This article is about commercial nuclear fission reactors. For other nuclear reactor lists, see List of nuclear reactors. This is a dynamic list and may never be able to satisfy particular standards for completeness. You can help by adding missing items with reliable sources.
This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of July 2024, there are 415 operable power reactors in the world, with a combined electrical capacity of 373.7 GW. Additionally, there are 61 reactors under construction and 92 reactors planned, with a combined capacity of 68 GW and 90 GW, respectively, while 343 more reactors are proposed. For non-power reactors, see List of nuclear research reactors. For fuel plants see List of nuclear reprocessing plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).
In the following tables, the capacity (expressed in megawatt, MW) refers to the net capacity, or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.
Argentina
Main article: Nuclear power in ArgentinaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Atucha | 1 | PHWR | Siemens-KWU | Operation suspended (under maintenance) |
362 | 1 Jun 1968 | 24 Jun 1974 | |
2 | PHWR | Siemens-KWU | Operational | 745 | 14 Jul 1981 | 27 Jun 2014 | ||
3 | PWR | Hualong One | Planned | 1200 | ||||
Embalse | 1 | PHWR | CANDU-6 | Operational | 683 | 1 Apr 1974 | 20 Jan 1984 | (2049) |
CAREM | 1 | PWR | CAREM25 | Under construction | 25 | 8 Feb 2014 |
Armenia
Main article: Nuclear power in ArmeniaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Metsamor | 1 | PWR | VVER-440/V-270 | Shut down | 376 | 1 Jul 1969 | 6 Oct 1977 | 25 Feb 1989 |
2 | PWR | VVER-440/V-270 | Operational | 375 | 1 Jul 1975 | 3 May 1980 | (2026) |
Austria
Main article: Nuclear power in AustriaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Zwentendorf | 1 | BWR | BWR-69 (KWU) | Finished; never entered service | 878 | Apr 1972 | 5 Nov 1978 |
Bangladesh
Main article: Nuclear power in BangladeshPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Rooppur | 1 | PWR | VVER-1200/V-523 | Under construction | 1080 | 30 Nov 2017 | (2025) | |
2 | PWR | VVER-1200/V-523 | Under construction | 1080 | 14 Jul 2018 | (2026) |
Belarus
Main article: Nuclear power in BelarusPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Ostrovets | 1 | PWR | VVER-1200/V-491 | Operational | 1109 | 6 Nov 2013 | 10 Jun 2021 | |
2 | PWR | VVER-1200/V-491 | Operational | 1109 | 24 Apr 2014 | 1 Nov 2023 | ||
Minsk | 1 | PWR | VVER-1000 | Unfinished | 963 | 1983 | 1987 | |
2 | PWR | VVER-1000 | Unfinished | 963 | 1983 | 1987 |
Belgium
Main article: Nuclear power in BelgiumPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
SCK•CEN | 1 | PWR | Westinghouse (WH) BR-3 | Decommissioned | 10 | 1 Nov 1957 | 10 Oct 1962 | 30 Jun 1987 |
Doel | 1 | PWR | WH 2 loops | Operational | 445 | 1 Jul 1969 | 15 Feb 1975 | (15 feb. 2025) |
2 | PWR | WH 2 loops | Operational | 445 | 1 Sep 1971 | 1 Dec 1975 | (1 dec. 2025) | |
3 | PWR | Framatome 3 loops | Shut down | 1006 | 1 Jan 1975 | 1 Oct 1982 | 23 Sep 2022 | |
4 | PWR | Belgian firms plus WH 3 loops | Operational | 1039 | 1 Dec 1978 | 1 Jul 1985 | (1 jul. 2025)
planned prolongation of operations until 2035 | |
Tihange | 1 | PWR | Framatome 3 loops | Operational | 962 | 1 Jun 1970 | 1 Oct 1975 | (1 oct. 2025) |
2 | PWR | Framatome 3 loops | Shut down | 1008 | 1 Apr 1976 | 1 Jun 1983 | 31 Jan 2023 | |
3 | PWR | Belgian firms plus WH 3 loops | Operational | 1046 | 1 Nov 1978 | 1 Sep 1985 | (1 sept. 2025)
planned prolongation of operations until 2035 |
Brazil
Main article: Nuclear power in BrazilPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Angra | 1 | PWR | WH 2 loops | Operational | 609 | 1 May 1971 | 1 Jan 1985 | |
2 | PWR | Pre-Konvoi | Operational | 1275 | 1 Jan 1976 | 1 Feb 2001 | ||
3 | PWR | Pre-Konvoi | Under construction | 1245 | 1 Jun 2010 | (2028) |
Bulgaria
Main article: Nuclear power in BulgariaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Kozloduy | 1 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Apr 1970 | 28 Oct 1974 | 31 Dec 2002 |
2 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Apr 1970 | 10 Nov 1975 | 31 Dec 2002 | |
3 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Oct 1973 | 20 Jan 1981 | 31 Dec 2006 | |
4 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Oct 1973 | 20 Jun 1982 | 31 Dec 2006 | |
5 | PWR | VVER-1000/V-320 | Operational | 1003 | 9 Jul 1980 | 23 Dec 1988 | ||
6 | PWR | VVER-1000/V-320 | Operational | 1003 | 1 Apr 1982 | 30 Dec 1993 | ||
7 | PWR | AP1000 | Planned | 1150 | (2033) | |||
8 | PWR | AP1000 | Planned | 1150 | ||||
Belene | 1 | PWR | VVER-1000/V-320 VVER-1000/V-446B |
Unfinished | 953 1011 |
1987 2008 |
||
2 | PWR | VVER-1000/V-320 VVER-1000/V-446B |
Unfinished | 953 1011 |
1987 2008 |
Canada
Main article: Nuclear power in CanadaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Pickering | 1 | PHWR | CANDU 500A | Shut down | 515 | Jun 1966 | 29 Jul 1971 | 1 Oct 2024 |
2 | PHWR | CANDU 500A | Shut down | 515 | Sep 1966 | 30 Dec 1971 | 31 Dec 1997 | |
3 | PHWR | CANDU 500A | Shut down | 515 | Dec 1967 | 1 Jun 1972 | 29 Dec 1997 | |
4 | PHWR | CANDU 500A | Operational | 515 | May 1968 | 17 Jun 1973 | (2024) | |
5 | PHWR | CANDU 500B | Operational | 516 | Nov 1974 | 10 May 1983 | (2026) | |
6 | PHWR | CANDU 500B | Operational | 516 | Oct 1975 | 1 Feb 1984 | (2026) | |
7 | PHWR | CANDU 500B | Operational | 516 | Mar 1976 | 1 Jan 1985 | (2026) | |
8 | PHWR | CANDU 500B | Operational | 516 | Sep 1976 | 28 Feb 1986 | (2026) | |
Darlington | 1 | PHWR | CANDU 850 | Operational | 878 | Apr 1982 | 14 Nov 1992 | (2052) |
2 | PHWR | CANDU 850 | Operational | 878 | Sep 1981 | 9 Oct 1990 | (2050) | |
3 | PHWR | CANDU 850 | Operational | 878 | Sep 1984 | 14 Feb 1993 | (2053) | |
4 | PHWR | CANDU 850 | Operational | 878 | Jul 1985 | 14 Jun 1993 | (2053) | |
5 | BWR | BWRX-300 | Planned | 300 | (2023) | (2028) | ||
6 | BWR | BWRX-300 | Planned | 300 | (2023) | (2028) | ||
7 | BWR | BWRX-300 | Planned | 300 | (2023) | (2029) | ||
8 | BWR | BWRX-300 | Planned | 300 | (2023) | (2029) | ||
Bruce | 1 | PHWR | CANDU 791 | Operational | 823 | Jun 1971 | 1 Sep 1977 | (2043) |
2 | PHWR | CANDU 791 | Operational | 823 | Dec 1970 | 1 Sep 1977 | (2043) | |
3 | PHWR | CANDU 750A | Operational | 817 | Jul 1972 | 1 Feb 1978 | (2064) | |
4 | PHWR | CANDU 750A | Operational | 817 | Sep 1972 | 18 Jan 1979 | (2064) | |
5 | PHWR | CANDU 750B | Operational | 817 | Jun 1978 | 1 Mar 1985 | (2064) | |
6 | PHWR | CANDU 750B | Operational | 880 | Jan 1978 | 15 Sep 1984 | (2064) | |
7 | PHWR | CANDU 750B | Operational | 817 | May 1979 | 10 Apr 1986 | (2064) | |
8 | PHWR | CANDU 750B | Operational | 817 | Aug 1979 | 22 May 1987 | (2064) | |
NPD | 1 | PHWR | CANDU | Shut down | 19 | Jan 1958 | 4 Jun 1962 | 1 Aug 1987 |
Douglas Point | 1 | PHWR | CANDU 200 | Shut down | 200 | Feb 1960 | 26 Sep 1968 | 4 May 1984 |
Gentilly | 1 | BWR | CANDU BLWR 250 | Shut down | 250 | Sep 1966 | 1 May 1972 | 1 June 1977 |
2 | PHWR | CANDU-6 | Shut down | 635 | Apr 1974 | 1 Oct 1983 | 28 Dec 2012 | |
Point Lepreau | 1 | PHWR | CANDU-6 | Operational | 635 | May 1975 | 1 Feb 1983 | (2041) |
China
Main article: Nuclear power in ChinaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Bailong | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
Changjiang | I-1 | PWR | CNP-600 | Operational | 601 | 25 Apr 2010 | 25 Dec 2015 | |
I-2 | PWR | CNP-600 | Operational | 601 | 21 Nov 2010 | 20 Jun 2016 | ||
I-3 | PWR | Hualong One | Under construction | 1200 | 31 Mar 2021 | |||
I-4 | PWR | Hualong One | Under construction | 1200 | 31 Mar 2021 | |||
II-1 | PWR | ACP-100 | Under construction | 100 | 13 Jul 2021 | |||
II-2 | PWR | ACP-100 | Planned | 100 | ||||
Daya Bay | 1 | PWR | M-310 | Operational | 944 | 7 Aug 1987 | 1 Feb 1994 | |
2 | PWR | M-310 | Operational | 944 | 7 Apr 1988 | 6 May 1994 | ||
Fangchenggang | 1 | PWR | CPR-1000 | Operational | 1000 | 30 Jul 2010 | 25 Oct 2015 | |
2 | PWR | CPR-1000 | Operational | 1000 | 23 Dec 2010 | 15 Jul 2016 | ||
3 | PWR | Hualong One | Operational | 1000 | 24 Dec 2015 | 25 Mar 2023 | ||
4 | PWR | Hualong One | Operational | 1000 | 24 Dec 2016 | 25 May 2024 | ||
5 | PWR | Hualong One | Planned | 1117 | ||||
6 | PWR | Hualong One | Planned | 1117 | ||||
Fangjiashan | 1 | PWR | CPR-1000 | Operational | 1012 | 26 Dec 2008 | 15 Dec 2014 | |
2 | PWR | CPR-1000 | Operational | 1012 | 17 Jul 2009 | 12 Feb 2015 | ||
Fuqing | 1 | PWR | CPR-1000 | Operational | 1000 | 21 Nov 2008 | 19 Nov 2014 | |
2 | PWR | CPR-1000 | Operational | 1000 | 17 Jun 2009 | 15 Oct 2015 | ||
3 | PWR | CPR-1000 | Operational | 1000 | 31 Dec 2010 | 7 Sep 2016 | ||
4 | PWR | CPR-1000 | Operational | 1000 | 17 Nov 2012 | 31 Jul 2017 | ||
5 | PWR | Hualong One | Operational | 1000 | 15 Apr 2015 | 30 Jan 2021 | ||
6 | PWR | Hualong One | Operational | 1000 | 22 Dec 2015 | 25 Mar 2022 | ||
Haiyang | 1 | PWR | AP1000 | Operational | 1170 | 24 Sep 2009 | 23 Oct 2018 | |
2 | PWR | AP1000 | Operational | 1170 | 20 Jun 2010 | 9 Jan 2019 | ||
3 | PWR | CAP-1000 | Under construction | 1100 | 7 Jul 2022 | |||
4 | PWR | CAP-1000 | Under construction | 1100 | 22 Apr 2023 | |||
Haixing | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
Hongyanhe | 1 | PWR | CPR-1000 | Operational | 1061 | 18 Aug 2007 | 6 Jun 2013 | |
2 | PWR | CPR-1000 | Operational | 1061 | 28 Mar 2008 | 13 May 2014 | ||
3 | PWR | CPR-1000 | Operational | 1061 | 7 Mar 2009 | 23 Mar 2015 | ||
4 | PWR | CPR-1000 | Operational | 1061 | 15 Aug 2009 | 1 Apr 2016 | ||
5 | PWR | ACPR-1000 | Operational | 1061 | 29 Mar 2015 | 2 Aug 2021 | ||
6 | PWR | ACPR-1000 | Operational | 1061 | 24 Jul 2015 | 23 Jun 2022 | ||
Jinqimen | 1 | PWR | Hualong One | Planned | 1126 | |||
2 | PWR | Hualong One | Planned | 1126 | ||||
Lianjiang | 1 | PWR | CAP-1000 | Under construction | 1100 | 27 Sep 2023 | ||
2 | PWR | CAP-1000 | Under construction | 1100 | 26 April 2024 | |||
Ling Ao | 1 | PWR | M-310 | Operational | 950 | 15 May 1997 | 28 May 2002 | |
2 | PWR | M-310 | Operational | 950 | 28 Nov 1997 | 8 Jan 2003 | ||
3 | PWR | CPR-1000 | Operational | 1007 | 15 Dec 2005 | 15 Sep 2010 | ||
4 | PWR | CPR-1000 | Operational | 1007 | 15 Jun 2006 | 7 Aug 2011 | ||
Lufeng | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
3 | PWR | CAP-1000 | Planned | 1100 | ||||
4 | PWR | CAP-1000 | Planned | 1100 | ||||
5 | PWR | Hualong One | Under construction | 1000 | 8 Sep 2022 | |||
6 | PWR | Hualong One | Under construction | 1000 | 26 Aug 2023 | |||
Ningde | 1 | PWR | CPR-1000 | Operational | 1018 | 18 Feb 2008 | 15 Apr 2013 | |
2 | PWR | CPR-1000 | Operational | 1018 | 12 Nov 2008 | 4 May 2014 | ||
3 | PWR | CPR-1000 | Operational | 1018 | 8 Jan 2010 | 10 Jun 2015 | ||
4 | PWR | CPR-1000 | Operational | 1018 | 29 Sep 2010 | 29 Mar 2016 | ||
5 | PWR | Hualong One | Under construction | 1080 | 28 Jul 2024 | |||
6 | PWR | Hualong One | Planned | 1080 | ||||
Pengze | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
Qinshan | I-1 | PWR | CNP-300 | Operational | 308 | 20 Mar 1985 | 1 Apr 1994 | |
II-1 | PWR | CNP-600 | Operational | 610 | 2 Jun 1996 | 15 Apr 2002 | ||
II-2 | PWR | CNP-600 | Operational | 610 | 1 Apr 1997 | 3 May 2004 | ||
II-3 | PWR | CNP-600 | Operational | 619 | 28 Apr 2006 | 5 Oct 2010 | ||
II-4 | PWR | CNP-600 | Operational | 619 | 28 Jan 2007 | 30 Dec 2011 | ||
III-1 | PHWR | CANDU-6 | Operational | 677 | 8 Jun 1998 | 31 Dec 2002 | ||
III-2 | PHWR | CANDU-6 | Operational | 677 | 25 Sep 1998 | 24 Jul 2003 | ||
San'ao | 1 | PWR | Hualong One | Under construction | 1117 | 31 Dec 2020 | ||
2 | PWR | Hualong One | Under construction | 1000 | 30 Dec 2021 | |||
Sanmen | 1 | PWR | AP1000 | Operational | 1157 | 19 Apr 2009 | 21 Sep 2018 | |
2 | PWR | AP1000 | Operational | 1157 | 15 Dec 2009 | 5 Nov 2018 | ||
3 | PWR | CAP-1000 | Under construction | 1163 | 28 Jun 2022 | |||
4 | PWR | CAP-1000 | Under construction | 1100 | 22 Mar 2023 | |||
Shidaowan | I-1 | HTGR | HTR-PM | Operational | 200 | 9 Dec 2012 | 6 Dec 2023 | |
II-1 | PWR | CAP-1400 | Under commissioning | 1500 | 19 Jun 2019 | |||
II-2 | PWR | CAP-1400 | Under construction | 1500 | 4 Apr 2020 | |||
Taipingling | 1 | PWR | Hualong One | Under construction | 1116 | 26 Dec 2019 | ||
2 | PWR | Hualong One | Under construction | 1116 | 15 Oct 2020 | |||
3 | PWR | Hualong One | Planned | 1116 | ||||
4 | PWR | Hualong One | Planned | 1116 | ||||
Taishan | 1 | PWR | EPR | Operational | 1660 | 18 Nov 2009 | 14 Dec 2018 | |
2 | PWR | EPR | Operational | 1660 | 15 Apr 2010 | 7 Sep 2019 | ||
3 | PWR | EPR | Planned | 1660 | ||||
4 | PWR | EPR | Planned | 1660 | ||||
Taohuajiang | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
3 | PWR | CAP-1000 | Planned | 1100 | ||||
4 | PWR | CAP-1000 | Planned | 1100 | ||||
Tianwan | 1 | PWR | VVER-1000/V-428 | Operational | 990 | 20 Oct 1999 | 17 May 2007 | |
2 | PWR | VVER-1000/V-428 | Operational | 990 | 20 Sep 2000 | 16 Aug 2007 | ||
3 | PWR | VVER-1000/V-428M | Operational | 1045 | 27 Dec 2012 | 14 Feb 2018 | ||
4 | PWR | VVER-1000/V-428M | Operational | 1045 | 27 Sep 2013 | 22 Dec 2018 | ||
5 | PWR | ACPR-1000 | Operational | 1000 | 27 Dec 2015 | 8 Sep 2020 | ||
6 | PWR | ACPR-1000 | Operational | 1000 | 7 Sep 2016 | 3 Jun 2021 | ||
7 | PWR | VVER-1200/V-491 | Under construction | 1150 | 19 May 2021 | (2027–2028) | ||
8 | PWR | VVER-1200/V-491 | Under construction | 1150 | 25 Feb 2022 | (2027–2028) | ||
Xianning | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
Xiapu | I-1 | SFR | CFR-600 | Under construction | 642 | 29 Dec 2017 | (2024) | |
I-2 | SFR | CFR-600 | Under construction | 642 | 27 Dec 2020 | |||
II-1 | PWR | CAP-1000 | Planned | 1100 | ||||
II-2 | PWR | CAP-1000 | Planned | 1100 | ||||
II-3 | PWR | CAP-1000 | Planned | 1100 | ||||
II-4 | PWR | CAP-1000 | Planned | 1100 | ||||
Xudabao | 1 | PWR | CAP-1000 | Under construction | 1250 | 15 Nov 2023 | ||
2 | PWR | CAP-1000 | Under construction | 1100 | 17 Jul 2024 | |||
3 | PWR | VVER-1200/V-491 | Under construction | 1150 | 28 Jul 2021 | (2027) | ||
4 | PWR | VVER-1200/V-491 | Under construction | 1150 | 19 May 2022 | (2028) | ||
Xuwei | 1 | PWR | Hualong One | Planned | 1116 | |||
2 | PWR | Hualong One | Planned | 1116 | ||||
3 | HTGR | HTR-PM600S | Planned | 600 | ||||
Yangjiang | 1 | PWR | CPR-1000 | Operational | 1000 | 16 Dec 2008 | 25 Mar 2014 | |
2 | PWR | CPR-1000 | Operational | 1000 | 4 Jun 2009 | 8 Jun 2015 | ||
3 | PWR | CPR-1000+ | Operational | 1000 | 15 Nov 2010 | 1 Jan 2016 | ||
4 | PWR | CPR-1000+ | Operational | 1000 | 17 Nov 2012 | 15 Mar 2017 | ||
5 | PWR | ACPR-1000 | Operational | 1000 | 18 Sep 2013 | 12 Jul 2018 | ||
6 | PWR | ACPR-1000 | Operational | 1000 | 23 Dec 2013 | 24 Jul 2019 | ||
Zhangzhou | 1 | PWR | Hualong One | Under commissioning | 1126 | 16 Oct 2019 | ||
2 | PWR | Hualong One | Under construction | 1126 | 4 Sep 2020 | |||
3 | PWR | Hualong One | Under construction | 1126 | 22 Feb 2024 | |||
4 | PWR | Hualong One | Under construction | 1000 | 27 Sep 2024 | |||
Zhaoyuan | 1 | PWR | Hualong One | Planned | 1116 | |||
2 | PWR | Hualong One | Planned | 1116 |
Cuba
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Juragua | 1 | PWR | VVER-440/V-318 | Unfinished | 440 | 1983 | 5 Sep 1992 | |
2 | PWR | VVER-440/V-318 | Unfinished | 440 | 1985 | 5 Sep 1992 |
Czech Republic
Main article: Nuclear power in the Czech RepublicPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Dukovany | 1 | PWR | VVER-440/V-213 | Operational | 468 | 1 Jan 1979 | 3 May 1985 | |
2 | PWR | VVER-440/V-213 | Operational | 471 | 1 Jan 1979 | 21 Mar 1986 | ||
3 | PWR | VVER-440/V-213 | Operational | 468 | 1 Mar 1979 | 20 Dec 1986 | ||
4 | PWR | VVER-440/V-213 | Operational | 471 | 1 Mar 1979 | 19 Jul 1987 | ||
5 | PWR | TBD | Planned | 1200 | ||||
6 | PWR | TBD | Planned | 1200 | ||||
Temelín | 1 | PWR | VVER-1000/V-320 | Operational | 1003 | 1 Feb 1987 | 10 Jun 2002 | |
2 | PWR | VVER-1000/V-320 | Operational | 1003 | 1 Feb 1987 | 18 Apr 2003 | ||
3 | PWR | TBD | Planned | 1200 | ||||
4 | PWR | TBD | Planned | 1200 |
Egypt
Main article: Nuclear program of EgyptPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
El Dabaa | 1 | PWR | VVER-1200/V-529 | Under construction | 1200 | 20 Jul 2022 | (2028) | |
2 | PWR | VVER-1200/V-529 | Under construction | 1200 | 19 Nov 2022 | |||
3 | PWR | VVER-1200/V-529 | Under construction | 1200 | 3 May 2023 | |||
4 | PWR | VVER-1200/V-529 | Under construction | 1200 | 23 Jan 2024 |
Finland
Main article: Nuclear power in FinlandPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Hanhikivi | 1 | PWR | VVER-1200/V-491 | Cancelled | 1200 | (2023) | (2029) | 2 May 2022 |
Loviisa | 1 | PWR | VVER-440/V-213 | Operational | 507 | 1 May 1971 | 9 May 1977 | |
2 | PWR | VVER-440/V-213 | Operational | 507 | 1 Aug 1972 | 5 Jan 1981 | ||
Olkiluoto | 1 | BWR | ASEA-III, BWR-2500 | Operational | 890 | 1 Feb 1974 | 10 Oct 1979 | |
2 | BWR | ASEA-III, BWR-2500 | Operational | 890 | 1 Nov 1975 | 10 Jul 1982 | ||
3 | PWR | EPR | Operational | 1600 | 12 Aug 2005 | 16 Apr 2023 |
France
Main article: Nuclear power in FrancePlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Belleville | 1 | PWR | P4 REP 1300 | Operational | 1310 | 1 May 1980 | 1 Jun 1988 | |
2 | PWR | P4 REP 1300 | Operational | 1310 | 1 Aug 1980 | 1 Jan 1989 | ||
Blayais | 1 | PWR | CP1 | Operational | 910 | 1 Jan 1977 | 1 Dec 1981 | |
2 | PWR | CP1 | Operational | 910 | 1 Jan 1977 | 1 Feb 1983 | ||
3 | PWR | CP1 | Operational | 910 | 1 Apr 1978 | 14 Nov 1983 | ||
4 | PWR | CP1 | Operational | 910 | 1 Apr 1978 | 1 Oct 1983 | ||
Brennilis | 1 | HWGCR | Shut down/in decommissioning | 70 | 1 Jul 1962 | 1 Jun 1968 | 31 Jul 1985 | |
Bugey | 1 | GCR | UNGG | Shut down | 540 | 1 Dec 1965 | 1 Jul 1972 | 27 May 1994 |
2 | PWR | CP0 | Operational | 910 | 1 Nov 1972 | 1 Mar 1979 | ||
3 | PWR | CP0 | Operational | 910 | 1 Sep 1973 | 1 Mar 1979 | ||
4 | PWR | CP0 | Operational | 880 | 1 Jun 1974 | 1 Jul 1979 | ||
5 | PWR | CP0 | Operational | 880 | 1 Jul 1974 | 3 Jan 1980 | ||
6 | PWR | EPR2 | Planned | 1670 | ||||
7 | PWR | EPR2 | Planned | 1670 | ||||
Cattenom | 1 | PWR | P4 REP 1300 | Operational | 1300 | 29 Oct 1979 | 1 Apr 1987 | |
2 | PWR | P4 REP 1300 | Operational | 1300 | 28 Jul 1980 | 1 Feb 1988 | ||
3 | PWR | P4 REP 1300 | Operational | 1300 | 15 Jun 1982 | 1 Feb 1991 | ||
4 | PWR | P4 REP 1300 | Operational | 1300 | 28 Sep 1983 | 1 Jan 1992 | ||
Chinon | A-1 | GCR | UNGG | Shut down | 70 | 1 Feb 1957 | 1 Feb 1964 | 16 Apr 1973 |
A-2 | GCR | UNGG | Shut down | 180 | 1 Aug 1959 | 24 Feb 1965 | 14 Jun 1985 | |
A-3 | GCR | UNGG | Shut down | 360 | 1 Mar 1961 | 4 Aug 1966 | 15 Jun 1990 | |
B-1 | PWR | CP2 | Operational | 905 | 1 Mar 1977 | 1 Feb 1984 | ||
B-2 | PWR | CP2 | Operational | 905 | 1 Mar 1977 | 1 Aug 1984 | ||
B-3 | PWR | CP2 | Operational | 905 | 1 Oct 1980 | 4 Mar 1987 | ||
B-4 | PWR | CP2 | Operational | 905 | 1 Feb 1981 | 1 Apr 1988 | ||
Chooz | A-1 | PWR | CHOOZ-A | Decommissioned | 305 | 1 Jan 1962 | 15 Apr 1967 | 30 Oct 1991 |
B-1 | PWR | N4 REP 1450 | Operational | 1500 | 1 Jan 1984 | 15 May 2000 | ||
B-2 | PWR | N4 REP 1450 | Operational | 1500 | 1 Jan 1984 | 15 May 2000 | ||
Civaux | 1 | PWR | N4 REP 1450 | Operational | 1495 | 15 Oct 1988 | 29 Jan 2002 | |
2 | PWR | N4 REP 1450 | Operational | 1495 | 1 Apr 1991 | 23 Apr 2002 | ||
Cruas | 1 | PWR | CP2 | Operational | 915 | 1 Aug 1978 | 2 Apr 1984 | |
2 | PWR | CP2 | Operational | 915 | 15 Nov 1978 | 1 Apr 1985 | ||
3 | PWR | CP2 | Operational | 915 | 15 Apr 1979 | 10 Sep 1984 | ||
4 | PWR | CP2 | Operational | 915 | 1 Oct 1979 | 11 Feb 1985 | ||
Dampierre | 1 | PWR | CP1 | Operational | 890 | 1 Feb 1975 | 10 Sep 1980 | |
2 | PWR | CP1 | Operational | 890 | 1 Apr 1975 | 16 Feb 1981 | ||
3 | PWR | CP1 | Operational | 890 | 1 Sep 1975 | 27 May 1981 | ||
4 | PWR | CP1 | Operational | 890 | 1 Dec 1975 | 20 Nov 1981 | ||
Fessenheim | 1 | PWR | CP0 | Shut down | 880 | 1 Sep 1971 | 1 Jan 1978 | 22 Feb 2020 |
2 | PWR | CP0 | Shut down | 880 | 1 Feb 1972 | 1 Apr 1978 | 29 Jun 2020 | |
Flamanville | 1 | PWR | P4 REP 1300 | Operational | 1330 | 1 Dec 1979 | 1 Dec 1986 | |
2 | PWR | P4 REP 1300 | Operational | 1330 | 1 May 1980 | 9 Mar 1987 | ||
3 | PWR | EPR | Under commissioning | 1600 | 3 Dec 2007 | (2024) | ||
Golfech | 1 | PWR | P4 REP 1300 | Operational | 1310 | 17 Nov 1982 | 1 Feb 1991 | |
2 | PWR | P4 REP 1300 | Operational | 1310 | 1 Oct 1984 | 4 Mar 1994 | ||
Gravelines | 1 | PWR | CP1 | Operational | 910 | 1 Feb 1975 | 25 Nov 1980 | |
2 | PWR | CP1 | Operational | 910 | 1 Mar 1975 | 1 Dec 1980 | ||
3 | PWR | CP1 | Operational | 910 | 1 Dec 1975 | 1 Jun 1981 | ||
4 | PWR | CP1 | Operational | 910 | 1 Apr 1976 | 1 Oct 1981 | ||
5 | PWR | CP1 | Operational | 910 | 1 Oct 1979 | 15 Jan 1985 | ||
6 | PWR | CP1 | Operational | 910 | 1 Oct 1979 | 25 Oct 1985 | ||
7 | PWR | EPR2 | Planned | 1670 | ||||
8 | PWR | EPR2 | Planned | 1670 | ||||
Nogent | 1 | PWR | P4 REP 1300 | Operational | 1310 | 26 May 1981 | 24 Feb 1988 | |
2 | PWR | P4 REP 1300 | Operational | 1310 | 1 Jan 1982 | 1 May 1989 | ||
Paluel | 1 | PWR | P4 REP 1300 | Operational | 1330 | 15 Aug 1977 | 1 Dec 1985 | |
2 | PWR | P4 REP 1300 | Operational | 1330 | 1 Jan 1978 | 1 Dec 1985 | ||
3 | PWR | P4 REP 1300 | Operational | 1330 | 1 Feb 1979 | 1 Feb 1986 | ||
4 | PWR | P4 REP 1300 | Operational | 1330 | 1 Feb 1980 | 1 Jun 1986 | ||
Penly | 1 | PWR | P4 REP 1300 | Operational | 1330 | 1 Sep 1982 | 1 Dec 1990 | |
2 | PWR | P4 REP 1300 | Operational | 1330 | 1 Aug 1984 | 1 Nov 1992 | ||
3 | PWR | EPR2 | Planned | 1670 | (2024) | |||
4 | PWR | EPR2 | Planned | 1670 | (2024) | |||
Phénix | 1 | FBR | PH-250 | Shut down | 130 | 1 Nov 1968 | 14 Jul 1974 | 1 Feb 2010 |
Saint-Alban | 1 | PWR | P4 REP 1300 | Operational | 1335 | 29 Jan 1979 | 1 May 1986 | |
2 | PWR | P4 REP 1300 | Operational | 1335 | 31 Jul 1979 | 1 Mar 1987 | ||
Saint-Laurent | A-1 | GCR | UNGG | Shut down | 390 | 1 Oct 1963 | 1 Jun 1969 | 18 Apr 1990 |
A-2 | GCR | UNGG | Shut down | 465 | 1 Jan 1966 | 1 Nov 1971 | 27 May 1992 | |
B-1 | PWR | CP2 | Operational | 915 | 1 May 1976 | 1 Aug 1983 | ||
B-2 | PWR | CP2 | Operational | 915 | 1 Jul 1976 | 1 Aug 1983 | ||
Superphénix | 1 | FBR | Na-1200 | Shut down/in decommissioning | 1200 | 13 Dec 1976 | 1 Dec 1986 | 31 Dec 1998 |
Tricastin | 1 | PWR | CP1 | Operational | 915 | 1 Nov 1974 | 1 Dec 1980 | |
2 | PWR | CP1 | Operational | 915 | 1 Dec 1974 | 1 Dec 1980 | ||
3 | PWR | CP1 | Operational | 915 | 1 Apr 1975 | 11 May 1981 | ||
4 | PWR | CP1 | Operational | 915 | 1 May 1975 | 1 Nov 1981 |
Germany
Main article: Nuclear power in GermanyPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
AVR | 1 | HTGR | PBR Prototype | Shut down | 13 | 1 Aug 1961 | 19 May 1969 | 31 Dec 1988 |
Biblis | 1 | PWR | Siemens-KWU | Shut down/in decommissioning | 1167 | 1 Jan 1970 | 26 Feb 1975 | 6 Aug 2011 |
2 | PWR | KWU | Shut down/in decommissioning | 1240 | 1 Feb 1972 | 31 Jan 1977 | 6 Aug 2011 | |
Brokdorf | 1 | PWR | KWU | Shut down | 1410 | 1 Jan 1976 | 22 Dec 1986 | 31 Dec 2021 |
Brunsbüttel | 1 | BWR | BWR-69 | Shut down | 771 | 15 Apr 1970 | 9 Feb 1977 | 6 Aug 2011 |
Emsland | 1 | PWR | Konvoi [de] (KWU) | Shut down | 1329 | 10 Aug 1982 | 20 Jun 1988 | 15 Apr 2023 |
Grafenrheinfeld | 1 | PWR | KWU | Shut down | 1275 | 1 Jan 1975 | 17 Jun 1982 | 27 Jun 2015 |
Greifswald | 1 | PWR | VVER-440/V-230 | Shut down/in decommissioning | 408 | 1 Mar 1970 | 12 Jul 1974 | 14 Feb 1990 |
2 | PWR | VVER-440/V-230 | Shut down/in decommissioning | 408 | 1 Mar 1970 | 16 Apr 1975 | 14 Feb 1990 | |
3 | PWR | VVER-440/V-230 | Shut down/in decommissioning | 408 | 1 Apr 1972 | 1 May 1978 | 28 Feb 1990 | |
4 | PWR | VVER-440/V-230 | Shut down/in decommissioning | 408 | 1 Apr 1972 | 1 Nov 1979 | 22 Jul 1990 | |
5 | PWR | VVER-440/V-213 | Shut down/in decommissioning | 408 | 1 Dec 1976 | 1 Nov 1989 | 24 Nov 1989 | |
6 | PWR | VVER-440/V-213 | Finished; never entered service | 408 | ||||
Grohnde | 1 | PWR | KWU | Shut down | 1360 | 1 Jun 1976 | 1 Feb 1985 | 31 Dec 2021 |
Grosswelzheim | 1 | BWR | BWR | Dismantled | 25 | 1 Jan 1965 | 2 Aug 1970 | 20 Apr 1971 |
Gundremmingen | A | BWR | GE, BWR-1 | Shut down/in decommissioning | 237 | 12 Dec 1962 | 12 Apr 1967 | 13 Jan 1977 |
B | BWR | BWR-72 (KWU) | Shut down | 1284 | 20 Jul 1976 | 19 Jul 1984 | 31 Dec 2017 | |
C | BWR | BWR-72 (KWU) | Shut down | 1288 | 20 Jul 1976 | 18 Jan 1985 | 31 Dec 2021 | |
Isar | 1 | BWR | BWR-69 | Shut down/in decommissioning | 878 | 1 May 1972 | 21 Mar 1979 | 6 Aug 2011 |
2 | PWR | Konvoi [de] (KWU) | Shut down | 1410 | 15 Sep 1982 | 9 Apr 1988 | 15 Apr 2023 | |
Kahl | 1 | BWR | BWR | Dismantled | 15 | 1 Jul 1958 | 1 Feb 1962 | 25 Nov 1985 |
SNR-300 | 1 | FBR | Finished; never entered service | 1972 | 1985 | |||
KNK II | 1 | FBR | Shut down | 17 | 1 Sep 1974 | 3 Mar 1979 | 23 Aug 1991 | |
Krümmel | 1 | BWR | BWR-69 (KWU) | Shut down | 1346 | 5 Apr 1974 | 28 Mar 1984 | 6 Aug 2011 |
Lingen | 1 | BWR | BWR | Shut down | 183 | 1 Oct 1964 | 1 Oct 1968 | 5 Jan 1977 |
Mülheim-Kärlich | 1 | PWR | B & W | Shut down/in decommissioning | 1219 | 15 Jan 1975 | 8 Aug 1987 | 9 Sep 1988 |
MZFR | 1 | PHWR | PHWR | Shut down | 52 | 1 Dec 1961 | 19 Dec 1966 | 3 May 1984 |
Neckarwestheim | 1 | PWR | KWU | Shut down | 785 | 1 Feb 1972 | 1 Dec 1976 | 6 Aug 2011 |
2 | PWR | Konvoi [de] (KWU) | Shut down | 1310 | 9 Nov 1982 | 15 Apr 1989 | 15 Apr 2023 | |
Niederaichbach | 1 | HWGCR | Pressure tube reactor | Shut down/decommissioned | 100 | 1 Jun 1966 | 1 Jan 1973 | 31 Jul 1974 |
Obrigheim | 1 | PWR | Siemens | Shut down/in decommissioning | 340 | 15 Mar 1965 | 31 Mar 1969 | 11 May 2005 |
Philippsburg | 1 | BWR | BWR-69 | Shut down | 890 | 1 Oct 1970 | 26 Mar 1980 | 6 Aug 2011 |
2 | PWR | KWU | Shut down | 1402 | 7 Jul 1977 | 18 Apr 1985 | 31 Dec 2019 | |
Rheinsberg | 1 | PWR | VVER-70 | Shut down/in decommissioning | 62 | 1 Jan 1960 | 11 Oct 1966 | 1 Jun 1990 |
Stade | 1 | PWR | Siemens | Shut down/in decommissioning | 640 | 1 Dec 1967 | 19 May 1972 | 4 Nov 2003 |
Stendal | 1 | PWR | VVER-1000/V-320 | Unfinished | 1983 | 1990 | ||
2 | PWR | VVER-1000/V-320 | Unfinished | 1983 | 1990 | |||
THTR-300 | 1 | HTGR | PBR | Decommissioned | 296 | 3 May 1971 | 1 Jun 1987 | 29 Sep 1988 |
Unterweser | 1 | PWR | KWU | Shut down/in decommissioning | 1345 | 1 Jul 1972 | 6 Sep 1979 | 6 Aug 2011 |
Würgassen | 1 | BWR | BWR-69 (AEG) | Shut down/in decommissioning | 640 | 26 Jan 1968 | 11 Nov 1975 | 26 Aug 1994 |
Hungary
Main article: Nuclear power in HungaryPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Paks | 1 | PWR | VVER-440/V-213 | Operational | 470 | 1 Aug 1974 | 10 Aug 1983 | |
2 | PWR | VVER-440/V-213 | Operational | 473 | 1 Aug 1974 | 14 Nov 1984 | ||
3 | PWR | VVER-440/V-213 | Operational | 473 | 1 Oct 1979 | 1 Dec 1986 | ||
4 | PWR | VVER-440/V-213 | Operational | 471 | 1 Oct 1979 | 1 Nov 1987 | ||
5 | PWR | VVER-1200 | Planned | 1114 | (2025) | |||
6 | PWR | VVER-1200 | Planned | 1114 | (2025) |
India
Main article: Nuclear power in IndiaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Chutka | 1 | PHWR | IPHWR-700 | Planned | 630 | (2032) | ||
2 | PHWR | IPHWR-700 | Planned | 630 | (2033) | |||
Gorakhpur | 1 | PHWR | IPHWR-700 | Under construction | 630 | 2022 | (2028) | |
2 | PHWR | IPHWR-700 | Under construction | 630 | 2022 | (2029) | ||
3 | PHWR | IPHWR-700 | Planned | 630 | (2032) | |||
4 | PHWR | IPHWR-700 | Planned | 630 | (2033) | |||
Kaiga | 1 | PHWR | IPHWR-220 | Operational | 202 | 1 Sep 1989 | 16 Nov 2000 | |
2 | PHWR | IPHWR-220 | Operational | 202 | 1 Dec 1989 | 16 Mar 2000 | ||
3 | PHWR | IPHWR-220 | Operational | 202 | 30 Mar 2002 | 6 May 2007 | ||
4 | PHWR | IPHWR-220 | Operational | 202 | 10 May 2002 | 20 Jan 2011 | ||
5 | PHWR | IPHWR-700 | Under construction | 630 | 2022 | (2029) | ||
6 | PHWR | IPHWR-700 | Under construction | 630 | 2022 | (2030) | ||
Kakrapar | 1 | PHWR | IPHWR-220 | Operational | 202 | 1 Dec 1984 | 6 May 1993 | |
2 | PHWR | IPHWR-220 | Operational | 202 | 1 Apr 1985 | 1 Sep 1995 | ||
3 | PHWR | IPHWR-700 | Operational | 630 | 22 Nov 2010 | 30 Jun 2023 | ||
4 | PHWR | IPHWR-700 | Operational | 630 | 22 Nov 2010 | 31 Mar 2024 | ||
Kalpakkam | 1 | SFR | PFBR | Under commissioning | 490 | 23 Oct 2004 | (2025) | |
Kudankulam | 1 | PWR | VVER-1000/V-412 | Operational | 932 | 31 Mar 2002 | 31 Dec 2014 | |
2 | PWR | VVER-1000/V-412 | Operational | 932 | 4 Jul 2002 | 31 Mar 2017 | ||
3 | PWR | VVER-1000/V-412 | Under construction | 917 | 30 Jun 2017 | (2025) | ||
4 | PWR | VVER-1000/V-412 | Under construction | 917 | 23 Oct 2017 | (2026) | ||
5 | PWR | VVER-1000/V-412 | Under construction | 917 | 29 Jun 2021 | (2029) | ||
6 | PWR | VVER-1000/V-412 | Under construction | 917 | 20 Dec 2021 | (2030) | ||
Madras | 1 | PHWR | IPHWR-220 | Operation suspended (under maintenance) |
202 | 1 Jan 1971 | 27 Jan 1984 | |
2 | PHWR | IPHWR-220 | Operational | 202 | 1 Oct 1972 | 21 Mar 1986 | ||
Mahi Banswara | 1 | PHWR | IPHWR-700 | Planned | 630 | (2031) | ||
2 | PHWR | IPHWR-700 | Planned | 630 | (2032) | |||
3 | PHWR | IPHWR-700 | Planned | 630 | (2033) | |||
4 | PHWR | IPHWR-700 | Planned | 630 | (2034) | |||
Narora | 1 | PHWR | IPHWR-220 | Operational | 202 | 1 Dec 1976 | 1 Jan 1991 | |
2 | PHWR | IPHWR-220 | Operational | 202 | 1 Nov 1977 | 1 Jul 1992 | ||
Rajasthan | 1 | PHWR | CANDU | Shut down | 90 | 1 Aug 1965 | 16 Dec 1973 | 9 Oct 2004 |
2 | PHWR | CANDU | Operational | 187 | 1 Apr 1968 | 1 Apr 1981 | ||
3 | PHWR | IPHWR-220 | Operational | 202 | 1 Feb 1990 | 1 Jun 2000 | ||
4 | PHWR | IPHWR-220 | Operational | 202 | 1 Oct 1990 | 23 Dec 2000 | ||
5 | PHWR | IPHWR-220 | Operational | 202 | 18 Sep 2002 | 4 Feb 2010 | ||
6 | PHWR | IPHWR-220 | Operational | 202 | 20 Jan 2003 | 31 Mar 2010 | ||
7 | PHWR | IPHWR-700 | Under commissioning | 630 | 18 Jul 2011 | (2025) | ||
8 | PHWR | IPHWR-700 | Under construction | 630 | 30 Sep 2011 | (2026) | ||
Tarapur | 1 | BWR | BWR-1 (Mark 2) | Operation suspended (under maintenance) |
150 | 1 Oct 1964 | 28 Oct 1969 | |
2 | BWR | BWR-1 (Mark 2) | Operation suspended (under maintenance) |
150 | 1 Oct 1964 | 28 Oct 1969 | ||
3 | PHWR | IPHWR-540 | Operational | 490 | 12 May 2000 | 18 Aug 2006 | ||
4 | PHWR | IPHWR-540 | Operational | 490 | 8 Mar 2000 | 12 Sep 2005 |
Iran
Main article: Nuclear program of IranPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Bushehr | 1 | PWR | VVER-1000/V-446 | Operational | 915 | 1 May 1975 | 23 Sep 2013 | |
2 | PWR | VVER-1000/V-528 | Under construction | 915 | 27 Sep 2019 | |||
3 | PWR | VVER-1000 | Planned | 915 | ||||
Darkhovin | 1 | PWR | Unfinished; restart planned | 360 |
Italy
Main article: Nuclear power in ItalyPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Caorso | 1 | BWR | BWR-4 Mark2 | Shut down/in decommissioning | 860 | 1 Jan 1970 | 1 Dec 1981 | 1 Jul 1990 |
Enrico Fermi | 1 | PWR | WH 4-loop | Shut down/in decommissioning | 260 | 1 Jul 1961 | 1 Jan 1965 | 1 Jul 1990 |
Garigliano | 1 | BWR | BWR-1 | Shut down/in decommissioning | 150 | 1 Nov 1959 | 1 Jun 1964 | 1 Mar 1982 |
Latina | 1 | GCR | Magnox | Shut down/in decommissioning | 153 | 1 Nov 1958 | 1 Jan 1964 | 1 Dec 1987 |
Alto Lazio | 1 | BWR | Unfinished | 982 | 1 Jul 1982 | 1 Jan 1988 | ||
2 | BWR | Unfinished | 982 | 1 Jul 1982 | 1 Jul 1988 | |||
Trino 2 [IT] | 1 | PWR | Unfinished | 950 | 23 Dec 1987 | |||
2 | PWR | Unfinished | 950 | 23 Dec 1987 |
Japan
Main article: Nuclear power in JapanPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Fugen | 1 | HWLWR | ATR | Shut down | 148 | 10 May 1972 | 20 Mar 1979 | 29 Mar 2003 |
Fukushima Daiichi | 1 | BWR | BWR-3 | Inoperable | 439 | 25 Jul 1967 | 26 Mar 1971 | 19 May 2011 |
2 | BWR | BWR-4 | Inoperable | 760 | 9 Jun 1969 | 18 Jul 1974 | 19 May 2011 | |
3 | BWR | BWR-4 | Inoperable | 760 | 28 Dec 1970 | 27 Mar 1976 | 19 May 2011 | |
4 | BWR | BWR-4 | Inoperable | 760 | 12 Feb 1973 | 12 Oct 1978 | 19 May 2011 | |
5 | BWR | BWR-4 | Shut down | 760 | 22 May 1972 | 18 Apr 1978 | 17 Dec 2013 | |
6 | BWR | BWR-5 | Shut down | 1067 | 26 Oct 1973 | 24 Oct 1979 | 17 Dec 2013 | |
Fukushima Daini | 1 | BWR | BWR-5 | Shut down | 1067 | 16 Mar 1976 | 20 Apr 1982 | 30 Sep 2019 |
2 | BWR | BWR-5 | Shut down | 1067 | 25 May 1979 | 3 Feb 1984 | 30 Sep 2019 | |
3 | BWR | BWR-5 | Shut down | 1067 | 23 Mar 1981 | 21 Jun 1985 | 30 Sep 2019 | |
4 | BWR | BWR-5 | Shut down | 1067 | 28 May 1981 | 25 Aug 1987 | 30 Sep 2019 | |
Genkai | 1 | PWR | Mitsubishi (2-loop) | Shut down | 529 | 15 Sep 1971 | 15 Oct 1975 | 27 Apr 2015 |
2 | PWR | Mitsubishi (2-loop) | Shut down | 529 | 1 Feb 1977 | 30 Mar 1981 | 9 Apr 2019 | |
3 | PWR | Mitsubishi (4-loop) | Operational | 1127 | 1 Jun 1988 | 18 Mar 1994 | ||
4 | PWR | Mitsubishi (4-loop) | Operational | 1127 | 15 Jul 1992 | 25 Jul 1997 | ||
Hamaoka | 1 | BWR | BWR-4 | Shut down | 515 | 10 Jun 1971 | 17 Mar 1976 | 30 Jan 2009 |
2 | BWR | BWR-4 | Shut down | 806 | 14 Jun 1974 | 29 Nov 1978 | 30 Jan 2009 | |
3 | BWR | BWR-5 | Operation suspended (under review) |
1056 | 18 Apr 1983 | 28 Aug 1987 | ||
4 | BWR | BWR-5 | Operation suspended (under review) |
1092 | 13 Oct 1989 | 3 Sep 1993 | ||
5 | BWR | ABWR | Operation suspended | 1325 | 12 Jul 2000 | 18 Jan 2005 | ||
Higashidōri (Tōhoku) | 1 | BWR | BWR-5 | Operation suspended (under review) |
1067 | 7 Nov 2000 | 8 Dec 2005 | |
Higashidōri (Tokyo) | 1 | BWR | ABWR | Unfinished; restart planned | 1350 | 25 Jan 2011 | ||
Ikata | 1 | PWR | Mitsubishi (2-loop) | Shut down | 538 | 1 Sep 1973 | 30 Sep 1977 | 25 Mar 2016 |
2 | PWR | Mitsubishi (2-loop) | Shut down | 538 | 1 Aug 1978 | 19 Mar 1982 | 27 Mar 2018 | |
3 | PWR | Mitsubishi (3-loop) | Operational | 846 | 1 Oct 1990 | 15 Dec 1994 | ||
Kashiwazaki-Kariwa | 1 | BWR | BWR-5 | Operation suspended | 1067 | 5 Jun 1980 | 18 Sep 1985 | |
2 | BWR | BWR-5 | Operation suspended | 1067 | 18 Nov 1985 | 28 Sep 1990 | ||
3 | BWR | BWR-5 | Operation suspended | 1067 | 7 Mar 1989 | 11 Aug 1993 | ||
4 | BWR | BWR-5 | Operation suspended | 1067 | 5 Mar 1990 | 11 Aug 1994 | ||
5 | BWR | BWR-5 | Operation suspended | 1067 | 20 Jun 1985 | 10 Apr 1990 | ||
6 | BWR | ABWR | Operation suspended (restart approved) |
1315 | 3 Nov 1992 | 7 Nov 1996 | ||
7 | BWR | ABWR | Operation suspended (restart approved) |
1315 | 1 Jul 1993 | 2 Jul 1997 | ||
Mihama | 1 | PWR | Mitsubishi (2-loop) | Shut down | 320 | 1 Feb 1967 | 28 Nov 1970 | Mar 2015 |
2 | PWR | Mitsubishi (2-loop) | Shut down | 470 | 29 May 1968 | 25 Jul 1972 | Mar 2015 | |
3 | PWR | Mitsubishi (3-loop) | Operational | 780 | 7 Aug 1972 | 1 Dec 1976 | ||
Monju | 1 | FBR | Shut down | 246 | 10 May 1986 | 29 Aug 1995 | 5 Dec 2017 | |
Ōi | 1 | PWR | W (4-loop) | Shut down | 1120 | 26 Oct 1972 | 27 Mar 1979 | Dec 2017 |
2 | PWR | Westinghouse (4-loop) | Shut down | 1120 | 8 Dec 1972 | 5 Dec 1979 | Dec 2017 | |
3 | PWR | Mitsubishi (4-loop) | Operational | 1127 | 3 Oct 1987 | 18 Dec 1991 | ||
4 | PWR | Mitsubishi (4-loop) | Operational | 1127 | 13 Jun 1988 | 2 Feb 1993 | ||
Ōma | 1 | BWR | ABWR | Under construction | 1325 | 7 May 2010 | ||
Onagawa | 1 | BWR | BWR-4 | Shut down | 498 | 8 Jul 1980 | 1 Jun 1984 | 21 Dec 2018 |
2 | BWR | BWR-5 | Operational | 796 | 12 Apr 1991 | 28 Jul 1995 | ||
3 | BWR | BWR-5 | Operation suspended | 796 | 23 Jan 1998 | 30 Jan 2002 | ||
Sendai | 1 | PWR | Mitsubishi (3-loop) | Operational | 846 | 15 Dec 1979 | 4 Jul 1984 | |
2 | PWR | Mitsubishi (3-loop) | Operational | 846 | 12 Oct 1981 | 28 Nov 1985 | ||
Shika | 1 | BWR | BWR-5 | Operation suspended | 505 | 1 Jul 1989 | 30 Jul 1993 | |
2 | BWR | ABWR | Operation suspended (under review) |
1108 | 20 Aug 2001 | 15 Mar 2006 | ||
Shimane | 1 | BWR | BWR-3 | Shut down | 439 | 2 Jul 1970 | 29 Mar 1974 | Mar 2015 |
2 | BWR | BWR-5 | Operational | 789 | 2 Feb 1985 | 10 Feb 1989 | ||
3 | BWR | ABWR | Under construction | 1325 | 12 Oct 2007 | |||
Takahama | 1 | PWR | Mitsubishi (3-loop) | Operational | 780 | 25 Apr 1970 | 14 Nov 1974 | |
2 | PWR | Mitsubishi (3-loop) | Operational | 780 | 9 Mar 1971 | 14 Nov 1975 | ||
3 | PWR | Mitsubishi (3-loop) | Operational | 830 | 12 Dec 1980 | 17 Jan 1985 | ||
4 | PWR | Mitsubishi (3-loop) | Operational | 830 | 19 Mar 1981 | 5 Jun 1985 | ||
Tōkai | 1 | GCR | Magnox | Shut down | 137 | 1 Mar 1961 | 25 Jul 1966 | 31 Mar 1998 |
2 | BWR | BWR-5 | Operation suspended (restart approved) |
1060 | 3 Oct 1973 | 28 Nov 1978 | ||
Tomari | 1 | PWR | Mitsubishi (2-loop) | Operation suspended (under review) |
550 | 18 Apr 1985 | 22 Jun 1989 | |
2 | PWR | Mitsubishi (2-loop) | Operation suspended (under review) |
550 | 13 Jun 1985 | 12 Apr 1991 | ||
3 | PWR | Mitsubishi (3-loop) | Operation suspended (under review) |
866 | 18 Nov 2004 | 22 Dec 2009 | ||
Tsuruga | 1 | BWR | BWR-2 | Shut down | 340 | 24 Nov 1966 | 14 Mar 1970 | Mar 2015 |
2 | PWR | Mitsubishi (4-loop) | Operation suspended (under review) |
1108 | 6 Nov 1982 | 17 Feb 1987 |
Kazakhstan
Main article: Nuclear power in KazakhstanPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Aktau | 1 | FBR | BN-350 | Shut down/in decommissioning | 350 | 1 Oct 1964 | 16 Jul 1973 | 22 Apr 1999 |
Lithuania
Main article: Nuclear power in LithuaniaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Ignalina | 1 | LWGR | RBMK-1500 | Shut down/in decommissioning | 1185 | 1 May 1977 | 31 Dec 1983 | 31 Dec 2004 |
2 | LWGR | RBMK-1500 | Shut down/in decommissioning | 1185 | 1 Jan 1978 | Aug 1987 | 31 Dec 2009 | |
3 | LWGR | RBMK-1500 | Unfinished | 1185 |
Mexico
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Laguna Verde | 1 | BWR | BWR-5 | Operational | 804 | 1 Oct 1976 | 28 Jul 1990 | |
2 | BWR | BWR-5 | Operational | 800 | 1 Jun 1977 | 10 Apr 1995 |
Netherlands
Main article: Nuclear power in the NetherlandsPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Borssele | 1 | PWR | KWU 2LP | Operational | 482 | 1 Jul 1969 | 26 Oct 1973 | (2033) |
Dodewaard | 1 | BWR | BWR-2 | Shut down | 55 | 1 May 1965 | 26 Mar 1969 | 26 Mar 1997 |
North Korea
Main article: Nuclear power in North KoreaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Yongbyon | 1 | GCR | Magnox (Pu-production) | Shut down | 5 | 1994 | ||
2 | LWR | Planned | 30 | |||||
Taechon | 1 | Unfinished | 200 | 1994 | ||||
Kumho | 1 | PWR | Unfinished | 1000 | 2003 | |||
2 | PWR | Unfinished | 1000 | 2003 |
Pakistan
Main article: Nuclear power in PakistanPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Chashma | 1 | PWR | CNP-300 | Operational | 300 | 1 Aug 1993 | 15 Sep 2000 | |
2 | PWR | CNP-300 | Operational | 300 | 28 Dec 2005 | 18 May 2011 | ||
3 | PWR | CNP-300 | Operational | 315 | 28 May 2011 | 6 Dec 2016 | ||
4 | PWR | CNP-300 | Operational | 313 | 18 Dec 2011 | 19 Sep 2017 | ||
5 | PWR | Hualong One | Planned | 1080 | ||||
Karachi | 1 | PHWR | CANDU | Shut down | 90 | 1 Aug 1966 | 7 Dec 1972 | 1 Aug 2021 |
2 | PWR | Hualong One | Operational | 1014 | 23 May 2013 | 19 Mar 2021 | ||
3 | PWR | Hualong One | Operational | 1014 | 31 May 2016 | 18 Apr 2022 |
Philippines
Main article: Nuclear power in the PhilippinesPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Bataan | 1 | PWR | Westinghouse | Unfinished; restart planned | 621 | 1976 | 1986 |
Poland
Main article: Nuclear power in PolandPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Żarnowiec | 1 | PWR | VVER-440 | Unfinished | 440 | 31 Mar 1982 | 4 Sep 1990 | |
2 | PWR | VVER-440 | Unfinished | 440 | 31 Mar 1982 | 4 Sep 1990 | ||
Choczewo | 1 | PWR | AP1000 | Planned | 1250 | (2026) | (2033) | |
2 | PWR | AP1000 | Planned | 1250 | (2035–2036) | |||
3 | PWR | AP1000 | Planned | 1250 | (2037–2039) | |||
Pątnów | 1 | PWR | APR-1400 | Planned | 1340 | |||
2 | PWR | APR-1400 | Planned | 1340 | ||||
Włocławek | 1 | BWR | BWRX-300 | Planned | 300 | (2030) | ||
Ostrołęka | 1 | BWR | BWRX-300 | Planned | 300 | (2030) | ||
Warsaw | 1 | BWR | BWRX-300 | Planned | 300 | (2030) | ||
Tarnobrzeg/Stalowa Wola | 1 | BWR | BWRX-300 | Planned | 300 | (2030) | ||
Dąbrowa Górnicza | 1 | BWR | BWRX-300 | Planned | 300 | (2030) | ||
Stawy Monowskie | 1 | BWR | BWRX-300 | Planned | 300 | (2030) | ||
Kraków | 1 | BWR | BWRX-300 | Planned | 300 | (2030) |
Romania
Main article: Nuclear power in RomaniaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Cernavodă | 1 | PHWR | CANDU-6 | Operational | 650 | 31 Mar 1983 | 2 Dec 1996 | |
2 | PHWR | CANDU-6 | Operational | 650 | 1 Jul 1983 | 1 Nov 2007 | ||
3 | PHWR | CANDU-6 | Unfinished; restart planned | 650 | ||||
4 | PHWR | CANDU-6 | Unfinished; restart planned | 650 | ||||
5 | PHWR | CANDU-6 | Unfinished | 650 |
Russia
Main article: Nuclear power in Russia See also: List of cancelled nuclear reactors in RussiaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Akademik Lomonosov | 1 | PWR | KLT-40S | Operational | 32 | 15 Apr 2007 | 19 Dec 2019 | |
2 | PWR | KLT-40S | Operational | 32 | 15 Apr 2007 | 19 Dec 2019 | ||
Balakovo | 1 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Dec 1980 | 23 May 1986 | |
2 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Aug 1981 | 18 Jan 1988 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Nov 1982 | 8 Apr 1989 | ||
4 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Apr 1984 | 22 Dec 1993 | ||
Beloyarsk | 1 | LWGR | AMB-100 | Shut down | 102 | 1 Jun 1958 | 26 Apr 1964 | 1 Jan 1983 |
2 | LWGR | AMB-200 | Shut down | 146 | 1 Jan 1962 | 1 Dec 1969 | 1 Jan 1990 | |
3 | SFR | BN-600 | Operational | 560 | 1 Jan 1969 | 1 Nov 1981 | ||
4 | SFR | BN-800 | Operational | 789 | 18 Jul 2006 | 10 Dec 2015 | ||
5 | SFR | BN-1200 | Planned | 1100 | ||||
Bilibino | 1 | LWGR | EGP-6 | Shut down | 11 | 1 Jan 1970 | 1 Apr 1974 | 14 Jan 2019 |
2 | LWGR | EGP-6 | Operational | 11 | 1 Jan 1970 | 1 Feb 1975 | ||
3 | LWGR | EGP-6 | Operational | 11 | 1 Jan 1970 | 1 Feb 1976 | ||
4 | LWGR | EGP-6 | Operational | 11 | 1 Jan 1970 | 1 Jan 1977 | ||
Kalinin | 1 | PWR | VVER-1000/V-338 | Operational | 950 | 1 Feb 1977 | 12 Jun 1985 | |
2 | PWR | VVER-1000/V-338 | Operational | 950 | 1 Feb 1982 | 3 Mar 1987 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Oct 1985 | 8 Nov 2005 | ||
4 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Aug 1986 | 25 Dec 2012 | ||
Kaliningrad | 1 | PWR | VVER-1200/V-491 | Under construction (suspended) |
1109 | 22 Feb 2012 | ||
2 | PWR | VVER-1200/V-491 | Planned | 1109 | ||||
Kola | 1 | PWR | VVER-440/V-230 | Operational | 441 | 1 May 1970 | 28 Dec 1973 | |
2 | PWR | VVER-440/V-230 | Operational | 441 | 1 May 1970 | 21 Feb 1975 | ||
3 | PWR | VVER-440/V-213 | Operational | 441 | 1 Apr 1977 | 3 Dec 1982 | ||
4 | PWR | VVER-440/V-213 | Operational | 441 | 1 Aug 1976 | 6 Dec 1984 | ||
Kola II | 1 | PWR | VVER-S-600 | Planned | 600 | (2028) | (2034) | |
2 | PWR | VVER-S-600 | Planned | 600 | (2028) | (2034) | ||
Kostroma | 1 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1979 | ||
2 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1979 | |||
3 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1979 | |||
4 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1979 | |||
Kursk | 1 | LWGR | RBMK-1000 | Shut down | 925 | 1 Jun 1972 | 12 Oct 1977 | 19 Dec 2021 |
2 | LWGR | RBMK-1000 | Shut down | 925 | 1 Jan 1973 | 17 Aug 1979 | 31 Jan 2024 | |
3 | LWGR | RBMK-1000 | Operational | 925 | 1 Apr 1978 | 30 Mar 1984 | ||
4 | LWGR | RBMK-1000 | Operational | 925 | 1 May 1981 | 5 Feb 1986 | ||
5 | LWGR | RBMK-1000 | Unfinished | 925 | 1985 | |||
6 | LWGR | RBMK-1000 | Unfinished | 925 | 1985 | |||
Kursk II | 1 | PWR | VVER-TOI/V-510 | Under construction | 1115 | 29 Apr 2018 | (2025) | |
2 | PWR | VVER-TOI/V-510 | Under construction | 1115 | 15 Apr 2019 | (2026) | ||
3 | PWR | VVER-TOI | Planned | 1115 | ||||
4 | PWR | VVER-TOI | Planned | 1115 | ||||
Leningrad | 1 | LWGR | RBMK-1000 | Shut down | 925 | 1 Mar 1970 | 1 Nov 1974 | 21 Dec 2018 |
2 | LWGR | RBMK-1000 | Shut down | 925 | 1 Jun 1970 | 11 Feb 1976 | 10 Nov 2020 | |
3 | LWGR | RBMK-1000 | Operational | 925 | 1 Dec 1973 | 29 Jun 1980 | ||
4 | LWGR | RBMK-1000 | Operational | 925 | 1 Feb 1975 | 29 Aug 1981 | ||
Leningrad II | 1 | PWR | VVER-1200/V-491 | Operational | 1085 | 25 Oct 2008 | 29 Oct 2018 | |
2 | PWR | VVER-1200/V-491 | Operational | 1085 | 15 Apr 2010 | 22 Mar 2021 | ||
3 | PWR | VVER-1200 | Under construction | 1085 | 14 Mar 2024 | (2030) | ||
4 | PWR | VVER-1200 | Planned | 1085 | (2025) | (2032) | ||
MPEB No. 1 | 1 | PWR | RITM-200S | Under construction | 53 | 30 Aug 2022 | (2027) | |
2 | PWR | RITM-200S | Under construction | 53 | 30 Aug 2022 | (2027) | ||
MPEB No. 2 | 1 | PWR | RITM-200S | Planned | 53 | (2022) | (2027) | |
2 | PWR | RITM-200S | Planned | 53 | (2022) | (2027) | ||
MPEB No. 3 | 1 | PWR | RITM-200S | Planned | 53 | (2022) | (2028) | |
2 | PWR | RITM-200S | Planned | 53 | (2022) | (2028) | ||
MPEB No. 4 | 1 | PWR | RITM-200S | Planned | 53 | (2022) | (2031) | |
2 | PWR | RITM-200S | Planned | 53 | (2022) | (2031) | ||
Nizhny Novgorod | 1 | PWR | VVER-1200 | Planned | 1300 | |||
2 | PWR | VVER-1200 | Planned | 1300 | ||||
3 | PWR | VVER-1200 | Planned | 1300 | ||||
4 | PWR | VVER-1200 | Planned | 1300 | ||||
Novovoronezh | 1 | PWR | VVER/V-210 | Shut down | 197 | 1 Jul 1957 | 31 Dec 1964 | 16 Feb 1988 |
2 | PWR | VVER/V-365 | Shut down | 336 | 1 Jun 1964 | 14 Apr 1970 | 29 Aug 1990 | |
3 | PWR | VVER-440/V-179 | Shut down | 385 | 1 Jul 1967 | 29 Jun 1972 | 25 Dec 2016 | |
4 | PWR | VVER 440/V-179 | Operational | 385 | 1 Jul 1967 | 24 Mar 1973 | ||
5 | PWR | VVER-1000/V-187 | Operational | 950 | 1 Mar 1974 | 20 Feb 1981 | ||
Novovoronezh II | 1 | PWR | VVER-1200/V-392M | Operational | 1114 | 24 Jun 2008 | 27 Feb 2017 | |
2 | PWR | VVER-1200/V-392M | Operational | 1114 | 12 Jul 2009 | 6 Nov 2019 | ||
3 | PWR | VVER-1200 | Planned | 1175 | ||||
4 | PWR | VVER-1200 | Planned | 1175 | ||||
Obninsk | 1 | LWGR | AM-1 | Shut down | 5 | 1 Jan 1951 | 1 Dec 1954 | 29 Apr 2002 |
Rostov | 1 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Sep 1981 | 25 Dec 2001 | |
2 | PWR | VVER-1000/V-320 | Operational | 950 | 1 May 1983 | 10 Dec 2010 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 15 Sep 2009 | 27 Dec 2014 | ||
4 | PWR | VVER-1000/V-320 | Operational | 1011 | 16 Jun 2010 | 28 Sep 2018 | ||
Sakha | 1 | PWR | RITM-200N | Planned | 55 | (2024) | (2028) | |
Seversk | 1 | FBR | BREST-300 | Under construction | 280 | 8 Jun 2021 | (2026) | |
South Urals | 1 | FBR | BN-1200 | Unfinished; restart planned | 1100 | 1982 | ||
2 | FBR | BN-1200 | Unfinished; restart planned | 1100 | 1982 | |||
3 | FBR | BN-1200 | Unfinished; restart planned | 1100 | 1982 | |||
Smolensk | 1 | LWGR | RBMK-1000 | Operational | 925 | 1 Oct 1975 | 30 Sep 1983 | |
2 | LWGR | RBMK-1000 | Operational | 925 | 1 Jun 1976 | 2 Jul 1985 | ||
3 | LWGR | RBMK-1000 | Operational | 925 | 1 May 1984 | 12 Oct 1990 | ||
Smolensk II | 1 | PWR | VVER-TOI | Planned | 1300 | |||
2 | PWR | VVER-TOI | Planned | 1300 | ||||
Tatar | 1 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1980 | ||
2 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1980 |
Slovakia
Main article: Nuclear power in SlovakiaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Bohunice | A-1 | HWGCR | KS 150 | Decommissioned | 93 | 1 Aug 1958 | 25 Dec 1972 | 22 Feb 1977 |
1 | PWR | VVER-440/V-230 | Shut down | 408 | 24 Apr 1972 | 1 Apr 1980 | 31 Dec 2006 | |
2 | PWR | VVER-440/V-230 | Shut down | 408 | 24 Apr 1972 | 1 Jan 1981 | 31 Dec 2008 | |
3 | PWR | VVER-440/V-213 | Operational | 472 | 1 Dec 1976 | 14 Feb 1985 | (2045) | |
4 | PWR | VVER-440/V-213 | Operational | 471 | 1 Dec 1976 | 18 Dec 1985 | (2045) | |
Mochovce | 1 | PWR | VVER-440 V-213 | Operational | 436 | 13 Oct 1983 | 29 Oct 1998 | (2058) |
2 | PWR | VVER-440/V-213 | Operational | 436 | 13 Oct 1983 | 11 Apr 2000 | (2060) | |
3 | PWR | VVER-440/V-213 | Operational | 440 | 27 Jan 1987 | 17 Oct 2023 | ||
4 | PWR | VVER-440/V-213 | Under construction | 440 | 27 Jan 1987 |
Slovenia
Main article: Nuclear power in SloveniaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Krško | 1 | PWR | WH 2 loops | Operational | 688 | 30 Mar 1975 | 1 Jan 1983 | (2043) |
2 | PWR | TBD | Planned | 1100 | (2030) |
South Africa
Main article: Nuclear power in South AfricaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Koeberg | 1 | PWR | CP1 (France) | Operational | 930 | 1 Jul 1976 | 21 Jul 1984 | |
2 | PWR | CP1 (France) | Operational | 930 | 1 Jul 1976 | 9 Nov 1985 |
South Korea
Main article: Nuclear power in South KoreaPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation (planned) |
Closed |
---|---|---|---|---|---|---|---|---|
Hanbit | 1 | PWR | WH F | Operational | 960 | 4 Jun 1981 | 25 Aug 1986 | |
2 | PWR | WH F | Operational | 958 | 10 Dec 1981 | 10 Jun 1987 | ||
3 | PWR | OPR-1000 | Operational | 997 | 23 Dec 1989 | 31 Mar 1995 | ||
4 | PWR | OPR-1000 | Operational | 997 | 26 May 1990 | 1 Jan 1996 | ||
5 | PWR | OPR-1000 | Operational | 997 | 29 Jun 1997 | 21 May 2002 | ||
6 | PWR | OPR-1000 | Operational | 995 | 20 Nov 1997 | 24 Dec 2002 | ||
Hanul | 1 | PWR | CP1 (France) | Operational | 960 | 26 Jan 1983 | 10 Sep 1988 | |
2 | PWR | CP1 (France) | Operational | 962 | 5 Jul 1983 | 30 Sep 1989 | ||
3 | PWR | OPR-1000 | Operational | 994 | 21 Jul 1993 | 11 Aug 1998 | ||
4 | PWR | OPR-1000 | Operational | 998 | 1 Nov 1993 | 31 Dec 1999 | ||
5 | PWR | OPR-1000 | Operational | 996 | 1 Oct 1999 | 29 Jul 2004 | ||
6 | PWR | OPR-1000 | Operational | 996 | 29 Sep 2000 | 22 Apr 2005 | ||
Shin-Hanul | 1 | PWR | APR-1400 | Operational | 1340 | 10 Jul 2012 | 7 Dec 2022 | |
2 | PWR | APR-1400 | Operational | 1340 | 19 Jul 2012 | 5 Apr 2024 | ||
3 | PWR | APR-1400 | Under construction | 1340 | 30 Oct 2024 | (2032) | ||
4 | PWR | APR-1400 | Under construction | 1340 | 30 Oct 2024 | (2033) | ||
Kori | 1 | PWR | WH 60 | Shut down | 576 | 27 Apr 1972 | 29 Apr 1978 | 18 Jun 2017 |
2 | PWR | WH F | Operational | 640 | 4 Dec 1977 | 25 Jul 1983 | ||
3 | PWR | WH F | Operational | 1011 | 1 Oct 1979 | 30 Sep 1985 | ||
4 | PWR | WH F | Operational | 1012 | 1 Apr 1980 | 29 Apr 1986 | ||
Shin-Kori | 1 | PWR | OPR-1000 | Operational | 996 | 16 Jun 2006 | 28 Feb 2011 | |
2 | PWR | OPR-1000 | Operational | 996 | 5 Jun 2007 | 20 Jul 2012 | ||
Saeul | 1 | PWR | APR-1400 | Operational | 1416 | 16 Oct 2008 | 15 Jan 2016 | |
2 | PWR | APR-1400 | Operational | 1418 | 19 Aug 2009 | 29 Aug 2019 | ||
3 | PWR | APR-1400 | Under construction | 1400 | 1 Apr 2017 | |||
4 | PWR | APR-1400 | Under construction | 1400 | 20 Sep 2018 | |||
Wolsong | 1 | PHWR | CANDU-6 | Shut down | 657 | 30 Oct 1977 | 22 Apr 1983 | 24 Dec 2019 |
2 | PHWR | CANDU-6 | Operational | 655 | 22 Jun 1992 | 1 Jul 1997 | ||
3 | PHWR | CANDU-6 | Operational | 684 | 17 Mar 1994 | 1 Jul 1998 | ||
4 | PHWR | CANDU-6 | Operational | 688 | 22 Jul 1994 | 1 Oct 1999 | ||
Shin-Wolsong | 1 | PWR | OPR-1000 | Operational | 991 | 20 Nov 2007 | 31 Jul 2012 | |
2 | PWR | OPR-1000 | Operational | 960 | 23 Sep 2008 | 26 Feb 2015 |
Spain
Main article: Nuclear power in SpainPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Almaraz | 1 | PWR | WH 3 loops | Operational | 1011 | 3 Jul 1973 | 1 Sep 1983 | |
2 | PWR | WH 3 loops | Operational | 1006 | 3 Jul 1973 | 1 Jul 1984 | ||
Ascó | 1 | PWR | WH 3 loops | Operational | 995 | 16 May 1974 | 10 Dec 1984 | |
2 | PWR | WH-3 loops | Operational | 997 | 7 Mar 1975 | 31 Mar 1986 | ||
Cofrentes | 1 | BWR | BWR-6 | Operational | 1064 | 9 Sep 1975 | 11 Mar 1985 | |
José Cabrera | 1 | PWR | WH 1 loop | Shut down/in decommissioning | 141 | 24 Jun 1964 | 13 Aug 1969 | 30 Apr 2006 |
Lemoniz | 1 | PWR | Unfinished | 1972 | 1984 | |||
2 | PWR | Unfinished | 1972 | 1984 | ||||
Santa María de Garoña | 1 | BWR | BWR-3 | Shut down/in decommissioning | 446 | 11 May 1971 | 15 Feb 1975 | 6 Jul 2013 |
Trillo | 1 | PWR | KWU 3 loops | Operational | 1003 | 17 Aug 1979 | 6 Aug 1988 | |
Valdecaballeros | 1 | BWR | Unfinished | 1975 | 1984 | |||
2 | BWR | Unfinished | 1975 | 1984 | ||||
Vandellòs | 1 | GCR | UNGG | Shut down/in decommissioning | 480 | 1967 | 2 Aug 1972 | 31 Jul 1990 |
2 | PWR | WH 3 loops | Operational | 1045 | 29 Dec 1980 | 8 Mar 1988 |
Sweden
Main article: Nuclear power in SwedenPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed | |
---|---|---|---|---|---|---|---|---|---|
Ågesta | 1 | PHWR | R3 | Shut down/in decommissioning | 10 | 1 Dec 1957 | 1 May 1964 | 2 Jun 1974 | |
Barsebäck | 1 | BWR | ASEA-II | Shut down/in decommissioning | 600 | 1 Feb 1971 | 1 Jul 1975 | 30 Nov 1999 | |
2 | BWR | ASEA-II | Shut down/in decommissioning | 600 | 1 Jan 1973 | 1 Jul 1977 | 31 May 2005 | ||
Forsmark | 1 | BWR | ASEA-III, BWR-2500 | Operational | 986 | 1 Jun 1973 | 10 Dec 1980 | ||
2 | BWR | ASEA-III, BWR-2500 | Operational | 1116 | 1 Jan 1975 | 7 Jul 1981 | |||
3 | BWR | ASEA-IV, BWR-3000 | Operational | 1167 | 1 Jan 1979 | 18 Aug 1985 | |||
Oskarshamn | 1 | BWR | ASEA-I | Shut down/in decommissioning | 473 | 1 Aug 1966 | 6 Feb 1972 | 19 Jun 2017 | |
2 | BWR | ASEA-II | Shut down/in decommissioning | 638 | 1 Sep 1969 | 1 Jan 1975 | 22 Dec 2016 | ||
3 | BWR | ASEA-IV, BWR-3000 | Operational | 1450 | 1 May 1980 | 15 Aug 1985 | |||
Marviken | 1 | BHWR | R4 | Unfinished | 196 | 1 Apr 1965 | 27 May 1970 | ||
Ringhals | 1 | BWR | ASEA-I | Shut down/in decommissioning | 881 | 1 Feb 1969 | 1 Jan 1976 | 31 Dec 2020 | |
2 | PWR | WH 3-loops | Shut down/in decommissioning | 904 | 1 Oct 1970 | 1 May 1975 | 30 Dec 2019 | ||
3 | PWR | WH 3-loops | Operational | 1062 | 1 Sep 1972 | 9 Sep 1981 | |||
4 | PWR | WH 3-loops | Operational | 1104 | 1 Nov 1973 | 21 Nov 1983 |
Switzerland
Main article: Nuclear power in SwitzerlandPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Beznau | 1 | PWR | WH 2-loops | Operational | 365 | 1 Sep 1965 | 1 Sep 1969 | (2029) |
2 | PWR | WH 2-loops | Operational | 365 | 1 Jan 1968 | 1 Dec 1971 | (2031) | |
Gösgen | 1 | PWR | KWU 3-loops | Operational | 1010 | 1 Dec 1973 | 1 Nov 1979 | |
Leibstadt | 1 | BWR | BWR-6 | Operational | 1220 | 1 Jan 1974 | 15 Dec 1984 | |
Lucens | 1 | HWGCR | HWGCR | Decommissioned | 6 | 1 Apr 1962 | 29 Dec 1966 | 21 Jan 1969 |
Mühleberg | 1 | BWR | BWR-4 | Shut down/in decommissioning | 373 | 1 Mar 1967 | 6 Nov 1972 | 20 Dec 2019 |
Taiwan
Main article: Nuclear power in TaiwanPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Jinshan | 1 | BWR | BWR-4 | Shut down/in decommissioning | 636 | 2 Jun 1972 | 10 Dec 1978 | 3 Oct 2018 |
2 | BWR | BWR-4 | Shut down/in decommissioning | 636 | 7 Dec 1973 | 15 Jul 1979 | 3 Oct 2018 | |
Kuosheng | 1 | BWR | BWR-6 | Shut down | 985 | 19 Nov 1975 | 28 Dec 1981 | 1 Jul 2021 |
2 | BWR | BWR-6 | Shut down | 985 | 15 Mar 1976 | 16 Mar 1983 | 15 Mar 2023 | |
Lungmen | 1 | BWR | ABWR | Unfinished | 1350 | 31 Mar 1999 | 27 April 2014 | |
2 | BWR | ABWR | Unfinished | 1350 | 30 Aug 1999 | 27 April 2014 | ||
Maanshan | 1 | PWR | WH 312 3-loop | Shut down | 951 | 21 Aug 1978 | 27 Jul 1984 | 28 Jul 2024 |
2 | PWR | WH 312 3-loop | Operational | 951 | 21 Feb 1979 | 18 May 1985 |
Turkey
Main article: Nuclear power in TurkeyPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Akkuyu | 1 | PWR | VVER-1200/V-509 | Under construction | 1114 | 3 Apr 2018 | (2025) | |
2 | PWR | VVER-1200/V-509 | Under construction | 1114 | 8 Apr 2020 | (2026) | ||
3 | PWR | VVER-1200/V-509 | Under construction | 1114 | 10 Mar 2021 | (2027) | ||
4 | PWR | VVER-1200/V-509 | Under construction | 1114 | 21 Jul 2022 | (2028) | ||
Sinop | 1 | PWR | Atmea-1 | Cancelled | 1100 | |||
2 | PWR | Atmea-1 | Cancelled | 1100 | ||||
3 | PWR | Atmea-1 | Cancelled | 1100 | ||||
4 | PWR | Atmea-1 | Cancelled | 1100 |
Ukraine
Main article: Nuclear power in UkrainePlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Chernobyl | 1 | LWGR | RBMK-1000 | Shut down/in decommissioning | 740 | 1 Mar 1970 | 27 May 1978 | 30 Nov 1996 |
2 | LWGR | RBMK-1000 | Shut down/in decommissioning | 925 | 1 Feb 1973 | 28 May 1979 | 11 Oct 1991 | |
3 | LWGR | RBMK-1000 | Shut down/in decommissioning | 925 | 1 Mar 1976 | 8 Jun 1982 | 15 Dec 2000 | |
4 | LWGR | RBMK-1000 | Destroyed | 925 | 1 Apr 1979 | 26 Mar 1984 | 26 Apr 1986 | |
5 | LWGR | RBMK-1000 | Unfinished | 925 | ||||
6 | LWGR | RBMK-1000 | Unfinished | 925 | ||||
Chyhyryn | 1 | PWR | AP1000 | Planned | 1100 | |||
2 | PWR | AP1000 | Planned | 1100 | ||||
3 | PWR | AP1000 | Planned | 1100 | ||||
4 | PWR | AP1000 | Planned | 1100 | ||||
Crimean | 1 | PWR | VVER-1000 | Unfinished | 950 | 26 Jan 1984 | 1987 | |
2 | PWR | VVER-1000 | Unfinished | 950 | 26 Jan 1984 | 1987 | ||
Kharkiv | 1 | PWR | VVER-1000 | Unfinished | 900 | 1988 | 1990 | |
2 | PWR | VVER-1000 | Unfinished | 900 | 1988 | 1990 | ||
Khmelnytskyi | 1 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Nov 1981 | 13 Aug 1988 | |
2 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Feb 1985 | 15 Dec 2005 | ||
3 | PWR | VVER-1000 | Under construction | 950 | 1 Sep 1985 | (2026) | ||
4 | PWR | VVER-1000 | Under construction | 950 | 1 Jun 1986 | (2027) | ||
5 | PWR | AP1000 | Under construction | 1100 | April 11, 2024 | (2029) | ||
6 | PWR | AP1000 | Under construction | 1100 | April 11, 2024 | (2029) | ||
Odesa | 1 | PWR | VVER-1000 | Unfinished | 900 | 1989 | ||
2 | PWR | VVER-1000 | Unfinished | 900 | 1989 | |||
Rivne | 1 | PWR | VVER-440/V-213 | Operational | 381 | 1 Aug 1973 | 22 Sep 1981 | |
2 | PWR | VVER-440/V-213 | Operational | 376 | 1 Oct 1973 | 29 Jul 1982 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Feb 1980 | 16 May 1987 | ||
4 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Aug 1986 | 6 Apr 2006 | ||
5 | PWR | AP1000 | Planned | 1100 | ||||
South Ukraine | 1 | PWR | VVER-1000/V-302 | Operational | 950 | 1 Aug 1976 | 2 Dec 1983 | |
2 | PWR | VVER-1000/V-338 | Operational | 950 | 1 Jul 1981 | 6 Apr 1985 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Nov 1984 | 29 Dec 1989 | ||
4 | PWR | AP1000 | Planned | 1100 | ||||
Zaporizhzhia | 1 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Apr 1980 | 25 Dec 1985 | |
2 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Jan 1981 | 15 Feb 1986 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Apr 1982 | 5 Mar 1987 | ||
4 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Apr 1983 | 14 Apr 1988 | ||
5 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Nov 1985 | 27 Oct 1989 | ||
6 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Jun 1986 | 17 Sep 1996 | ||
7 | PWR | AP1000 | Planned | 1100 |
United Arab Emirates
Main article: Nuclear power in the United Arab EmiratesPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Barakah | 1 | PWR | APR-1400 | Operational | 1345 | 19 Jul 2012 | 6 Apr 2021 | |
2 | PWR | APR-1400 | Operational | 1345 | 16 Apr 2013 | 24 Mar 2022 | ||
3 | PWR | APR-1400 | Operational | 1345 | 24 Sep 2014 | 24 Feb 2023 | ||
4 | PWR | APR-1400 | Operational | 1345 | 30 Jul 2015 | 5 Sep 2024 |
United Kingdom
Main article: Nuclear power in the United Kingdom See also: Proposed nuclear power stations in the United KingdomPlant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Berkeley | 1 | GCR | Magnox | Decommissioned | 138 | 1 Jan 1957 | 12 Jun 1962 | 31 Mar 1989 |
2 | GCR | Magnox | Decommissioned | 138 | 1 Jan 1957 | 20 Oct 1962 | 26 Oct 1988 | |
Bradwell | 1 | GCR | Magnox | Decommissioned | 123 | 1 Jan 1957 | 1 Jul 1962 | 31 Mar 2002 |
2 | GCR | Magnox | Decommissioned | 123 | 1 Jan 1957 | 12 Nov 1962 | 30 Mar 2002 | |
Calder Hall | 1 | GCR | Magnox | Shut down/in decommissioning | 49 | 1 Aug 1953 | 1 Oct 1956 | 31 Mar 2003 |
2 | GCR | Magnox | Shut down/in decommissioning | 49 | 1 Aug 1953 | 1 Feb 1957 | 31 Mar 2003 | |
3 | GCR | Magnox | Shut down/in decommissioning | 49 | 1 Aug 1955 | 1 May 1958 | 31 Mar 2003 | |
4 | GCR | Magnox | Shut down/in decommissioning | 49 | 1 Aug 1955 | 1 Apr 1959 | 31 Mar 2003 | |
Chapelcross | 1 | GCR | Magnox | Shut down/in decommissioning | 48 | 1 Oct 1955 | 1 Mar 1959 | 29 Jun 2004 |
2 | GCR | Magnox | Shut down/in decommissioning | 48 | 1 Oct 1955 | 1 Aug 1959 | 29 Jun 2004 | |
3 | GCR | Magnox | Shut down/in decommissioning | 48 | 1 Oct 1955 | 1 Dec 1959 | 29 Jun 2004 | |
4 | GCR | Magnox | Shut down/in decommissioning | 48 | 1 Oct 1955 | 1 Mar 1960 | 29 Jun 2004 | |
Dounreay | 1 | SFR | DFR | Shut down/in decommissioning | 11 | 1 Mar 1955 | 1 Oct 1962 | 1 Mar 1977 |
2 | SFR | PFR | Shut down/in decommissioning | 234 | 1 Jan 1966 | 1 Jul 1976 | 31 Mar 1994 | |
Dungeness A | A-1 | GCR | Magnox | Shut down/in decommissioning | 225 | 1 Jul 1960 | 28 Oct 1965 | 31 Dec 2006 |
A-2 | GCR | Magnox | Shut down/in decommissioning | 225 | 1 Jul 1960 | 30 Dec 1965 | 31 Dec 2006 | |
Dungeness B | B-1 | GCR | AGR | Shut down | 520 | 1 Oct 1965 | 1 Apr 1985 | 7 Jun 2021 |
B-2 | GCR | AGR | Shut down | 520 | 1 Oct 1965 | 1 Apr 1989 | 7 Jun 2021 | |
Hartlepool | 1 | GCR | AGR | Operational | 595 | 1 Oct 1968 | 1 Apr 1989 | (2027) |
2 | GCR | AGR | Operational | 585 | 1 Oct 1968 | 1 Apr 1989 | (2027) | |
Heysham | A-1 | GCR | AGR | Operational | 585 | 1 Dec 1970 | 1 Apr 1989 | (2027) |
A-2 | GCR | AGR | Operational | 575 | 1 Dec 1970 | 1 Apr 1989 | (2027) | |
B-1 | GCR | AGR | Operational | 610 | 1 Aug 1980 | 1 Apr 1989 | (2030) | |
B-2 | GCR | AGR | Operational | 610 | 1 Aug 1980 | 1 Apr 1989 | (2030) | |
Hinkley Point A | 1 | GCR | Magnox | Shut down/in decommissioning | 235 | 1 Nov 1957 | 30 Mar 1965 | 23 May 2000 |
2 | GCR | Magnox | Shut down/in decommissioning | 235 | 1 Nov 1957 | 5 May 1965 | 23 May 2000 | |
Hinkley Point B | 1 | GCR | AGR | Shut down/in decommissioning | 435 | 1 Sep 1967 | 2 Oct 1978 | 1 Aug 2022 |
2 | GCR | AGR | Shut down/in decommissioning | 435 | 1 Sep 1967 | 27 Sep 1976 | 6 Jul 2022 | |
Hinkley Point C | 1 | PWR | EPR | Under construction | 1600 | 11 Dec 2018 | (2029) | |
2 | PWR | EPR | Under construction | 1600 | 12 Dec 2019 | (2030) | ||
Hunterston A | 1 | GCR | Magnox | Shut down/in decommissioning | 150 | 1 Oct 1957 | 5 Feb 1964 | 30 Mar 1990 |
2 | GCR | Magnox | Shut down/in decommissioning | 150 | 1 Oct 1957 | 1 Jul 1964 | 31 Dec 1989 | |
Hunterston B | 1 | GCR | AGR | Shut down | 460 | 1 Nov 1967 | 6 Feb 1976 | 26 Nov 2021 |
2 | GCR | AGR | Shut down | 460 | 1 Nov 1967 | 31 Mar 1977 | 7 Jan 2022 | |
Oldbury | 1 | GCR | Magnox | Shut down/in decommissioning | 217 | 1 May 1962 | 31 Dec 1967 | 29 Feb 2012 |
2 | GCR | Magnox | Shut down/in decommissioning | 217 | 1 May 1962 | 30 Sep 1968 | 30 Jun 2011 | |
Sizewell A | 1 | GCR | Magnox | Shut down/in decommissioning | 210 | 1 Apr 1961 | 25 Mar 1966 | 31 Dec 2006 |
2 | GCR | Magnox | Shut down/in decommissioning | 210 | 1 Apr 1961 | 15 Sep 1966 | 31 Dec 2006 | |
Sizewell B | 1 | PWR | WH SNUPPS | Operational | 1191 | 18 Jul 1988 | 22 Sep 1995 | (2035) |
Sizewell C | 1 | PWR | EPR | Planned | 1600 | (2024) | ||
2 | PWR | EPR | Planned | 1600 | ||||
Torness | 1 | GCR | AGR | Operational | 595 | 1 Aug 1980 | 25 May 1988 | (2030) |
2 | GCR | AGR | Operational | 595 | 1 Aug 1980 | 3 Feb 1989 | (2030) | |
Trawsfynydd | 1 | GCR | Magnox | Shut down/in decommissioning | 195 | 1 Jul 1959 | 24 Mar 1965 | 6 Feb 1991 |
2 | GCR | Magnox | Shut down/in decommissioning | 195 | 1 Jul 1959 | 24 Mar 1965 | 4 Feb 1991 | |
Winfrith | 1 | SGHWR | SGHWR | Shut down/in decommissioning | 92 | 1 May 1963 | 1 Jan 1968 | 11 Sep 1990 |
Wylfa | 1 | GCR | Magnox | Shut down/in decommissioning | 490 | 1 Sep 1963 | 1 Nov 1971 | 30 Dec 2015 |
2 | GCR | Magnox | Shut down/in decommissioning | 490 | 1 Sep 1963 | 3 Jan 1972 | 25 Apr 2012 |
United States
Main article: Nuclear power in the United States See also: List of cancelled nuclear reactors in the United States, Army Nuclear Power Program, and List of United States Naval reactors For plutonium production reactors, see Hanford Site and Savannah River Site.Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Arkansas Nuclear One | 1 | PWR | B & W (DRY-Cont) | Operational | 836 | 1 Oct 1968 | 21 May 1974 | |
2 | PWR | CE (DRY) | Operational | 988 | 6 Dec 1968 | 1 Sep 1978 | ||
Beaver Valley | 1 | PWR | WH 3-loop (DRY) | Operational | 908 | 26 Jun 1970 | 2 Jul 1976 | |
2 | PWR | WH 3-loop (DRY) | Operational | 905 | 3 May 1974 | 14 Aug 1987 | ||
Big Rock Point | 1 | BWR | BWR-1 | Dismantled | 67 | 1 May 1960 | 29 Mar 1963 | 29 Aug 1997 |
Braidwood | 1 | PWR | WH 4-loop (DRY) | Operational | 1194 | 1 Aug 1975 | 29 Jul 1988 | |
2 | PWR | WH 4-loop (DRY) | Operational | 1160 | 1 Aug 1975 | 17 Oct 1988 | ||
Browns Ferry | 1 | BWR | BWR-4 (WET) | Operational | 1200 | 1 May 1967 | 1 Aug 1974 | |
2 | BWR | BWR-4 (WET) | Operational | 1200 | 1 May 1967 | 1 Mar 1975 | ||
3 | BWR | BWR-4 (WET) | Operational | 1210 | 1 Jul 1968 | 1 Mar 1977 | ||
Brunswick | 1 | BWR | BWR-4 (WET) | Operational | 938 | 7 Feb 1970 | 18 Mar 1977 | |
2 | BWR | BWR-4 (WET) | Operational | 932 | 7 Feb 1970 | 3 Nov 1975 | ||
Byron | 1 | PWR | WH 4-loop (DRY) | Operational | 1164 | 1 Apr 1975 | 16 Sep 1985 | |
2 | PWR | WH 4-loop (DRY) | Operational | 1136 | 1 Apr 1975 | 2 Aug 1987 | ||
Callaway | 1 | PWR | WH 4-loop (DRY) | Operational | 1215 | 1 Sep 1975 | 19 Dec 1984 | |
Calvert Cliffs | 1 | PWR | CE 2-loop (DRY) | Operational | 877 | 1 Jun 1968 | 8 May 1977 | |
2 | PWR | CE 2-loop (DRY) | Operational | 855 | 1 Jun 1968 | 1 Apr 1977 | ||
Carbon Free Power Project | 1 | PWR | VOYGR | Cancelled | 77 | |||
2 | PWR | VOYGR | Cancelled | 77 | ||||
3 | PWR | VOYGR | Cancelled | 77 | ||||
4 | PWR | VOYGR | Cancelled | 77 | ||||
5 | PWR | VOYGR | Cancelled | 77 | ||||
6 | PWR | VOYGR | Cancelled | 77 | ||||
Catawba | 1 | PWR | WH 4-loop (ICECOND) | Operational | 1160 | 1 May 1974 | 29 Jun 1985 | |
2 | PWR | WH 4-loop (ICECOND) | Operational | 1150 | 1 May 1974 | 19 Aug 1986 | ||
Clinch River | 1 | BWR | BWRX-300 | Planned | 300 | |||
Clinton | 1 | BWR | BWR-6 (WET) | Operational | 1062 | 1 Oct 1975 | 24 Nov 1987 | |
Columbia | 1 | BWR | BWR-5 (WET) | Operational | 1131 | 1 Aug 1972 | 13 Dec 1984 | |
Comanche Peak | 1 | PWR | WH 4-loop (DRY) | Operational | 1205 | 19 Dec 1974 | 13 Aug 1990 | |
2 | PWR | WH 4-loop (DRY) | Operational | 1195 | 19 Dec 1974 | 3 Aug 1993 | ||
Connecticut Yankee | 1 | PWR | WH (DRY) | Dismantled | 582 | 1 May 1964 | 1 Jan 1968 | 5 Dec 1996 |
Cooper | 1 | BWR | BWR-4 (WET) | Operational | 769 | 1 Jun 1968 | 1 Jul 1974 | |
Crystal River 3 | 1 | PWR | B & W (DRY) | Shut down/in decommissioning | 860 | 25 Sep 1968 | 13 Mar 1977 | 5 Feb 2013 |
Davis–Besse | 1 | PWR | B & W (DRY) | Operational | 894 | 1 Sep 1970 | 31 Jul 1978 | |
Diablo Canyon | 1 | PWR | WH 4-Loop (DRY) | Operational | 1138 | 23 Apr 1968 | 7 May 1985 | |
2 | PWR | WH 4-Loop (DRY) | Operational | 1118 | 9 Dec 1970 | 13 Mar 1986 | ||
Donald C. Cook | 1 | PWR | WH 4-Loop (ICECOND) | Operational | 1020 | 25 Mar 1969 | 27 Aug 1975 | |
2 | PWR | WH 4-Loop (ICECOND) | Operational | 1090 | 25 Mar 1969 | 1 Jul 1978 | ||
Dresden | 1 | BWR | BWR-1 | Shut down | 197 | 1 May 1956 | 4 Jul 1960 | 31 Oct 1978 |
2 | BWR | BWR-3 (WET) | Operational | 894 | 10 Jan 1966 | 9 Jun 1970 | ||
3 | BWR | BWR-3 (WET) | Operational | 879 | 14 Oct 1966 | 16 Nov 1971 | ||
Duane Arnold | 1 | BWR | BWR-4 (WET) | Shut down | 601 | 22 May 1970 | 1 Feb 1975 | 10 Aug 2020 |
Edwin I. Hatch | 1 | BWR | BWR-4 (WET) | Operational | 924 | 30 Sep 1968 | 31 Dec 1975 | |
2 | BWR | BWR-4 (WET) | Operational | 924 | 1 Feb 1972 | 5 Sep 1979 | ||
Elk River | 1 | BWR | Dismantled | 22 | 1 Jan 1959 | 1 Jul 1964 | 1 Feb 1968 | |
Fermi | 1 | FBR | Prototype | Shut down | 61 | 8 Aug 1956 | 7 Aug 1966 | 29 Nov 1972 |
2 | BWR | BWR-4 (WET) | Operational | 1115 | 26 Sep 1972 | 23 Jan 1988 | ||
Fort Calhoun | 1 | PWR | CE 2-loop (WET) | Shut down | 482 | 7 Jun 1968 | 9 Aug 1973 | 24 Oct 2016 |
Fort St. Vrain | 1 | HTGR | General Atomics | Shut down | 330 | 1 Sep 1968 | 1 Jul 1979 | 29 Aug 1989 |
Ginna | 1 | PWR | WH 2-loop (DRY) | Operational | 560 | 25 Apr 1966 | 1 Jun 1970 | |
Grand Gulf | 1 | BWR | BWR-6 (WET) | Operational | 1401 | 4 May 1974 | 1 Jul 1985 | |
H. B. Robinson | 1 | PWR | WH 3-loop (DRY) | Operational | 735 | 13 Apr 1967 | 7 Mar 1971 | |
Hallam | 1 | SGR | Atomics International | Dismantled | 75 | 1 Jan 1959 | 1 Nov 1963 | 1 Sep 1969 |
Hartsville | A1 | BWR | BWR-6 | Unfinished | 1285 | 23 May 1975 | 29 Aug 1984 | |
A2 | BWR | BWR-6 | Unfinished | 1285 | 23 May 1975 | 29 Aug 1984 | ||
B1 | BWR | BWR-6 | Unfinished | 1285 | 23 May 1975 | 22 Mar 1983 | ||
B2 | BWR | BWR-6 | Unfinished | 1285 | 23 May 1975 | 22 Mar 1983 | ||
Hope Creek | 1 | BWR | BWR-4 (WET) | Operational | 1172 | 1 Mar 1976 | 20 Dec 1986 | |
Humboldt Bay | 1 | BWR | BWR-1 | Dismantled | 63 | 1 Nov 1960 | 1 Aug 1963 | 2 Jul 1976 |
Indian Point | 1 | PWR | Shut down | 257 | 1 May 1956 | 1 Oct 1962 | 31 Oct 1974 | |
2 | PWR | WH 4-loop (DRY) | Shut down | 998 | 14 Oct 1966 | 1 Aug 1974 | 30 Apr 2020 | |
3 | PWR | WH 4-loop (DRY) | Shut down | 1030 | 1 Nov 1968 | 30 Aug 1976 | 30 Apr 2021 | |
James A. FitzPatrick | 1 | BWR | BWR-4 (WET) | Operational | 813 | 1 Sep 1968 | 28 Jul 1975 | |
Joseph M. Farley | 1 | PWR | WH 3-Loop (DRY) | Operational | 874 | 1 Oct 1970 | 1 Dec 1977 | |
2 | PWR | WH 3-Loop (DRY) | Operational | 883 | 1 Oct 1970 | 30 Jul 1981 | ||
Kemmerer | 1 | SFR | Natrium | Under construction | 345 | 10 Jun 2024 | ||
Kewaunee | 1 | PWR | WH 2-loop (DRY) | Shut down | 566 | 6 Aug 1968 | 16 Jun 1974 | 7 May 2013 |
La Crosse | 1 | BWR | BWR-1 | Dismantled | 48 | 1 Mar 1963 | 7 Nov 1969 | 30 Apr 1987 |
LaSalle County | 1 | BWR | BWR-5 (WET) | Operational | 1137 | 10 Sep 1973 | 1 Jan 1984 | |
2 | BWR | BWR-5 (WET) | Operational | 1140 | 10 Sep 1973 | 19 Oct 1984 | ||
Limerick | 1 | BWR | BWR-5 (WET) | Operational | 1134 | 19 Jun 1974 | 1 Feb 1986 | |
2 | BWR | BWR-5 (WET) | Operational | 1134 | 19 Jun 1974 | 8 Jan 1990 | ||
Maine Yankee | 1 | PWR | WH (DRY) | Dismantled | 860 | 1 Oct 1968 | 28 Dec 1972 | 1 Aug 1997 |
Marble Hill | 1 | PWR | WH (DRY) | Unfinished | 1130 | 1 Aug 1977 | 10 Jan 1984 | |
McGuire | 1 | PWR | WH 4-Loop (ICECOND) | Operational | 1158 | 1 Apr 1971 | 1 Dec 1981 | |
2 | PWR | WH 4-Loop (ICECOND) | Operational | 1158 | 1 Apr 1971 | 1 Mar 1984 | ||
Millstone | 1 | BWR | BWR-3 (WET) | Shut down | 641 | 1 May 1966 | 28 Dec 1970 | 21 Jul 1998 |
2 | PWR | CE 2-loop (DRY) | Operational | 869 | 1 Nov 1969 | 26 Dec 1975 | ||
3 | PWR | WH 4-Loop (DRY) | Operational | 1210 | 9 Aug 1974 | 23 Apr 1986 | ||
Monticello | 1 | BWR | BWR-3 (WET) | Operational | 628 | 19 Jun 1967 | 30 Jun 1971 | |
Nine Mile Point | 1 | BWR | BWR-2 (WET) | Operational | 613 | 12 Apr 1965 | 1 Dec 1969 | |
2 | BWR | BWR-5 (WET) | Operational | 1277 | 1 Aug 1975 | 11 Mar 1988 | ||
North Anna | 1 | PWR | WH 3-Loop (DRY) | Operational | 948 | 19 Feb 1971 | 6 Jun 1978 | |
2 | PWR | WH 3-Loop (DRY) | Operational | 944 | 19 Feb 1971 | 14 Dec 1980 | ||
Oconee | 1 | PWR | B & W (DRY) | Operational | 847 | 6 Nov 1967 | 15 Jul 1973 | |
2 | PWR | B & W (DRY) | Operational | 848 | 6 Nov 1967 | 9 Sep 1974 | ||
3 | PWR | B & W (DRY) | Operational | 859 | 6 Nov 1967 | 16 Dec 1974 | ||
Oyster Creek | 1 | BWR | BWR-2 (WET) | Shut down | 619 | 15 Dec 1964 | 23 Dec 1969 | 17 Sep 2018 |
Palisades | 1 | PWR | CE 2-loop (DRY) | Shut down | 805 | 14 Mar 1967 | 31 Dec 1971 | 20 May 2022 |
Palo Verde | 1 | PWR | CE80 2-loop (DRY) | Operational | 1311 | 25 May 1976 | 28 Jan 1986 | |
2 | PWR | CE80 2-loop (DRY) | Operational | 1314 | 1 Jun 1976 | 19 Sep 1986 | ||
3 | PWR | CE80 2-loop (DRY) | Operational | 1312 | 1 Jun 1976 | 8 Jan 1988 | ||
Parr | 1 | PHWR | CVTR | Dismantled | 17 | 1 Jan 1960 | 18 Dec 1963 | 10 Jan 1967 |
Pathfinder | 1 | BWR | BWR-1 | Dismantled | 59 | 1 Jan 1959 | 1 Aug 1966 | 1 Oct 1967 |
Peach Bottom | 1 | GCR | Prototype | Shut down | 40 | 1 Feb 1962 | 1 Jun 1966 | 1 Nov 1974 |
2 | BWR | BWR-4 (WET) | Operational | 1300 | 31 Jan 1968 | 5 Jul 1974 | ||
3 | BWR | BWR-4 (WET) | Operational | 1331 | 31 Jan 1968 | 23 Dec 1974 | ||
Perry | 1 | BWR | BWR-6 (WET) | Operational | 1240 | 1 Oct 1974 | 18 Nov 1987 | |
Pilgrim | 1 | BWR | BWR-3 (WET) | Shut down | 677 | 26 Aug 1968 | 9 Dec 1972 | 31 May 2019 |
Piqua | 1 | OCR | Atomics International | Decommissioned | 12 | 1 Jan 1960 | 1 Nov 1963 | 1 Jan 1966 |
Point Beach | 1 | PWR | WH 2-loop (DRY) | Operational | 591 | 19 Jul 1967 | 21 Dec 1970 | |
2 | PWR | WH 2-loop (DRY) | Operational | 591 | 25 Jul 1968 | 1 Oct 1972 | ||
Prairie Island | 1 | PWR | WH 2-loop (DRY) | Operational | 522 | 25 Jun 1968 | 16 Dec 1973 | |
2 | PWR | WH 2-loop (DRY) | Operational | 519 | 25 Jun 1969 | 21 Dec 1974 | ||
Quad Cities | 1 | BWR | BWR-4 (WET) | Operational | 908 | 15 Feb 1967 | 18 Feb 1973 | |
2 | BWR | BWR-4 (WET) | Operational | 911 | 15 Feb 1967 | 10 Mar 1973 | ||
Rancho Seco | 1 | PWR | WH (DRY) | Decommissioned | 873 | 1 Apr 1969 | 17 Apr 1975 | 23 Jun 1989 |
River Bend | 1 | BWR | BWR-6 (WET) | Operational | 967 | 25 Mar 1977 | 16 Jun 1986 | |
Salem | 1 | PWR | WH 4-loop (DRY) | Operational | 1169 | 25 Sep 1968 | 30 Jun 1977 | |
2 | PWR | WH 4-loop (DRY) | Operational | 1158 | 25 Sep 1968 | 31 Oct 1981 | ||
San Onofre | 1 | PWR | WH (DRY) | Dismantled | 436 | 16 Jul 1964 | 1 Jan 1968 | 30 Nov 1992 |
2 | PWR | CE (DRY) | Shut down/in decommissioning | 1070 | 1 Mar 1974 | 8 Aug 1983 | 7 Jun 2013 | |
3 | PWR | CE (DRY) | Shut down/in decommissioning | 1180 | 1 Mar 1974 | 1 Apr 1984 | 7 Jun 2013 | |
Saxton | 1 | PWR | Decommissioned | 3 | 1 Jan 1960 | Nov 1961 | May 1972 | |
Seabrook | 1 | PWR | WH 4-Loop (DRY) | Operational | 1246 | 7 Jul 1976 | 15 Mar 1990 | |
Seadrift | 1 | HTGR | Xe-100 | Planned | 80 | |||
2 | HTGR | Xe-100 | Planned | 80 | ||||
3 | HTGR | Xe-100 | Planned | 80 | ||||
4 | HTGR | Xe-100 | Planned | 80 | ||||
Sequoyah | 1 | PWR | WH 4-Loop (ICECOND) | Operational | 1152 | 27 May 1970 | 1 Jul 1981 | |
2 | PWR | WH 4-Loop (ICECOND) | Operational | 1139 | 27 May 1970 | 1 Jun 1982 | ||
Shearon Harris | 1 | PWR | WH 3-Loop (DRY) | Operational | 964 | 28 Jan 1978 | 2 May 1987 | |
Shippingport | 1 | PWR | WH | Dismantled | 60 | 6 Sep 1954 | 26 May 1958 | Dec 1989 |
Shoreham | 1 | BWR | GE | Shut down | 820 | 1 Nov 1972 | 1 Aug 1986 | 1 May 1989 |
SRE | 1 | FBR | Decommissioned | 6.5 | 1954 | 12 Jul 1957 | 15 Feb 1964 | |
South Texas | 1 | PWR | WH 4-loop (DRY) | Operational | 1280 | 22 Dec 1975 | 25 Aug 1988 | |
2 | PWR | WH 4-loop (DRY) | Operational | 1280 | 22 Dec 1975 | 19 Jun 1989 | ||
St. Lucie | 1 | PWR | CE (DRY) | Operational | 981 | 1 Jul 1970 | 1 Mar 1976 | |
2 | PWR | CE (DRY) | Operational | 987 | 2 Jun 1977 | 10 Jun 1983 | ||
Surry | 1 | PWR | WH 3-loop (DRY) | Operational | 838 | 25 Jun 1968 | 22 Dec 1972 | |
2 | PWR | WH 3-loop (DRY) | Operational | 838 | 25 Jun 1968 | 1 May 1973 | ||
Susquehanna | 1 | BWR | BWR-5 (WET) | Operational | 1257 | 2 Nov 1973 | 12 Nov 1982 | |
2 | BWR | BWR-5 (WET) | Operational | 1257 | 2 Nov 1973 | 27 Jun 1984 | ||
Three Mile Island | 1 | PWR | B & W (DRY) | Shut down | 819 | 18 May 1968 | 2 Sep 1974 | 20 Sep 2019 |
2 | PWR | B & W (DRY) | Core melt | 880 | 1 Nov 1969 | 30 Dec 1978 | 28 Mar 1979 | |
Trojan | 1 | PWR | WH (DRY) | Dismantled | 1095 | 1 Feb 1970 | 20 May 1976 | 9 Nov 1992 |
Turkey Point | 3 | PWR | WH 3-Loop (DRY) | Operational | 829 | 27 Apr 1967 | 14 Dec 1972 | |
4 | PWR | WH 3-Loop (DRY) | Operational | 821 | 27 Apr 1967 | 7 Sep 1973 | ||
6 | PWR | AP1000 | Planned | 1117 | ||||
7 | PWR | AP1000 | Planned | 1117 | ||||
Vallecitos | 1 | BWR | BWR-1 | Shut down | 25 | 1 Jan 1956 | 19 Oct 1957 | 9 Dec 1963 |
Vermont Yankee | 1 | BWR | BWR-4 (WET) | Shut down | 605 | 11 Dec 1967 | 30 Nov 1972 | 29 Dec 2014 |
Virgil C. Summer | 1 | PWR | WH 3-Loop (DRY) | Operational | 973 | 21 Mar 1973 | 1 Jan 1984 | |
2 | PWR | AP1000 | Unfinished | 1117 | 9 Mar 2013 | |||
3 | PWR | AP1000 | Unfinished | 1117 | 2 Nov 2013 | |||
Vogtle | 1 | PWR | WH 4-Loop (DRY) | Operational | 1150 | 1 Aug 1976 | 1 Jun 1987 | |
2 | PWR | WH 4-Loop (DRY) | Operational | 1152 | 1 Aug 1976 | 20 May 1989 | ||
3 | PWR | AP1000 | Operational | 1117 | 12 Mar 2013 | 31 Jul 2023 | ||
4 | PWR | AP1000 | Operational | 1117 | 19 Nov 2013 | 29 April 2024 | ||
Waterford | 1 | PWR | CE 2-loop (DRY) | Operational | 1168 | 14 Nov 1974 | 24 Sep 1985 | |
Watts Bar | 1 | PWR | WH 4-Loop (ICECOND) | Operational | 1157 | 20 Jul 1973 | 27 May 1996 | |
2 | PWR | WH 4-Loop (ICECOND) | Operational | 1164 | 1 Sep 1973 | 4 Jun 2016 | ||
Wolf Creek | 1 | PWR | WH 4-Loop (DRY) | Operational | 1200 | 31 May 1977 | 3 Sep 1985 | |
Yankee Rowe | 1 | PWR | WH (DRY) | Dismantled | 167 | 1 Nov 1957 | 1 Jul 1961 | 1 Oct 1991 |
Zion | 1 | PWR | WH (DRY) | Dismantled | 1040 | 1 Dec 1968 | 31 Dec 1973 | 13 Feb 1998 |
2 | PWR | WH (DRY) | Dismantled | 1040 | 1 Dec 1968 | 17 Sep 1974 | 13 Feb 1998 |
Uzbekistan
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Plant in the Jizzakh Region | 1 | PWR | VVER-1200 | Planned | 1200 | |||
2 | PWR | VVER-1200 | Planned | 1200 |
See also
- Economics of nuclear power plants
- Integrated Nuclear Fuel Cycle Information System
- List of nuclear power stations
- List of boiling water reactors
- List of largest power stations
- List of small modular reactor designs
- List of nuclear reprocessing sites
- Lists of nuclear disasters and radioactive incidents
- Nuclear power by country
- Nuclear power reactors in Europe
Notes
- The full reactor model name is R3/Adam.
- The full reactor model name is ASEA-ATOM Gen II.
- The full reactor model name is ASEA-ATOM Gen II.
- The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69.
- The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69.
- The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75.
- The full reactor model name is ASEA-ATOM Gen I.
- The full reactor model name is ASEA-ATOM Gen II.
- The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75.
- The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.
- The full reactor model name is ASEA-ATOM Gen I. Closed at midnight on New Year's Eve.
- The full reactor model name is Westinghouse 3-loops.
- The full reactor model name is Westinghouse 3-loops.
- The full reactor model name is Westinghouse 3-loops.
References
- "World Nuclear Power Reactors & Uranium Requirements". world-nuclear.org. World Nuclear Association. Retrieved 5 May 2020.
- "PRIS – Home". pris.iaea.org.
- "Reference Unit Power" at IAEA
- "Nuclear Power in Argentina | Argentinian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 4 August 2019.
- "China inks $8 bln nuclear power plant deal in Argentina". Reuters. 2 February 2022. Retrieved 2 February 2022.
- Yulia Kosarenko. "NASA fact sheet". Archived from the original on 8 July 2007. Retrieved 20 August 2015.
- "The Embalse Nuclear Power Plant returns to service for a new cycle of 30 years". BNamericas.com.
- "Metsamor 2 to operate until 2026 : Corporate – World Nuclear News".
- "Nuclear Power in Bangladesh – World Nuclear Association". world-nuclear.org. Retrieved 17 July 2018.
- "Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина". rosatom.ru.
- "Second Belarus unit enters commercial operation". world-nuclear-news.org.
- "Doel 3: Shutdown confirmed for Friday". RTBF Info. 23 September 2022. Retrieved 25 September 2022.
- "RTBF Info of 21 Dec 2018". RTBF Info. 21 December 2018. Retrieved 28 December 2018.
- "Second Belgian reactor enters retirement : Corporate - World Nuclear News".
- ^ "Plans for New Nuclear Reactors Worldwide - World Nuclear Association".
- ^ "Bulgaria to push ahead with two new units at Kozloduy". world-nuclear-news.org. World Nuclear News. 25 October 2023. Retrieved 3 November 2023.
- "Utility abandons Pickering reactor overhaul". The Globe and Mail. 13 August 2005.
- "Ontario extends Pickering operations". World Nuclear News. 30 September 2022. Retrieved 7 July 2023.
- ^ Patel, Sonal (2 December 2021). "Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection". POWER Magazine. Retrieved 5 December 2021.
- "Additional SMRs in the pipeline for Darlington". World Nuclear News. 7 July 2023. Retrieved 7 July 2023.
- "Unit 2 sets record run ahead of planned maintenance outage". brucepower.com. 6 May 2022. Retrieved 7 July 2023.
- "Life-Extension Program & MCR Project". brucepower.com. Retrieved 7 July 2023.
- "Bruce 6 re-enters commercial operation : Corporate - World Nuclear News".
- ^ "China / Construction Begins of Two Hualong One Reactors at Changjiang". The Independent Global Nuclear News Agency. Retrieved 28 November 2019.
- ^ "我国自主三代核电华龙一号在海南正式开工建设". CNNC. Retrieved 2 April 2021.
- "China's first Hualong One nuclear reactor starts Opened". Reuters. 30 January 2021. Retrieved 30 January 2021.
- "Second Fuqing Hualong One enters Opened: New Nuclear – World Nuclear News".
- "Second AP1000 enters Opened". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
- "Fourth Chinese AP1000 enters Opened". World Nuclear News. World Nuclear Association. Retrieved 13 January 2019.
- "Begin
buildings on third Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 25 July 2022. - "Construction begins of fourth Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 26 April 2023.
- "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 16 July 2018.
- "Fifth Hongyanhe unit enters Opened". World Nuclear News. World Nuclear Association. Retrieved 2 August 2021.
- "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 15 June 2018.
- "Construction of Lufeng 5 gets under way". World Nuclear News. World Nuclear Association. Retrieved 9 September 2022.
- "Construction of Lufeng 6 begins". World Nuclear News. World Nuclear Association. Retrieved 29 August 2023.
- "Construction of new Chinese power plant begins: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 5 January 2021.
- "First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International". Retrieved 4 January 2022.
- "First AP1000 reactor enters Opened". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
- "Sanmen 2 AP1000 enters Opened – World Nuclear News". world-nuclear-news.org. Retrieved 7 November 2018.
- "PRIS – Reactor Details". pris.iaea.org. Retrieved 8 July 2022.
- "Begin
buildings on fourth Sanmen unit". world-nuclear-news.org. Retrieved 23 March 2023. - "China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News".
- "Shidaowan Guohe One 1".
- "Shidaowan Guohe One 2".
- ^ "China approves first new nuclear reactors in 3-plus years". Nikkei Asian Review. Retrieved 2 August 2019.
- "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale". Capital.fr (in French). 14 December 2018. Retrieved 14 December 2018.
- "World's second EPR starts operations". Retrieved 10 September 2019.
- "Fourth Tianwan unit enters Opened". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
- "Fifth Tianwan unit starts Opened". World Nuclear News. World Nuclear Association. Retrieved 9 September 2020.
- "Tianwan 6 enters commercial operation : New Nuclear - World Nuclear News".
- "Begin
buildings on eighth Tianwan unit: New Nuclear – World Nuclear News". - "Fast nuclear reactor to start construction in Fujian in 2017". 16 August 2015. Archived from the original on 17 August 2015. Retrieved 16 August 2015.
- "China starts building second CFR-600 fast reactor: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 30 December 2020.
- "Work on Xudabao unit 1 gets under way". world-nuclear-news.org. Retrieved 17 November 2023.
- "Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)". ruscable.ru.
- "Construction of Xudapu 4 under way: New Nuclear – World Nuclear News".
- "Yangjiang 5 enters Opened". world-nuclear-news.org. Retrieved 16 July 2018.
- "Begin
buildings on first Zhangzhou unit – World Nuclear News". world-nuclear-news.org. Retrieved 18 October 2019. - "Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News".
- "PRIS – Reactor Details".
- "Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News".
- "Nuclear power plants in Finland". STUK. 6 April 2021. Retrieved 13 May 2022.
- "Fennovoima cancels Hanhikivi 1 contract with Russia". World Nuclear Association. 3 May 2022.
- "Fennovoima terminates contract for Hanhikivi 1 NPP construction". TASS. 2 May 2022.
- "PRIS – Reactor Details".
- "Faulty seals replaced in Olkiluoto EPR : Regulation & Safety - World Nuclear News".
- "Further delay to Flamanville EPR start up". World Nuclear News.
- "EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News". world-nuclear-news.org. Retrieved 9 December 2023.
- ^ "Germany shuts three of its last six nuclear plants". Retrieved 1 January 2022.
- "German reactor permanently shut down". world-nuclear-news.org. Retrieved 10 May 2018.
- "Germany shuts down Philippsburg 2". energycentral.com. Retrieved 8 January 2020.
- ^ "Status report 74 – Indian 220 MWe PHWR (IPHWR-220)" (PDF).
- ^ "Status report 105 – Indian 700 MWe PHWR (IPHWR-700)" (PDF).
- "В Индии началось сооружение блока № 6 АЭС "Куданкулам"". ase-ec.ru (in Russian). Retrieved 21 December 2021.
- "PRIS – Reactor Details".
- "Genkai unit 4 supplying power again". world-nuclear-news.org. Retrieved 22 June 2018.
- ^ "Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute". genanshin.jp. Retrieved 3 October 2021.
- "東通原子力発電所1号機の着工について". Tokyo Electric Power Company Holdings, Inc. Retrieved 27 June 2023.
- ^ "Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)". fepc.or.jp. Retrieved 8 May 2018.
- "40年超の美浜原発3号機が再稼働 原発事故後 全国初". NHK. Retrieved 23 June 2021.
- "Ohi No.4 reactor restarted- News – NHK WORLD – English". NHK WORLD. Archived from the original on 10 May 2018. Retrieved 10 May 2018.
- "Japan's Tohoku Elec restarts Onagawa reactor after 13-year hiatus – Reuters". Reuters. Retrieved 29 October 2024.
- "運転開始40年超高浜原発1号機 約12年ぶりに再稼働". Retrieved 28 July 2023.
- "Takahama 2 reactor restarted". Retrieved 15 September 2023.
- "Japan approves extension for reactor similar to Fukushima units that melted down – Reuters". Reuters. Retrieved 29 December 2019.
- ^ "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North. U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 January 2016. Archived from the original on 9 April 2016. Retrieved 4 April 2016.
- "PRIS - Reactor Details".
- "Philippines relaunches nuclear energy programme : Nuclear Policies". World Nuclear News. 3 March 2022. Retrieved 29 April 2022.
- ^ "Poland's Westinghouse choice 'deepens strategic relationship' with USA". 31 October 2022.
- "Poland's government confirms Westinghouse for nuclear plant". 4 November 2022.
- "South Korea's KHNP signs letter of intent on Polish nuclear". 31 October 2022.
- ^ "Taki reaktor chcą zbudować Orlen i Synthos". 18 April 2023.
- "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". rosatom.ru. Retrieved 1 January 2020.
- ^ "Nuclear Power in Russia | Russian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 14 May 2018.
- "Кольскую АЭС-2 начнут строить в 2028 году". Retrieved 9 December 2023.
- "Kursk's second unit retires after 45 years operation". Retrieved 31 January 2024.
- "Запуск первого энергоблока Курской АЭС-2 планируется в декабре 2024". Ixbt.com.
- "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". rosenergoatom.ru. Retrieved 16 April 2019.
- "Russia retires Leningrad unit 1". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
- "Four New NPP Units Will be Built in Russia".
- "Ленинградской атомной станции добавят мощности". 15 March 2024.
- "Russia commits to further floating NPPs : New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 28 July 2021.
- ""Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа". Interfax.ru (in Russian). Retrieved 3 September 2021.
- "Russia plans new generation of FNPPS – Nuclear Engineering International". 6 January 2021.
- ^ "Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш". aem-group.ru. Archived from the original on 30 August 2022. Retrieved 30 August 2022.
- "В Якутии собираются строить АЭС мощностью не менее 55 МВт".
- ""Росатом" начал строительство реактора Брест-300 в Северске". 8 June 2021.
- "Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International". 26 June 2020.
- "VVER units planned for Leningrad and Smolensk".
- Shut down after a 1977 refuelling incident; decommission in progress since 1979
- "Tlačová agentúra Slovenskej republiky – TASR.sk". tasr.sk. Archived from the original on 20 January 2009.
- "Power commissioning of Mochovce 3 completed".
- "Krško gets an overhaul : Corporate – World Nuclear News".
- "Drugi blok NE Krško prve megavate mogao bi dati nakon 2030" [The second block of NPP Krško could provide the first megawatts after 2030.]. Točka na I (in Croatian). 30 November 2022. Retrieved 14 April 2023.
- "South Korean APR-1400 starts Opened : New Nuclear - World Nuclear News".
- "Unit 2 at South Korean nuclear reactor enters commercial operation". 9 April 2024.
- ^ "South Korea breaks ground for two new reactors". Retrieved 30 October 2024.
- "Second APR-1400 unit starts Opened". world-nuclear-news.org. Retrieved 3 September 2019.
- ^ "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden". The Swedish Radiation Safety Authority (in Swedish). 31 March 2007. Retrieved 12 January 2023.
- ^ "IAEA Sweden reactors". IAEA. 11 January 2023. Retrieved 12 January 2023.
- ^ "Forsmarks reaktorer i siffror" (PDF). Vattenfall (in Swedish). April 2016. Retrieved 12 January 2023.
- "MILSTOLPAR I VÅR HISTORIA". Westinghouse (in Swedish). Retrieved 12 January 2023.
- "Ringhals 1 inne på slutspurten". SVT (in Swedish). 26 October 2020. Retrieved 29 December 2020.
- admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 June 2013 at the Wayback Machine, 25 May 2011
- "Early shutdown for Taiwanese reactor : Corporate". World Nuclear News. 1 July 2021. Retrieved 29 April 2022.
- ^ "封存核四 馬英九:為下一代保留選擇權". 自由時報電子報 (in Chinese (Taiwan)). 27 April 2014. Retrieved 8 November 2024.
馬英九總統、閣揆江宜樺下午邀集黨籍縣市首長舉行會議,會後國民黨發言人范姜泰基轉述,今日會議達成兩點共識,分別是「核四一號機不施工、只安檢,安檢後封存;核四二號機全部停工」,以及「行政院承諾儘速召開全國能源會議,以確保未來供電無虞」。
- "Major components in place at Akkuyu 1 : New Nuclear". World Nuclear News. 4 March 2022. Retrieved 29 April 2022.
- "Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News".
- "Japan looks to cancel Turkish project – Nuclear Engineering International". 6 December 2018.
- "Turkey, Japan scrap partnership in Sinop nuclear plant in Turkey's north – Turkey News". 20 January 2020.
- "В Україні збудують нову атомну станцію: названо місто будівництва". GSMinfo. 22 September 2022. Retrieved 9 December 2023.
- "На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків". xaec.org.ua. 12 February 2021. Archived from the original on 24 February 2021. Retrieved 7 November 2022.
- "Ukraine begins construction of new units at Khmelnitsky NPP". 17 April 2024.
- ^ "Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO".
- "UAE's first nuclear power plant begins Openeds". Reuters. 6 April 2021. Retrieved 6 April 2021.
- "Barakah / Unit 2 Begins Opened at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency". 23 February 2022.
- "Third Barakah unit begins Opened : New Nuclear - World Nuclear News".
- "UAE Celebrates Historic Milestone as Unit 4 of the Barakah Plant Commences Commercial Operation: Delivering Full-fleet Operations". 5 September 2024.
- ^ Ambrose, Jillian (4 December 2024). "Four of UK's oldest nuclear plants to run for even longer as Hinkley Point delayed". Retrieved 4 December 2024.
- "Hinkley Point B enters retirement : Corporate – World Nuclear News". world-nuclear-news.org. Retrieved 2 August 2022.
- "PRIS – Reactor Details". pris.iaea.org. Retrieved 25 July 2022.
- "Hunterston B nuclear power station retires after 46 years in service". The Guardian. 7 January 2022.
- "The Sizewell C project – National Infrastructure Planning". infrastructure.planninginspectorate.gov.uk. Retrieved 12 April 2022.
- "PRIS – Reactor Details". pris.iaea.org. Retrieved 24 January 2019.
- "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
- "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
- "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
- "Brunswick-1". IAEA. Retrieved 14 April 2013.
- "Brunswick-2". IAEA. Retrieved 14 April 2013.
- "Scaled down SMR pilot project remains on course : New Nuclear". World Nuclear News. 23 July 2021. Retrieved 29 April 2022.
- "Idaho SMR project terminated". World Nuclear News. 9 November 2023. Retrieved 9 November 2023.
- ^ "TVA Prepares to Write Final Nuclear Chapters". American Nuclear Society. 17 April 2015. Archived from the original on 29 July 2023. Retrieved 5 October 2023.
- ^ Tennessee Valley Authority. "Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park" (PDF). Archived from the original (PDF) on 5 January 2009. Retrieved 5 October 2023.
- ^ "Entergy's Indian Point Unit 2 to Shut Down Permanently". Indian Point Energy Center. 29 April 2020. Archived from the original on 3 August 2020. Retrieved 30 April 2020.
- "PRIS – Reactor Details".
- StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 December 2014 at the Wayback Machine, 29 Dec 2014
- "Vogtle Unit 3 goes into operation". Cision. 31 July 2023. Retrieved 31 July 2023.
- "Commercial operation marks completion of Vogtle expansion : New Nuclear - World Nuclear News".
External links
- IAEA list as of 2006
- NED Database of Commercial Nuclear Power Reactors
- Reactors Database by the World Nuclear Association
Types of nuclear fission reactor | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Moderator | |||||||||||||||
Light water | |||||||||||||||
Heavy water by coolant |
| ||||||||||||||
Graphite by coolant |
| ||||||||||||||
None (fast-neutron) |
| ||||||||||||||
Others | |||||||||||||||