR-1400 unit starts Opened". world-nuclear-news.org. Retrieved 3 September 2019.
  120. ^ "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden". The Swedish Radiation Safety Authority (in Swedish). 31 March 2007. Retrieved 12 January 2023.
  121. ^ "IAEA Sweden reactors". IAEA. 11 January 2023. Retrieved 12 January 2023.
  122. ^ "Forsmarks reaktorer i siffror" (PDF). Vattenfall (in Swedish). April 2016. Retrieved 12 January 2023.
  123. "MILSTOLPAR I VÅR HISTORIA". Westinghouse (in Swedish). Retrieved 12 January 2023.
  124. "Ringhals 1 inne på slutspurten". SVT (in Swedish). 26 October 2020. Retrieved 29 December 2020.
  125. admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 June 2013 at the Wayback Machine, 25 May 2011
  126. "Early shutdown for Taiwanese reactor : Corporate". World Nuclear News. 1 July 2021. Retrieved 29 April 2022.
  127. ^ "封存核四 馬英九:為下一代保留選擇權". 自由時報電子報 (in Chinese (Taiwan)). 27 April 2014. Retrieved 8 November 2024. 馬英九總統、閣揆江宜樺下午邀集黨籍縣市首長舉行會議,會後國民黨發言人范姜泰基轉述,今日會議達成兩點共識,分別是「核四一號機不施工、只安檢,安檢後封存;核四二號機全部停工」,以及「行政院承諾儘速召開全國能源會議,以確保未來供電無虞」。
  128. "Major components in place at Akkuyu 1 : New Nuclear". World Nuclear News. 4 March 2022. Retrieved 29 April 2022.
  129. "Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News".
  130. "Japan looks to cancel Turkish project – Nuclear Engineering International". 6 December 2018.
  131. "Turkey, Japan scrap partnership in Sinop nuclear plant in Turkey's north – Turkey News". 20 January 2020.
  132. "В Україні збудують нову атомну станцію: названо місто будівництва". GSMinfo. 22 September 2022. Retrieved 9 December 2023.
  133. "На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків". xaec.org.ua. 12 February 2021. Archived from the original on 24 February 2021. Retrieved 7 November 2022.
  134. "Ukraine begins construction of new units at Khmelnitsky NPP". 17 April 2024.
  135. ^ "Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO".
  136. "UAE's first nuclear power plant begins Openeds". Reuters. 6 April 2021. Retrieved 6 April 2021.
  137. "Barakah / Unit 2 Begins Opened at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency". 23 February 2022.
  138. "Third Barakah unit begins Opened : New Nuclear - World Nuclear News".
  139. "UAE Celebrates Historic Milestone as Unit 4 of the Barakah Plant Commences Commercial Operation: Delivering Full-fleet Operations". 5 September 2024.
  140. ^ Ambrose, Jillian (4 December 2024). "Four of UK's oldest nuclear plants to run for even longer as Hinkley Point delayed". Retrieved 4 December 2024.
  141. "Hinkley Point B enters retirement : Corporate – World Nuclear News". world-nuclear-news.org. Retrieved 2 August 2022.
  142. "PRIS – Reactor Details". pris.iaea.org. Retrieved 25 July 2022.
  143. "Hunterston B nuclear power station retires after 46 years in service". The Guardian. 7 January 2022.
  144. "The Sizewell C project – National Infrastructure Planning". infrastructure.planninginspectorate.gov.uk. Retrieved 12 April 2022.
  145. "PRIS – Reactor Details". pris.iaea.org. Retrieved 24 January 2019.
  146. "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  147. "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  148. "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  149. "Brunswick-1". IAEA. Retrieved 14 April 2013.
  150. "Brunswick-2". IAEA. Retrieved 14 April 2013.
  151. "Scaled down SMR pilot project remains on course : New Nuclear". World Nuclear News. 23 July 2021. Retrieved 29 April 2022.
  152. "Idaho SMR project terminated". World Nuclear News. 9 November 2023. Retrieved 9 November 2023.
  153. ^ "TVA Prepares to Write Final Nuclear Chapters". American Nuclear Society. 17 April 2015. Archived from the original on 29 July 2023. Retrieved 5 October 2023.
  154. ^ Tennessee Valley Authority. "Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park" (PDF). Archived from the original (PDF) on 5 January 2009. Retrieved 5 October 2023.
  155. ^ "Entergy's Indian Point Unit 2 to Shut Down Permanently". Indian Point Energy Center. 29 April 2020. Archived from the original on 3 August 2020. Retrieved 30 April 2020.
  156. "PRIS – Reactor Details".
  157. StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 December 2014 at the Wayback Machine, 29 Dec 2014
  158. "Vogtle Unit 3 goes into operation". Cision. 31 July 2023. Retrieved 31 July 2023.
  159. "Commercial operation marks completion of Vogtle expansion : New Nuclear - World Nuclear News".

External links

Lists of power stations
By region
Africa
Asia
Europe
North America
Oceania
South America
By type
Non-renewable
Renewable
Types of nuclear fission reactor
Moderator
Light water
Heavy water
by coolant
D2O
H2O
Organic
CO2
Graphite
by coolant
Water
H2O
Gas
CO2
He
Molten-salt
Fluorides
None
(fast-neutron)
Generation IV
Others
Portals: Categories: